AI agents at work: connect your tools and hand over entire tasks
Your progress
0 lesson completed out of 46

A lesson is completed when you tick it, when you watch its video to the end or when you score 80% on its quiz. The certificate is issued online after the final assessment, from a score of 32 out of 40.

Your progress is saved in this browser. Log in to your client area to pick it up on your other devices.

Video transcript

Lesson 18, module 6: Designing and supervising a task Writing completion criteria an agent can check on its own How does an agent know it has finished? "A good report" versus "a table of 12 rows, one per supplier". [Diagram: Vague or checkable] Vague Checkable Six families of criteria. Deliverable, format, content Cross-checks Limits What the agent hands back The stranger test: could someone else tick it off without you?

The agent ticks off each criterion and gives its proof. Request: DONE WHEN: 12 rows, one per supplier; each price with its page; total equal to the source file. Before handing back, write for each criterion: met or not, and the proof. Response: Criterion 1, met: 12 rows (list of the 12 files read). Criterion 2, not met: 2 prices without a page, suppliers 4 and 9. Criterion 3, met: total €48,210, equal to cell F14. Produce, check, correct, two rounds at most. [Diagram: The checking loop] 1. Produce 2. Check 3. Correct 4. Hand back A limit is a completion criterion: time, credits, number of doubts. Stop after 30 minutes Stop at the third doubt Hand back what you have In the exercise, you write the DONE WHEN for a review of subcontractors. Your turn: The subcontractor review for a structural works firm The written lesson, the corrected exercise and the quiz are below the video.

Lesson 18 of 46 · module 6, designing and supervising a task

Write completion criteria an agent can check on its own

“A good report” doesn’t tell an agent when to stop. The DONE WHEN section sets observable criteria: a number of rows, named columns, a file in a given location, totals that tally, a time limit. The agent checks them before handing back; you check its evidence.

  • 31 min of reading
  • 1 min 52 of video
  • 7 diagrams
  • 3 demandes to copy
  • 3 exemples pratiques
  • 4 exercices answerss
  • 5 questions
  • 1 ressource

By the end of this lesson, you will know how to

  • Turning a vague expected result into criteria someone else can tick off without you
  • Add limits on time, credits and doubts that stop the agent in time
  • Have the agent check each criterion with its evidence, then verify that evidence

What’s covered

  1. Why “a good report” isn’t enough
  2. The six families of criteria
  3. The stranger test
  4. Have the agent check, then check yourself
  5. Limits are completion criteria too
  6. 3 worked examples, followed from start to finish
  7. Exercise with answers · An overview of a structural works contractor’s subcontractors
  8. 3 practice exercises, from guided to demanding cases
  9. The quiz

Key points

  • An agent stops when it thinks it has finished: DONE WHEN tells it, in observable criteria, what “finished” means.
  • Six families of criteria: the deliverable, the format, the content, the cross-checks, the limits, what the agent hands back.
  • A good criterion passes the stranger test: someone else can tick it off with a yes or no, without you.
  • A time limit, a credit budget or a number of doubts are end criteria: they stop the agent in time.
  • The agent ticks each criterion with its evidence; you check two pieces of evidence at random.