Predictive maintenance: act before the breakdown.

Bonbay Updated on 15 November 2026 2 min read

Choosing the first machine.

Not the newest or the most expensive: the one whose breakdown stops the rest of the workshop.

We then check that it can be measured. Some recent machines already expose their data; on older ones, we add sensors without touching the controls.

From sensor to alert.

The sensors send their readings to a unit placed near the machine. The model runs there on site: the workshop does not need a permanent connection.

During an observation period, it does not alert; it learns. We then set the threshold with your maintenance manager, to avoid false alarms that would get the real ones ignored.

What it doesn’t replace.

Regulatory inspections and the manufacturer's instructions remain mandatory.

Nor does it catch every fault. A sudden break with no warning signs escapes it. The technician’s ear and experience still matter.

Bonbay. Updated on 15 November 2026.

Your questions.

Does production have to stop to install the sensors?

Most are fitted to the outside of the machine, during a short stoppage that is already planned.

Our machines are old. Is it possible?

Yes. The added sensors measure physical quantities, without relying on the machine's electronics.

Does the data leave the factory?

Not necessarily. Processing can happen entirely on site.

Can alerts be fed into our maintenance software?

Yes, if your CMMS accepts a connection or an import.

What does the price depend on?

On the number of machines, the sensors to fit and the tool where alerts arrive. A firm quote follows a visit to the workshop.