Lesson 47, module 12: Case studies from A to Z Case study, answering a public tender with a project, deep research and Word A 180-page file, three weeks, two people. Where do you start?
The schedule is built backwards. [Diagram: Three weeks to respond] D-21: Analyse the file D-18: Know the buyer D-14 to D-6: Write D-5: Price D-2: Check and submit The submission deadline doesn't move: the schedule is built backwards, with two days' margin. The file goes into a project, with your own documents. The buyer's documents Your references and your resources One instruction: invent nothing First prompt: what the buyer requires, and how it scores. Prompt: From the rules and the CCTP, extract: deadline, documents to submit, criteria and their weighting, numbered requirements with document and page. Summarise nothing else. Answer: Due 12 December at 12 pm. Criteria: price 40%, technical merit 60% in three sub-criteria. 47 numbered requirements, each with its document and page. Eight documents to submit. Go or no go: four questions. [Diagram: Should we answer this tender] 1. Do we have the required capacity (headcount, turnover, certifications)? 2. Do we have at least two comparable references under three years old? 3. Are the delivery time and penalties manageable? 4. Do we have time to answer properly before the deadline? Yes to all: Respond, with a person responsible for the bid and a backwards schedule. The technical proposal is written section by section, with your real references. One conversation per section The response template in Word No invented references Before submitting, no requirement without a page. [Diagram: The compliance loop] 1. List 2. Locate 3. Fill the gaps 4. Recheck A requirement with no answer located in the proposal is, in the buyer's eyes, a requirement not addressed. In the exercise, you prepare a Libourne landscaper's bid.
Your turn: A Libourne landscaper's bid The written lesson, the worked exercise and the quiz are below the video.
Lesson 47 of 50 · module 12, case studies from a to z
Case study: responding to a public tender with a project, deep research and Word
This case follows an SME responding to a public tender in three weeks: a project holding the tender documents, extraction of the requirements and criteria, the go/no-go decision, deep research on the buyer, the technical proposal written in Word, the checked price schedule and a compliance matrix before submission.
25 min of reading
1 min 56 of video
7 diagrams
4 demandes to copy
3 exemples pratiques
4 exercices answerss
5 questions
1 ressource
By the end of this lesson, you will know how to
Set up the bid project and extract requirements, criteria and timetable
Write the technical proposal section by section using only your documents
Check the response for compliance and the price schedule for consistency before submission
What’s covered
The response project
Extract, then decide
Know the buyer
The technical proposal in Word
Check before you submit
3 worked examples, followed from start to finish
Exercise with answers · The response of a landscaper in Libourne
3 practice exercises, from guided to demanding cases
The quiz
Key points
One project per tender: the buyer’s documents, your documents, and instructions that forbid inventing anything.
First extract the timetable, documents, criteria and numbered requirements, with document and page.
Decide whether to bid using four questions, then build the timetable backwards with two days’ margin.
The technical proposal is written section by section in the response template; every quantified commitment is reread as a clause.
Before you submit: no requirement without a page, a consistent price schedule, and the submission made by you.
Responding to a public tender is mostly about rigour: reading a long file, leaving out no document, answering each requirement where the buyer expects it, and meeting an unforgiving deadline. An SME that bids three or four times a year loses several days each time. This case uses the course’s tools in the order you need them: a project, the mission brief, deep research, Claude for Word, code execution and the five checks.
The response project
Create one project per tender. Its knowledge holds the tender documents (consultation rules, CCAP, CCTP, price schedule or bill of quantities, acte d’engagement – the signed tender form – and the response template if there is one) and your own documents: references for comparable contracts, staff and equipment, certifications, and the technical proposal from a contract you won, as a model for tone. A project file can be up to 30 MB; beyond the available space, Claude automatically switches to searching the documents on paid plans. Claude does not read the project name or description: everything that matters goes in the instructions.
What Claude sees in the project
Project instructions
Who we are, the contract, the rules: invent nothing, cite the document and the page.
Buyer’s documents
Consultation rules, CCAP, CCTP, schedule of prices, response template.
