Precision machining: non-conformities logged at the workstation, linked to work orders.

A 40-person machining subcontractor tracks its non-conformities on paper forms, then retypes them into a spreadsheet. We build a tablet app linked to the ERP: the operator scans the work order, describes the deviation and attaches a photo. The quality manager decides what happens next and tracks corrective actions in the same place.

Client
Precision machining subcontractor · 40 people · Lot-et-Garonne
Tools
Production ERP, Workshop tablets, Barcode scanners, Quality spreadsheet, Email
Topics
Non-conformities, Work orders, Workshop app

The objectives set at launch.

2 min
to log a non-conformity at the workstation
< 30 min
between the finding and the quality decision
1 clic
to produce the history requested in a customer audit

The workshop machines parts in small and medium batches for aerospace, rail and agricultural machinery customers. It has around fifteen machining centres and lathes, an inspection cell with a coordinate measuring machine, and runs two shifts.

When a part is out of tolerance, the operator fills in a paper form and drops it in a tray. The quality manager collects them, re-keys them into a spreadsheet and decides: rework, scrap or a concession request to the customer. Customers audit the workshop every year and ask for the history of non-conformities and corrective actions.

What’s getting stuck.

Incomplete or lost reports

Illegible work order number, measured dimension missing, operation not specified. The quality manager has to go back to the operator, who has sometimes changed shift in the meantime.

A decision that comes too late

The form is read the next day. Meanwhile, the batch waits by the machine or, worse, production carries on with the same setting.

No view by machine or by customer

The spreadsheet doesn't easily show which machine, material or routing produces the most deviations. Preparing for a customer audit takes several days of sorting.

The path of a request, from start to finish.

Step 1

Non-conformity found

At the workstation or in the inspection cell

Step 2

Work order scan

Part, customer, operation and machine pulled from the ERP

Step 3

Report completed

Defect, measured dimension, quantity, photo

Step 4

Quality decision

Rework, scrap, sorting or concession

Step 5

Action and ERP update

Corrective action tracked, quantities updated

What stays with a person: The app measures nothing and does not judge whether a part conforms: the operator or inspector records the finding, and the quality manager decides. It does not replace your quality system or your procedures; it gives them the right tools. Requests for a concession from the customer are still written and sent by a person.

What we put in place, and the schedule.

The form entered at the workstation in a few minutes

The operator scans the work order barcode. The app pulls the part number, customer, routing operation and machine from the ERP. All that's left is to choose the type of defect, enter the measured dimension and the quantity affected, and take a photo.

An immediate alert to quality

The quality manager and the team leader receive the form as soon as it is created. They decide from their phone: rework, scrap, sort the batch or request a concession. The decision appears on the workstation tablet.

Corrective actions followed through to the end

Each report can open an action with an owner and a deadline: routing change, tooling change, workstation instruction. Until the action is closed and verified, it stays on the quality manager’s list.

Quantities fed back into the ERP

Approved scrap and rework are sent back to the work order in the ERP, with no re-keying. A dashboard shows non-conformities by machine, by customer and by defect type, with an export ready for audits.

  1. 1 semaine

    Audit

    Three days in the workshop, across both shifts. We review six months of paper forms to draw up the list of defects and possible decisions.

  2. 3 semaines

    Mock-up and trial

    Screens designed with two operators and the quality manager. Trial on a cell of three machines, with real reports.

  3. 6 semaines

    Development and ERP link

    Full app, reading of production orders, quantity reporting, dashboard and audit export.

  4. 2 semaines puis suivi

    Roll-out and training

    Training by team, at the workstation. We stay reachable and come back after a month to fix whatever gets in the way in day-to-day use.

A day, before and after.

Before

  • The operator fills in a paper form and drops it in the tray.
  • The quality manager re-keys the previous day's forms into their spreadsheet.
  • The batch waits beside the machine for someone to decide.
  • Before an audit, the spreadsheet takes days to sort out.

