A lesson is completed when you tick it, when you watch its video to the end or when you score 80% on its quiz. The certificate is issued online after the final assessment, from a score of 32 out of 40.
Lesson 44, module 11: Other trades Construction and field trades: quotes, site reports, photos and phone A site meeting, four work packages, twenty photos. When does the report go out?
On site, your phone is enough. Dictation replaces the keyboard Photos are added with the + button The project keeps the site context Dictate on site, structure, review, send. [Diagram: From the site to the report sent] 1. Dictate on site 2. Structure 3. Fill in 4. Review 5. Send Dictation happens on site, formatting at the office or in the van, and the review is always yours. Raw dictation becomes a report by work package. Prompt: Here are my dictated notes from this morning's site meeting. Sort them by work package in the project template, with who does what by when. List separately anything missing. Response: A report in four work packages, an action table with owner and deadline, and three gaps: the plasterer's return date, the threshold dimension, the name of the inspection body. A photo can be described. It can't be measured. [Diagram: What a photo lets you say] What Claude can do What it can't claim Claude describes what it sees; it doesn't measure, it doesn't diagnose, it doesn't know where the photo was taken. The quote: your quantities, your prices, its formulas. A take-off and a price list attached An Excel file with visible formulas Total recalculated on two lines A private client's name has no place in the conversation. [Diagram: Traffic lights for site data] Green: Any plan Amber: Team, Enterprise, or paid individual account Red: Team or Enterprise, with a policy A site photo often shows more than the defect: faces, a number plate, a name on a letterbox. In the exercise, you write the report for a renovation in Pessac.
Your turn: The report for a house renovation in Pessac The written lesson, the worked exercise and the quiz are below the video.
Lesson 44 of 50 · module 11, other roles
Construction and field trades: quotes, site reports, photos and phone
On a building site, you run Claude from your phone: you dictate your inspection notes and add the photos, and it returns structured minutes and a list of what is missing. In the office, it turns a quantity take-off into an Excel quote with formulas, using your prices. It describes a photo; it does not measure or diagnose.
25 min of reading
1 min 55 of video
7 diagrams
3 demandes to copy
3 exemples pratiques
4 exercices answerss
5 questions
1 ressource
By the end of this lesson, you will know how to
Dictate site visit notes and get a site meeting report ready to review
Turn a quantity take-off and a price list into an Excel quote with visible formulas
Use site photos without making Claude claim what it cannot see
What’s covered
Your phone as a site tool
The site meeting report
Photos, without reading too much into them
From take-off to quote
3 worked examples, followed from start to finish
Exercise with answers · The report for a house renovation in Pessac
3 practice exercises, from guided to demanding cases
The quiz
Key points
On site, dictate one trade package at a time and add the photos with the + button: the formatting comes afterwards.
One project per site, with the minutes template and the list of contractors, saves you explaining everything again.
Claude describes a photo; it does not measure, date or diagnose.
In a quote, the quantities and prices come from you; Claude calculates with visible formulas that you redo on two lines.
Relative dates, private clients’ names and the VAT rate are never left to Claude’s discretion.
In a building firm, the time lost is not on site: it is in the evening, in the office, tidying up scribbled notes, captioning photos and pricing the extra work requested in meetings. A site manager running six sites can easily spend an hour a day on it. Claude takes on a good share of this work, provided you give it the material on site and keep for yourself what commits you: quantities, prices, snags and the signature.
Your phone as a site tool
In the Claude app on your phone, there are two ways to speak. Dictation turns your voice into text in the input field: you read it through, then send it. Voice mode, in beta on all plans, is a conversation in which Claude answers out loud; by default it listens continuously, and a “push to talk” mode is safer amid the noise of a building site. Voice exchanges count towards your usage limits in the same way as written messages. For site minutes, use dictation: you keep the text in front of you before sending it.
Dictate notes and add photos on your phone
Open the Claude app, go into the site project, then start a new conversation.
Tap the microphone in the input field to dictate; the sound-wave icon right next to it starts voice mode.
Dictate trade package by trade package, naming each one as you go (“Plastering package: …”): the structure then takes care of itself.