Our documents
References, staff and equipment, certifications, technical proposal from a contract you won.
The conversation
One conversation per section of the technical proposal, to keep answers precise.
Everything in the knowledge is used in every conversation in the project; nothing outside it is.
Create the project and its instructions
In the sidebar, open Projects, then click “+ New Project” at the top right.
Give it a name (“Tender, municipal grounds maintenance”); on Team, choose whether to keep it private or share it.
In the project’s right-hand column, click the + button under knowledge and add the documents.
Click “Set project instructions”, paste the brief below, then save.
On Team, share the project with the colleague who does the pricing (“Share project”), with edit rights.
The label may vary slightly depending on the version. Conversations in the same project don’t share their content with each other: anything that needs to be used everywhere, such as the list of requirements once extracted, should be added to the knowledge.
The response project’s instructions
<documents>
In the knowledge base: the buyer's documents (RC, CCAP, CCTP, BPU, DQE, AE, response template) and our documents (references, resources, certifications, technical proposal for the [name] contract won in [year]).
</documents>
<contexte>
We are [sector], [headcount] employees, [town]. We are responding to the tender [subject] from [type of buyer]. The buyer scores the technical proposal against the sub-criteria in the tender rules: every unproven claim costs us points, and a false claim can lead to elimination or termination of the contract.
</contexte>
<exemples>
The technical proposal for the contract we won sets the tone: concrete, quantified, organised according to the response template.
</exemples>
<mission>
You help me prepare the response: extractions, drafting the technical proposal section by section, checks.
</mission>
<rendu>
Always cite the buyer's document and page you are relying on. Never invent a reference, a headcount, equipment, a certification or a deadline: if the information is missing from our documents, write [TO BE PROVIDED: what is missing]. Never suggest a price. Write in clear administrative French, short sentences, no superlatives.
</rendu>
Roughly what you should get
Instructions of around twenty lines. From then on, every conversation in the project starts from these rules without repeating them: document and page citations, [TO BE PROVIDED] instead of inventions, no prices.
Extract, then decide
Extracting the tender documents
<mission>
From the buyer's documents only, extract:
1. The timetable: submission deadline (date and time), deadline for questions, any mandatory site visit, offer validity period.
2. The documents to submit for the application and for the offer.
3. The award criteria, their sub-criteria and their weighting, word for word.
4. The requirements of the CCTP and the tender rules, numbered E1, E2…, each with the document and page.
5. The points that warrant a question to the buyer.
</mission>
<rendu>
Five parts, as tables. No summary of the tender file beyond these five parts. The job is done when every requirement has a document and a page.
</rendu>
Roughly what you should get
A four-line timetable, a list of eight to twelve documents, the criteria copied out with their weightings, a table of forty to sixty numbered requirements, and three to five questions to ask on the buyer’s tendering platform before the deadline for questions.
Add this table to the project knowledge base as “exigences.md”: every subsequent conversation will refer to it.Should you respond to this tender
1Do we have the required capacity (headcount, turnover, certifications)?
No Don’t bid alone: form a consortium or subcontract, or sit this one out.
2Do we have at least two comparable references less than three years old?
No The technical score will be weak: pass, unless the contract is small.
3Are the delivery time and penalties manageable?
No Ask the buyer before the deadline for questions.
4Do we have time to respond properly before the deadline?
No A rushed bid costs more than no bid: sit this one out.
Yes to allBid, with a bid lead and a backward timetable.
A bid costs two to five days’ work: decide on the file, not on enthusiasm.
Know the buyer
On paid plans, deep research runs dozens of searches in a row and returns a sourced report while you get on with something else. Turn on web search, then click the + button in the input field and “Research”: a blue indicator appears. It also queries the connectors you have switched on, without asking permission each time: switch off any that have no place in research on a public buyer. Started from a phone, it uses only the web. It uses up your usage limit quickly: one well-scoped research beats three vague ones.
Deep research on the buyer
<contexte>
We are responding to the tender [subject] from [buyer, town]. I want to understand what matters to this buyer, using public sources only.
