HVAC engineering: job sheets are no longer copied out by hand.
A 52-person HVAC company was entering every job three times and reading its tenders in the evening. In five months, we connected the technicians' tablets to the management software, put an assistant on the tender packs and opened a portal for building managers.
- Client
- Heating, ventilation, air conditioning · 52 people · Gironde
- Project
- 5 mois
- Team
- 1 project manager, 1 designer, 2 developers, 1 AI specialist
The result, in figures.
- 12 days → 3 days
- between job and invoice
- 4 h → 45 min
- to analyse a tender pack and decide whether to bid
- 20 → 5 min
- per maintenance visit report
- 35 → 12
- calls a week to find out how a job is progressing
The company has two lines of business. First, new build: it bids for heating, ventilation and plumbing lots on multi-occupancy housing, schools and offices. Second, maintenance: just over 600 maintenance contracts, mostly boiler rooms in buildings run by managing agents, plus a few commercial buildings and local councils. 22 technicians set off in vans every morning, on a schedule kept by two after-sales assistants.
What we found during the audit.
Job sheets slow to become invoices
We followed 80 job sheets from one October: on average it took 12 days between the visit and the invoice. Around ten were never invoiced: a sheet forgotten in a van, or illegible. On call-outs outside a contract, that’s lost revenue.
An equipment base known only from memory
The list of boilers, air handling units and heat pumps under contract existed in three spreadsheets that didn't agree: missing serial numbers, duplicates, managing agents that had changed. The two longest-serving technicians knew everything. The others rang the office from the boiler room.
Tender packs read too late to choose well
The office receives 6 to 10 tenders a month. Each took half a day of reading to decide whether to go for it: mandatory site visit, deadlines, penalties, share of plumbing in the lot. Short of time, they bid on almost everything, and won roughly one contract in eight.
What we installed.
On site, right down to the rounds
Two days in the office with the after-sales assistants and the accountant, then two mornings in the van with technicians, including a boiler-room start-up at 7am. We collected 80 job sheets, three recent tender packs and the management software exports. The debrief to the management committee came down to a phased plan, each phase costed.
A job sheet designed for the boiler room
We designed the screen with three technicians: large buttons usable with gloves on, a photo of the rating plate, client signature by finger, and an offline mode for basements. The PDF report given to the client was redesigned in the company's colours, with a simplified logo that stays legible on a small screen.
A rebuilt website and a portal for property managers
The website dated from 2014 and only talked about boilers. We rebuilt it around the two lines of business, with a careers page, because the company recruits technicians all year round. Managing agents and council technical departments have their own area: contracts, equipment, visit reports, breakdown requests and their progress.
A tender pack summary sheet prepared by an assistant
It reads the tender rules, the lot's technical specification (CCTP) and the priced breakdown (DPGF), then fills in the sheet the owner already kept on paper: submission date and time, mandatory site visit, documents required, penalties, specified equipment, ambiguous points. Each line links to the page in the document. If the company bids, it prepares the outline of the technical proposal from proposals that have already won.
Visit reports written up properly
The technician ticks off their checks and dictates remarks in the van. The assistant turns them into a readable report, readings on one side, recommendations on the other. The after-sales assistant reviews it before it goes to the managing agent. A works recommendation becomes a quote request in the account manager's queue.
Entered at the client's site, no re-keying
The job sheet signed on the tablet creates the job in the management software, with the hours, parts taken from van stock and photos. Out-of-contract breakdowns reach the accountant as draft invoices. The month's maintenance visits are generated from the contracts, and unanswered works quotes are chased at D+10 once the account manager has approved the message.
Training at the depot and an in-house lead
Each technician was trained on their own tablet, in groups of four, one Monday morning at the depot, then accompanied for a day on their round. The after-sales assistants and the accountant had two half-days. One of the assistants became the in-house lead: she reports problems and change requests, and we review with her every month.
What stays with a person: The decision to bid or not stays with the owner, and pricing a lot with the new-build manager: the assistant reads and summarises, it prices nothing. Reports go out after review by an after-sales assistant, because a badly worded recommendation can commit the company. Diagnosing a fault remains the technician's job.
From audit to go-live.
- Weeks 1 to 3
On-site audit
Four days on the client's premises, analysis of job sheets and exports, findings presented with a phased plan.
- Weeks 3 to 7
Screen and report design
Workshops with three technicians; mock-ups tested at the depot on real tablets.
- Weeks 6 to 15
Digital job sheet and link to the management software
Planned for six weeks, this phase took ten: the software had no open connection.
- Weeks 9 to 13
Tender assistant
Brought forward during the heating start-up season, because it only involved the office.
- Weeks 12 to 19
Website and client portal
Clean-up of the equipment base, then the area opened to ten managing agents ahead of everyone else.
- Weeks 16 to 22
Roll-out, training and follow-up
Switched on team by team, support on rounds, monthly review since.
Two projects are planned for next year. First, breakdown requests from the client area, with a photo and a preferred time slot. Then extending the digital job sheet to new-build sites, for progress valuations and the as-built file (DOE). We'll start with a day on site with the team leaders.
Before and after.
| Measured | Before | After |
|---|---|---|
| Time between job and invoice | 12 days on average | 3 jours |
| Analysing a tender pack (DCE) to decide whether to bid | 4 hours of reading | 45 min of review |
| Maintenance visit report | 20 min, in the evening, by hand | 5 min checking |
| Monthly maintenance visit schedule | 1.5 days | 2 hours of adjustments |
| Client calls to follow up on a job | 35 a week | 12 a week |
What worked, what got stuck.