Tap the + button in the input field, then the option to add files or photos, and choose the photos from the inspection.
Read through the dictated text, correct any proper names and figures that were transcribed wrongly, then send.
The label may vary slightly depending on the version. Accepted photo formats are JPEG, PNG, GIF and WebP, up to 8,000 × 8,000 pixels, with no more than twenty files per conversation. The voice mode language setting is in the settings, under capabilities, in the voice section: French is in beta there.
A day in the life of a site manager
7 h 30Before leaving
The site’s open points reviewed from the project.
10 hSite meeting
Notes dictated trade package by trade package, photos added during the visit.
12 h 30In the van
The structured report, and the list of gaps.
17 hAt the office
The quote for additional works and sending the report.
Claude comes in at four points, always from the phone or tablet.
The site meeting report
Create one project per major site, or a “Site reports” project for small ones. In its knowledge: the company’s report template, the list of contractors by trade package, the schedule. In its instructions: the brief below. Each meeting then becomes a five-minute dictation and a ten-minute check.
The site project instructions
<documents>
In the project knowledge: “modele-compte-rendu.docx”, “intervenants-par-lot.xlsx”, “planning-chantier.pdf”.
</documents>
<contexte>
General building contractor, [headcount] employees, [town]. I am the site manager on the [short site name, no private individual’s name] site. The report goes out after each meeting to the trade contractors, the client and the architect. It is binding in the event of a dispute: a wrong date or snag commits us.
</contexte>
<exemples>
The attached template shows the expected layout.
</exemples>
<mission>
Using my dictated notes and the photos, write the report of the meeting on [date]: attendees and absentees, progress by trade package, snags, decisions, actions.
</mission>
<rendu>
The template’s structure. An actions table: no., trade package, action, owner (the company, never a person), deadline. Do not invent any dates or quantities: write [TO BE COMPLETED] instead. End with a list of what is missing from my notes. It is finished when every action has an owner and a deadline, or a [TO BE COMPLETED].
</rendu>
Roughly what you should get
A page and a half of minutes following the template’s structure: attendees, progress on each trade package in two or three lines, numbered snags with the matching photo, an action table of around ten lines, and a short list of gaps to fill before sending.
Dictation transcribes company names and figures poorly: the list of contractors in the knowledge base corrects the former, your review the latter.From the site to the report sent
1Dictate on site
Trade package by trade package, walking round, with photos taken at the same time.
2Structure
Claude organises the notes into the site project template.
3Complete
It lists what is missing: a date, a person responsible, a dimension.
4Review
Every snag and every date checked against your notes.
5Send
By you, from your e-mail, to the firms and the client.
Dictation happens on site, formatting at the office or in the van, and the review is always done by you.
Photos, without reading too much into them
Claude is very good at analysing an image: it spots a chip on a tile, reads a window label or a crumpled delivery note, sorts twenty photos by trade package. But it knows neither the scale, nor the place, nor the date the photo was taken. Ask it to describe and caption, never to measure or judge severity. A crack “of 2 mm” written by Claude with no ruler in the photo is an invention. For a diagnosis, go to the engineering consultancy or the expert.
What a photo can tell you
What Claude can do
Describe a visible defect: crack, chip, missing joint
Read a label, a rating plate, a delivery note
Caption and sort twenty photos by trade package
Point out what is missing from the photo to reach a conclusion
What it cannot state
The width of a crack or a dimension with no reference point
The cause of a defect or its structural severity
Where and when the photo was taken
Compliance with a standard or a DTU (French building code of practice)
Claude describes what it sees; it does not measure, it does not diagnose, it does not know where the photo was taken.
Caption the photos from a visit
<documents>
[The photos from the visit, attached in the order they were taken.]
</documents>
<contexte>
Pre-handover inspection of the [short name] site, a residential block of [number] homes. The photos will be appended to the handover report.
</contexte>
<exemples>none</exemples>
<mission>
For each photo, write a factual caption: what is visible, the element concerned (door, joinery, floor, ceiling…), the likely trade package.