</contexte>
<exemples>none</exemples>
<mission>
Search for: recent council decisions and public documents that mention this service; comparable contracts awarded by this buyer and their award notices; its public commitments (climate plan, responsible purchasing policy, social inclusion); problems with this service reported in the local press.
</mission>
<rendu>
A report of no more than two pages, in five parts, each statement followed by its link. Separate what is established by a buyer's document from what comes from the press. End with three points our technical proposal should address, each linked to a source.
</rendu>
Roughly what you should get
A two-page report with around fifteen links: the council decision creating the contract, two previous award notices, the local authority’s climate plan, a press article about delays by the previous contractor, then three points for the technical proposal (responsiveness, differentiated management, social inclusion).
The technical proposal in Word
Write the technical proposal section by section, one conversation per section, following the buyer’s response template if there is one, otherwise the structure of its sub-criteria. If the template is a Word file, the Claude for Word add-in fills in the sections using the document’s styles without breaking the layout; it cites the sections and, in track changes mode, each addition becomes a revision to accept. The rule stays the same: your references, resources and lead times come from your documents; anything missing becomes [TO BE PROVIDED].
Who does what in the response
Document
Claude
You
Extracting the tender documents
Requirements, criteria, timetable, with documents and pages
Check the deadline and the documents to submit
Technical proposal
First draft per section, following the template, from your documents
Complete the [TO BE SUPPLIED] items, reread every commitment
Price schedule and bill of quantities
Consistency check: quantities, totals, units
Set every price
Application (DUME or DC1 and DC2)
List of information to gather
Complete and sign
Submission
Final checklist
Submit on the buyer profile, with the required signature
Check before you submit
The compliance loop
1List
Every requirement in the CCTP and the consultation rules, numbered.
2Locate
The page of the technical proposal that addresses it.
3Fill the gap
Write what is missing.
4Recheck
Until no requirement is left without a page.
A requirement with no answer located in the technical proposal is, as far as the buyer is concerned, a requirement not addressed.
Two final checks make the difference. The compliance matrix: Claude takes the list of requirements and gives, for each one, the page of the technical proposal that addresses it; any requirement without a page is dealt with before submission. The price schedule check: by running code on the bill of quantities you filled in, Claude checks that each total equals quantity times price, that the grand total is correct and that the units match those in the price schedule. It does not judge your prices. Submission, electronic signature and the buyer profile’s acknowledgement of receipt remain your job: download the acknowledgement and file it.
Three weeks to respond
J-21Analyse the tender file
Project created, requirements and criteria extracted, decision to bid.
J-18Know the buyer
Deep research on its public sources.
D-14 to D-6Write
The technical proposal section by section, in the response template.
J-5Put figures on it
The price schedule filled in by you, the consistency checked by Claude.
J-2Check and submit
Compliance matrix, documents, signature, submission by you.
The submission deadline doesn’t move: build the timetable backwards, with two days’ margin.
Mistakes to avoid
Ask Claude to “summarise the tender” and respond from the summary.
A summary loses the detailed requirements, the documents to submit and the exact wording of the criteria, which the buyer scores.
Have it extract the timetable, documents, criteria word for word and numbered requirements, with document and page.
Let the technical proposal improve the commitments to stand out.
A promised lead time or headcount becomes part of the contract, and a contractor who fails to deliver it faces penalties.
Provide the commitments in the context and reread every figure in the technical proposal as a clause.
Ask Claude to set or adjust the prices in the price schedule.
It knows neither your costs nor the local market, and a price that is too low may be judged abnormally low.
Set the prices yourself and ask only for the consistency check: totals, units, grand total.
Submit the evening before the deadline.
An electronic signature that fails or a file too large for the buyer’s tendering platform, and the bid arrives late.
Build two days’ margin into the backward timetable and keep the submission receipt.
3 SME situations followed from start to finish: the prompts exactly as they were written, the model answer to aim for, and what was checked before sending.
Example 1
A joint authority’s communications contract
Thomas runs an 8-person communications agency in Bordeaux. A joint waste management authority is launching a four-year communications framework agreement. The file runs to 140 pages, and the agency has only bid for two public contracts so far.