What worked
- The technicians kept the tablet. Six weeks after roll-out, 21 of the 22 technicians had stopped using the paper logbook. The last one retires in June, and the assistant scans his job sheets on Fridays.
- More contract lots won. 3 lots won from 14 bids. The summary sheet lets the team sort a tender in ten minutes, and the company now passes on a third of tender packs (DCE). Before, it won roughly one contract in eight.
- Every piece of equipment under contract migrated. 640 pieces of equipment, migrated one by one. The technicians checked them during their visits. Each piece of equipment now has a record with its history, viewable on the tablet and in the managing agent's area.
- Managing agents get their reports the next day. They find them in their client area before their general meeting. Since launch, two new maintenance contracts have been signed with managing agents who mentioned the area.
What got stuck, and how we fixed it
- The management software had no API. The vendor only offered a paid connector module, promised within the quarter. Without it, the tablet couldn't create a job in the management software. We use the software’s file import, run every hour, and every rejected line is flagged to the accountant. This workaround cost four weeks.
- The technicians feared being tracked by GPS. At the very first meeting, two long-serving technicians asked whether the tablet would track their movements. The same day, several technicians at the depot said they would stick with paper. We removed geolocation, and the managing director put that in writing to the whole team. A respected technician ran the first test, and the paper logbook stayed allowed for a month.
- The heating start-up season delayed the roll-out. The roll-out fell in early October, in the middle of boiler-room start-up season. The technicians were working ten-hour days and didn't have an hour to train. We pushed the roll-out back three weeks and brought forward the tender assistant, which only involved the office. Since then, we ask for the seasonal calendar at the first meeting.
Your questions.
Do we need to buy tablets for every technician?
Here, yes: the company bought 22 rugged tablets, a budget costed from the audit. The app runs on a recent phone, but the technicians wanted a bigger screen for photos of rating plates and diagrams.
What happens when there's no signal in the boiler room?
The job sheet is filled in offline and sent as soon as the tablet gets a signal again, usually back in the van. The technician can see on screen which sheets are waiting to be sent.
Can the assistant write the whole technical proposal?
It prepares an outline from your winning proposals and the CCTP: resources, references, methodology to adapt. The final wording stays with the new-build manager. A generic proposal is quickly spotted, and the buyer marks it down.
Do our prices and our clients' data leave the company?
Documents are processed by a model hosted in Europe, under contract, with no reuse for training. The company's prices are not passed to the tender assistant, which doesn't need them. With the owner, we wrote a one-page usage policy, posted up in the office.
Does your situation look like this one?
30 minutes to look at what would carry over to your business, and what wouldn’t.
More case studies.
Building materials merchant
< 1 hrObjective: to answer a routine price request
Building materials merchant: price requests prepared in the ERP before review.
A 25-person building materials merchant receives price requests by e-mail, by phone and as photos of handwritten lists.
25 people · Gironde · 4 steps Read
Civil engineering contractor
10 minObjective: to decide whether to bid, summary sheet in hand
Civil engineering: tender documents read and the bid put together without giving up your evenings.
A 60-person civil engineering contractor responds to several tenders every month.
60 people · Landes · 4 steps Read
Precision machining subcontractor
2 minObjective: to log a non-conformity at the workstation
Precision machining: non-conformities logged at the workstation, linked to work orders.
A 40-person machining subcontractor tracks its non-conformities on paper forms, then retypes them into a spreadsheet.
40 people · Lot-et-Garonne · 4 steps Read
HVAC and air-conditioning installer
÷ 2Objective: on time spent on the phone booking visits
HVAC installer: maintenance visits scheduled and job reports formatted.
An 18-person HVAC installer manages several hundred maintenance contracts with a spreadsheet and the phone.
18 people · Bordeaux Métropole · 4 steps Read
Business law firm
25 minper accounts approval file
Business law firm: AGMs prepared, clauses found.
A business law firm of twelve lawyers: 380 accounts approvals completed in nine weeks instead of thirteen, and clauses found in five minutes.
12 lawyers · Nouvelle-Aquitaine · 6 mois Read
Multidisciplinary health centre
4 hrsto reply to an admin message
Health centre: reception picks up, third-party payments come in.
Health centre in Gironde: €14,200 of third-party payment rejections recovered, and admin messages handled within half a day.
2 sites · Gironde · 5 mois Read
4-star hotel
5 mincalls a day between the head housekeeper and reception
An upmarket hotel in Gironde replies the same day, in peak season.
42 rooms, a restaurant, seminars: stay enquiries get a prepared reply and quotes go out the same day.
42 rooms · Gironde · 5 mois Read
Wine estate
0importer order re-keyed by hand
An exporting estate no longer re-keying any orders.
Importers’ purchase orders used to sit in the inbox during the harvest. They are now read, checked and entered in Sage, with a confirmation in the customer’s language.
45 hectares · Saint-Émilion, Gironde · 7 weeks, from audit to go-live Read
Artisan leather goods house
2calls a day between the shop and the workshop
A leather goods house keeps track of every piece.
A workshop of 17 craftspeople, one boutique, clients all over the world: every order is tracked from the workbench to the client, and every appointment is prepared the day before.
workshop and boutique · Nouvelle-Aquitaine · 6 mois Read
B2B SaaS company
1 hrfor monthly investor reporting
B2B SaaS company: the founders step out of support.
B2B SaaS company after its funding round: a new client imported in 3 hours instead of 2 days, and founders back on the product.
post-seed round · Gironde · 4 mois Read