</mission>
<rendu>
A table: photo no., one-sentence caption, likely trade package, “to be checked on site” if the photo is inconclusive. No dimensions, no causes, no assessment of severity. Flag any photos in which a person or a number plate is recognisable.
</rendu>
Roughly what you should get
A twenty-line table: “Photo 7, chip about a third of the tile’s width at the foot of the front door, tiling package”; “Photo 12, silicone seal missing at the corner of the shower tray, plumbing package, to be checked on site”. Two photos flagged for showing a recognisable face.
From take-off to quote
The quote for additional works is the most tedious document to produce on the fly. Claude produces it in Excel, with working formulas, if code execution and file creation is enabled. The rule: you provide the quantities and prices, it calculates and formats. A unit price requested from Claude comes out of nowhere; it has neither your purchases, nor your unit labour times, nor your margins.
Splitting the work on a quote
Step
Claude
You
Take-off
Tidies up a dictated list, adds up the areas room by room
Measures, and checks the deductions (openings, service voids)
Unit prices
None: it uses your attached price list
Provides the up-to-date price list, with its date
Calculation
Quantity × price, subtotals by trade package, VAT and total, all as Excel formulas
Redoes two lines and the total by hand
Drafting
Clear descriptions, terms and validity, using your own wording
Checks the applicable VAT rate and the mandatory statements
Sending
Nothing: it prepares the file
Signs and sends
Traffic lights for site data
Any plan
Photos of the works with no people or number plates
Manufacturers’ technical data sheets
Public texts, anonymised CCTP (technical specifications)
Team, Enterprise, or a configured individual account
Your unit prices and your margins
A site’s schedule and take-off
Reports with no private client’s name
Team or Enterprise, with a usage policy
A private client’s name, address and phone number
Photos in which people are recognisable
Accidents, workers’ sick leave
A site photo often shows more than the defect: faces, a number plate, a name on a letterbox.
For a private client, the quote shows their name and address. Prepare the file without them (“Client: [NAME]”) and complete it in Excel: on an individual account, this data is a red light. The lesson “What happens to your conversations: training, retention and incognito chat” sets out the settings to check.
Mistakes to avoid
Asking Claude to “price” work without giving it any prices.
It produces plausible prices that match neither your purchases nor your labour times, and the quote looks credible.
Attach the dated price list and require it to flag any item missing from the list instead of pricing it.
Let through a dimension or cause written by Claude from a photo.
Without a scale reference or a diagnosis, the information is made up, and minutes that serve as the official record will repeat it.
Ask for factual captions, with no dimensions or causes, and have the defects inspected by a professional.
Send the report exactly as Claude drafted it, with the dates it calculated.
“In a fortnight” becomes a specific date that nobody decided, and the contractors stick to it.
Require [TO BE COMPLETED] for any date missing from the notes and fill them in yourself when reviewing.
Attach all the week’s photos without sorting them.
Faces, number plates, children behind a fence go into an external tool for no reason.
Sort them before sending, or ask Claude to flag these photos so you can remove them from the minutes.
3 SME situations followed from start to finish: the prompts exactly as they were written, the model answer to aim for, and what was checked before sending.
Example 1
The weekly report for a housing site
Sandrine is a site manager at a general contractor with 60 employees in Mérignac. She is overseeing the construction of a 24-unit apartment building in Bègles and runs a meeting with nine contractors every Thursday. Writing up the minutes took her an hour and a quarter every Thursday afternoon.
Thursday’s report
1Meeting
Dictated notes, 14 photos.
2Report no. 31
To the structure of the project template.
3Comparison with no. 30
Two orphaned actions found.
4Review
Dates filled in, one error corrected.
5Sending
By Sandrine, to the nine firms.
Request 1
<documents>
My dictated notes from this morning’s meeting, below, and the 14 attached photos.
[notes]
</documents>
<contexte>
This is the Bègles site project: the template, the contractors and the schedule are in the knowledge. Meeting no. 31 on [date].
</contexte>
<exemples>The project template.</exemples>
<mission>
Write report no. 31 and link each photo to an observation.
</mission>
<rendu>
The template’s structure, the actions table, [TO BE COMPLETED] in place of any date missing from my notes, and the list of gaps.