A framework agreement in four steps
1Extraction
38 requirements, two questions.
2Questions asked
Answer within a week.
3Memory
Section by section, backed by CVs.
4Compliance
38 requirements, 38 pages.
Request 1
<mission>
From the buyer's documents in the knowledge base, extract the timetable, the documents to submit, the criteria and their weighting, and the numbered requirements with document and page.
</mission>
<rendu>
Four tables. Then the points that warrant a question to the buyer.
</rendu>
Model answer
Timetable: submission on 8 January 2027 at 4pm, questions until 18 December, tenders valid for 120 days.
Criteria: technical merit 55% (methodology 25%, team 15%, case study 15%), price 45%.
Requirements: 38, from E1 “dedicated contact” (CCTP p. 6) to E38 “assignment of rights in the creative work” (CCAP p. 14).
Questions: is the case study paid? (RC p. 9, silent); is the annual volume of purchase orders estimated? (CCAP p. 3, maximum amount only).
Thomas asks both questions on the buyer’s tendering platform the same day. The answer comes a week later: the case study is unpaid.
Request 2
<contexte>
“Team” section of the technical proposal, 15% of the score. Our CVs are in the knowledge base.
</contexte>
<mission>
Write the “team” section, presenting the four people assigned to the contract.
</mission>
<rendu>
One and a half pages: role, experience relevant to the contract, availability. Nothing that isn't in the CVs. [TO BE PROVIDED] for each person's availability rate.
</rendu>
Model answer
A page and a half: an account director as single point of contact, a copywriter, a graphic designer and a digital project manager, each with two or three experiences taken from their CV, including a waste-sorting campaign for an inter-municipal authority, and four [TO BE PROVIDED] on availability.
He fills in the availability and removes an experience the graphic designer had at a previous agency but cannot show.
What was checked before sending
Sources: the deadline and the weightings rechecked in the consultation rules.
Facts and figures: every experience in the team section traced to a CV.
Tone and audience: the section reread as a public buyer would, without superlatives.
Rough estimate: three days’ work instead of five for the full response.
Example 2
The energy renovation of a secondary school
Patricia is head of cost estimating at a 55-employee joinery company in Angoulême. A département (county council) is launching the energy renovation of a secondary school, external joinery lot. The quantity breakdown has 64 lines, and an inconsistency got one of their bids rejected last year.
Checking the bill of quantities
Before
Two hours of checking by eye
A bid rejected last year
After
64 lines checked by code
Three discrepancies corrected before signing
Request 1
<documents>
“DQE-lot-04-rempli.xlsx”, completed by our pricing department, and the buyer's “BPU-lot-04.pdf”.
</documents>
<contexte>
Exterior joinery lot, renovation of a secondary school. We are not asking for any opinion on prices.
</contexte>
<exemples>none</exemples>
<mission>
By running code, check each line of the quantity breakdown (DQE): total equals quantity times unit price, unit identical to the one in the price schedule (BPU), unit price identical to the price schedule's for the same item. Then the grand total.
</mission>
<rendu>
The list of discrepancies with the line number, or “no discrepancies”. The recalculated grand total. The code at the end.
</rendu>
Model answer
64 lines checked. Three discrepancies:
Line 17: total €4,860 excl. VAT, quantity × price = €4,680 excl. VAT (transposed digits).
Line 31: unit “m²” in the DQE, “ml” (linear metres) in the BPU.
Line 52: unit price €1,240 excl. VAT in the DQE, €1,420 excl. VAT in the BPU for item 4.12.
Grand total recalculated after correcting line 17: €486,320 excl. VAT, against €486,500 excl. VAT shown.
[code run]
Patricia corrects the three lines with the pricing team. Line 52 is the most serious: the price in the schedule of prices prevails, and that was the correct one.
Request 2
Once corrections are made, run the same check again on the attached updated file.
Model answer
64 lines checked, no discrepancies. Grand total: €486,320 excl. VAT, matching the total shown.
[code run]
The file goes off for signature.
What was checked before sending
The calculations: line 17 and the total redone in Excel.
Sources: article 4.12 found in the price schedule.