After

  • The operator scans the work order and sends the form with a photo.
  • The quality manager decides from their phone; the instruction appears at the workstation.
  • Approved scrap is already in the ERP, so the work order schedule is accurate.
  • The history for each customer can be pulled the moment the auditor asks for it.

Your questions.

Why not buy an off-the-shelf quality software package?

Sometimes that’s the right answer, and we’ll tell you when it is. Custom development makes sense when the way you work or your ERP doesn’t fit a standard product, or when you only want this one component. We compare both options during the audit.

Will operators be willing to enter data on a tablet?

They accept it when it's faster than paper. That's why we design the screens with them, with big buttons and as little text as possible. Scanning the work order means nothing has to be copied out.

Who looks after the application once it’s delivered?

We do, under a support arrangement planned from the outset: fixes, improvements, updates when your ERP changes version. The code belongs to you and is documented, so you are not locked in.

Does your situation look like this one?

30 minutes to look at what would carry over to your business, and what wouldn’t.

More case studies.

Building materials merchant

< 1 hrObjective: to answer a routine price request

Building materials merchant: price requests prepared in the ERP before review.

A 25-person building materials merchant receives price requests by e-mail, by phone and as photos of handwritten lists.

25 people · Gironde · 4 steps Read

Civil engineering contractor

10 minObjective: to decide whether to bid, summary sheet in hand

Civil engineering: tender documents read and the bid put together without giving up your evenings.

A 60-person civil engineering contractor responds to several tenders every month.

60 people · Landes · 4 steps Read

HVAC and air-conditioning installer

÷ 2Objective: on time spent on the phone booking visits

HVAC installer: maintenance visits scheduled and job reports formatted.

An 18-person HVAC installer manages several hundred maintenance contracts with a spreadsheet and the phone.

18 people · Bordeaux Métropole · 4 steps Read

Aluminium joinery manufacturer

0Objective: re-keying for a standard range order

Joinery manufacturer: an ordering portal for installers and resellers.

An 80-person aluminium joinery manufacturer receives orders from its installers and resellers by e-mail and on handwritten order forms.

80 people · Charente-Maritime · 4 steps Read

Heating, ventilation, air conditioning

3 daysbetween job and invoice

HVAC engineering: job sheets are no longer copied out by hand.

HVAC engineering in Gironde: from boiler room to invoice in three days, and a tender pack analysed in three-quarters of an hour.

52 people · Gironde · 5 mois Read

Business law firm

25 minper accounts approval file

Business law firm: AGMs prepared, clauses found.

A business law firm of twelve lawyers: 380 accounts approvals completed in nine weeks instead of thirteen, and clauses found in five minutes.

12 lawyers · Nouvelle-Aquitaine · 6 mois Read

Multidisciplinary health centre

4 hrsto reply to an admin message

Health centre: reception picks up, third-party payments come in.

Health centre in Gironde: €14,200 of third-party payment rejections recovered, and admin messages handled within half a day.

2 sites · Gironde · 5 mois Read

4-star hotel

5 mincalls a day between the head housekeeper and reception

An upmarket hotel in Gironde replies the same day, in peak season.

42 rooms, a restaurant, seminars: stay enquiries get a prepared reply and quotes go out the same day.

42 rooms · Gironde · 5 mois Read

Wine estate

0importer order re-keyed by hand

An exporting estate no longer re-keying any orders.

Importers’ purchase orders used to sit in the inbox during the harvest. They are now read, checked and entered in Sage, with a confirmation in the customer’s language.

45 hectares · Saint-Émilion, Gironde · 7 weeks, from audit to go-live Read

Artisan leather goods house

2calls a day between the shop and the workshop

A leather goods house keeps track of every piece.

A workshop of 17 craftspeople, one boutique, clients all over the world: every order is tracked from the workbench to the client, and every appointment is prepared the day before.

workshop and boutique · Nouvelle-Aquitaine · 6 mois Read

B2B SaaS company

1 hrfor monthly investor reporting

B2B SaaS company: the founders step out of support.

B2B SaaS company after its funding round: a new client imported in 3 hours instead of 2 days, and founders back on the product.

post-seed round · Gironde · 4 mois Read