Facts and figures: no price changed by Claude, corrections made by the pricing team.
Rough estimate: twenty minutes instead of two hours of checking, and three discrepancies found that a read-through by eye had missed.
Example 3
The decision not to bid
Fabrice manages a 12-employee cleaning company in Dax. A hospital is tendering for the cleaning of its administrative offices. The salesperson wants to bid; Fabrice has one morning to decide.
Decide in a morning
1Four questions
A “no” on capabilities.
2Threshold checked
Page 5 of the consultation rules.
3Consortium considered
The fellow firm declines.
4No response
Four days saved.
Request 1
<mission>
Using the tender rules and the CCTP in the knowledge base, and our documents (headcount, turnover, references, certifications), answer the four questions: capabilities, comparable references, deadlines and penalties, time to respond.
</mission>
<rendu>
For each question: yes or no, the buyer's document and page, what our documents show. Then what would be missing to respond.
</rendu>
Model answer
Capacity: no. The consultation rules (p. 5) require average annual turnover of at least €800,000 excl. VAT over three years; our documents show €610,000 excl. VAT.
References: yes, two references for offices over 1,000 m².
Deadlines and penalties: to be checked, penalty of €300 per service not performed (CCAP p. 11).
Time: yes, submission in 19 days.
What would be missing: a consortium partner to reach the required turnover.
Fabrice checks page 5: the threshold is indeed stated. He calls a fellow firm in Mont-de-Marsan about a consortium.
Request 2
Using the consultation rules, list what a consortium would change in the documents to submit and in the technical proposal.
Model answer
According to the consultation rules (pp. 6 and 7): one application per consortium member, the appointment of a lead member, the split of services between members in the technical proposal, and each member’s commitment in the acte d’engagement. One question for the buyer: is a joint and several consortium required? (RC p. 6, ambiguous wording)
The fellow firm declines. Fabrice doesn’t bid, and keeps the project for the hospital’s next tender.
What was checked before sending
Sources: the turnover threshold found on page 5.
Facts and figures: the company’s turnover compared against the tax return.
Rough estimate: a morning to decide, instead of four days spent on a bid that would have been inadmissible.
You are Élodie, executive assistant at a 25-employee landscaping company in Libourne. A municipality of 12,000 inhabitants in the Gironde is launching a three-year grounds maintenance contract. The consultation rules: submission on 12 December at 12pm, questions until 2 December, mandatory site visit on 26 November. Criteria: price 40%, technical merit 60% (methodology and resources 30%, differentiated management and environment 20%, responsiveness 10%). The CCTP requires, among other things, zero pesticides, a response within 24 hours after a storm, and a single point of contact. Your documents: three references from neighbouring municipalities, the equipment list, the organisation chart. Today is 18 November. Prepare the response.
Build the timetable backwards from 12 December, including the site visit and the deadline for questions.
Apply the four decision questions.
Write the request to draft the “responsiveness” section of the technical proposal.
Plan for both final checks.
See the answers
The timetable
Date
Step
18 novembre
Project created, requirements extracted, decision
19 novembre
Deep research on the municipality
26 novembre
Mandatory site visit, notes dictated on site
2 December
Last day for questions
27 November to 8 December
Technical proposal section by section, schedule of prices completed by the managing director
10 December
Compliance matrix, schedule of prices check, signature, submission
12 December, 12pm
Deadline, with two days’ margin kept
The “responsiveness” section of the technical proposal
<documents>
In the knowledge base: the CCTP (technical specifications), the tender rules, exigences.md, our organisation chart, the equipment list, our three references.
</documents>
<contexte>
“Responsiveness” sub-criterion, 10% of the score. Relevant requirements: intervention within 24 hours after a storm, single point of contact. Our organisation: one on-call team leader per week, two lorries equipped with chainsaws and a wood chipper, depot 15 minutes from the municipality.
</contexte>
<exemples>The equivalent section of the technical proposal that won in 2025.</exemples>
<mission>
Write the “responsiveness” section of the technical proposal.
</mission>
<rendu>
One page, structured as: single point of contact, on-call rota, response time, resources deployed, lessons learned from a storm in one of our references. Each requirement cited with its number. [TO BE PROVIDED] for any information missing from our documents, in particular the contact's name and the date of the storm cited.
</rendu>
Roughly what you should get
One page in five paragraphs, requirements E14 and E22 cited, the on-call rota described, the 24-hour response time repeated without improving on it, and two [TO BE PROVIDED]: the name of the single point of contact and the date of the post-storm intervention in the neighbouring municipality.
The four questions: capacity yes, three comparable references yes, delivery time manageable with the on-call rota, enough time with two days’ margin. Answer: bid.
The compliance matrix: every requirement, including zero pesticides, linked to a page of the technical proposal.
The price schedule: filled in by the manager; Claude checks the totals and units by running code, without commenting on the prices.
The trap in this exercise: don’t promise “response within 4 hours” to stand out if your on-call rota can’t deliver it on a stormy Sunday. The CCTP requires 24 hours; a shorter commitment becomes part of the contract.
Practise
Three more exercises, from the most guided to the most demanding. The material is provided in full: copy it into your tool, then check your work against the criteria before opening the answers.
Level 1 · guided10 min
Extract the criteria from consultation rules
Here is the article from a municipality’s consultation rules for a heating installation maintenance contract. Write the mission brief that extracts the criteria, and calculate the actual weight of each sub-criterion in the final score.
The material to work on
ARTICLE 8, EVALUATION OF TENDERS
Tenders will be evaluated on the following criteria:
1. Price of services: 40%
2. Technical merit: 60%, assessed on the basis of the technical proposal against the following sub-criteria:
2.1 Organisation and staff assigned: 50% of technical merit
2.2 Preventive maintenance methodology: 30% of technical merit
2.3 Environmental approach: 20% of technical merit
Check your work
The brief asks for the criteria word for word, with the article
Organisation accounts for 30% of the final score
The methodology weighs 18%
The environmental approach weighs 12%
See the answers
The mission brief
<documents>
[The tender rules.]
</documents>
<contexte>
Heating maintenance company, responding to a municipality.
</contexte>
<exemples>none</exemples>
<mission>
Copy word for word the award criteria and sub-criteria, with the article, then calculate the weight of each sub-criterion in the final score.
</mission>
<rendu>
A table: criterion, sub-criterion, stated weight, weight in the final score. The calculation shown.
</rendu>
Organisation weighs almost as much as price within the technical score: that is where the technical proposal must be strongest and best evidenced.
Level 2 · independent20 min
Check a bill of quantities
Here is an extract from the quantity breakdown of an 18-employee painting company in Agen. Write the mission brief for the check, then do it yourself: find the discrepancies and the correct total.
The material to work on
line;item;description;unit;quantity;unit_price_excl_vat;total_excl_vat
1;3.1;Painting of classroom walls;m²;1,850;14.20;26,270.00
2;3.2;Painting of ceilings;m²;920;16.50;15,180.00
3;3.3;Wood stain on timber joinery;lin. m;340;22.00;7,840.00
4;3.4;Floor protection;lump sum;1;1,200.00;1,200.00
TOTAL;;;;;;50,490.00
SCHEDULE OF PRICES (extract)
3.3 Wood stain on timber joinery: unit lin. m
3.4 Floor protection: unit lump sum
Check your work
The brief asks for every total, the units and the grand total to be checked
You find the discrepancy on line 3: 340 × 22 = €7,480
You find the correct total: €50,130 excl. VAT
You don’t change any unit price
See the answers
The mission brief
<documents>
[The quantity breakdown and the extract from the price schedule.]
</documents>
<contexte>
Painting company in Agen with 18 employees. Quantity breakdown completed by us; the buyer's price schedule is authoritative for units.
</contexte>
<exemples>none</exemples>
<mission>
By running code, check each line total, the units against the price schedule and the grand total.
</mission>
<rendu>
The discrepancies with their line, the recalculated total, the code. No opinion on prices.
</rendu>
Roughly what you should get
One discrepancy, line 3: 340 × 22.00 = €7,480.00 excl. VAT, not €7,840.00. Units match. Recalculated total: €50,130.00 excl. VAT.
Check: 26,270 + 15,180 + 7,480 + 1,200 = €50,130 excl. VAT. The displayed total of €50,490 carried over the transposed digits on line 3 (a €360 difference). An inconsistency like this can force the buyer to request a correction, or to reject the bid, depending on the consultation rules.
Level 3 · demanding case40 min
Put together an engineering consultancy’s full response
A 6-person thermal engineering consultancy in Pau is bidding for a project management (maîtrise d’œuvre) contract to renovate an inter-municipal sports hall. Write the project instructions, the extraction request, the deep research request on the buyer, and the compliance matrix request. State what you leave out of the project.
The material to work on
BUYER’S DOCUMENTS
- Consultation rules (18 pages): submission on 15 January 2027 at 12pm, questions until 5 January, criteria technical merit 60%, price 40%
- Project brief (42 pages)
- CCAP (administrative terms, 24 pages), acte d’engagement (form of tender), response template in Word format (6 sections)
ENGINEERING CONSULTANCY’S DOCUMENTS
- Four references for sports facility renovations, with client certificates
- CVs of the three engineers
- Professional qualification being renewed, certificate expected at the end of December
- Internal grid of hourly rates and margins
- Technical proposal from a contract won in 2025
Check your work
The instructions require document and page, [TO BE SUPPLIED] and no prices
The qualification being renewed is treated as [TO BE SUPPLIED], not as already held
The rates and margins grid stays out of the project
The deep research distinguishes the buyer’s documents from press coverage
The compliance matrix covers the specification and the response template
See the answers
The project instruction
<documents>
In the knowledge base: tender rules, brief, CCAP, acte d'engagement (form of tender), response template; our four references and their certificates, the three CVs, the 2025 technical proposal.
</documents>
<contexte>
Thermal engineering consultancy in Pau with 6 employees. Project management assignment, renovation of an inter-municipal sports hall. Submission on 15 January 2027 at 12pm. Our professional qualification is being renewed: the certificate is expected at the end of December.
</contexte>
<exemples>The 2025 technical proposal, for the tone.</exemples>
<mission>
You help me prepare the response within the buyer's response template.
</mission>
<rendu>
Cite the document and page. [TO BE PROVIDED] for any information missing from our documents, including the qualification certificate. No prices, no hourly rates. Clear administrative French.
</rendu>
Roughly what you should get
Short instructions that every conversation in the project follows.
The compliance matrix
<mission>
Take the requirements of the tender rules and the brief (file exigences.md in the knowledge base) and the attached final technical proposal. For each requirement, give the section and page of the proposal that addresses it, or “no response”.
</mission>
<rendu>
A sorted table with the “no response” items at the top, then the list of documents to submit, ticked as present or missing from the submission file.
</rendu>
Roughly what you should get
A table of around sixty requirements, two or three “no response” items to deal with, and the list of documents with the qualification certificate flagged as missing until it arrives.
The hourly rates and margins grid stays out of the project: it isn’t needed for the technical proposal, and a shared project would expose it. The manager builds the price separately. If the qualification certificate doesn’t arrive before 15 January, the consultation rules state what is accepted instead: ask the buyer before 5 January.
All the task briefs and copy-ready requests from the course, including answers, worked examples and practice exercises, sorted by module and lesson, with filters to find the right one.
For each lesson, the main exercise and the three graded practice exercises with their materials, to do on paper or alongside Claude; all the answers are grouped at the end.
The course’s practical examples, job by job: the situation, the requests as they were written, the standard replies obtained and what was checked before using them.
All the lessons in a single PDF: objectives, written course with its diagrams, tables and requests, common mistakes, exercise and key takeaways. The practice exercises and answers are in the workbook, the examples in the collection.
Your notes stay on this device; they are not sent anywhere.
A question for the tutor
A result that doesn’t match the model answer, a prompt that gets you nowhere, a case specific to your business: write to us with your prompt and the response you got. A Bonbay Académie trainer replies within 24 working hours, on your case.