</rendu>
Model answer
Site report no. 31
Present: structural works, external joinery, plumbing, electrical, plastering, project management. Absent: waterproofing, lift, painting.
Progress
Structural works: parapets of building B completed.
External joinery: installation completed on the 2nd floor, 3rd floor in progress.
Plumbing: risers installed, leak tests [DATE TO BE COMPLETED].
Actions
| No. | Trade package | Action | Owner | Deadline |
| 31-1 | Waterproofing | Send the roof works schedule | Waterproofing contractor | [DATE TO BE COMPLETED] |
| 31-2 | Joinery | Replace the scratched glazing in flat B12 (photo 6) | Joinery contractor | Meeting no. 33 |
Gaps: the date of the plumbing tests, the reason for the lift contractor’s absence.
Sandrine fills in the two dates in Word. She also corrects “3rd floor in progress”: the joiners finished on Tuesday.
Request 2
Compare the actions in this report with those in the attached no. 30: which actions from no. 30 are neither closed nor carried over?
Model answer
Two actions from no. 30 do not appear in no. 31:
30-4, plastering, redoing the joint tape in flat A03.
30-7, electrical, supply of the self-inspection sheets.
This morning’s notes say nothing about them being closed: carry them over or close them.
30-4 was closed, so she adds that. 30-7 was not: she carries it over as 31-5.
What was checked before sending
Facts and figures: each [TO BE COMPLETED] date replaced from his notes or the schedule.
Sources: each linked photo opened and compared with its caption.
Tone and audience: those responsible are firms, never a named tradesperson.
Rough estimate: thirty minutes instead of an hour and a quarter, every week, and actions no longer get lost from one report to the next.
Example 2
A plumbing and heating engineer’s quote
Thierry is a self-employed plumbing and heating engineer in Libourne, working with one apprentice. A customer asks him to replace her boiler and four radiators. He has taken the measurements and noted the materials in his notebook, and wants to send the quote that same evening.
The evening quote, before and after
Before
The notebook copied into an old template
Totals calculated by hand
The quote goes out three days later
After
The attached, dated price list
Visible formulas in every cell
The quote goes out the evening of the visit
Request 1
<documents>
<document nom="grille-prix-2026.xlsx">My selling price list excl. VAT, updated on 2 November 2026.</document>
</documents>
<contexte>
Self-employed plumbing and heating engineer in Libourne. Quote for a private customer, house more than two years old. VAT rate checked with my accountant: [rate]%. Quote valid for 30 days.
</contexte>
<exemples>none</exemples>
<mission>
Create an Excel quote from these quantities: removal of the old boiler (1), condensing boiler reference [ref.] (1), 1,200 W steel radiators (4), thermostatic valves (4), labour (14 hours), commissioning (1). Take the prices from my price list.
</mission>
<rendu>
An Excel file: one line per item, columns description, quantity, unit price excl. VAT, total excl. VAT as a formula. Subtotal excl. VAT, VAT, total incl. VAT as formulas. Client: [NAME] and [ADDRESS] left as placeholders. Flag any item missing from the price list instead of pricing it.
</rendu>
Model answer
The file devis-chaudiere.xlsx: six lines, each total a formula (quantity × unit price), a subtotal excl. VAT, VAT at the rate given and the total incl. VAT, all as formulas. One flag: “Commissioning is not in the price list: price to be completed in cell D9.”
Thierry adds his commissioning flat fee, which the price list had left out, and the exact model reference of the boiler.
Request 2
Below the table, add the wording from my attached quote template, and a line “Option: system power flush” priced separately, not included in the total.
Model answer
The completed quote: the wording from his template reproduced word for word (validity, payment terms, ten-year liability insurance to be completed with the policy number), and the option on a separate line, below the total, with its own price excl. VAT and incl. VAT.
He rechecks the total of two lines on a calculator, fills in the client’s name and address in Excel and sends the PDF.
What was checked before sending
Calculations: two lines and the total incl. VAT rechecked on a calculator.
Facts and figures: the VAT rate checked with the accountant before the request, not after.
Data: the client’s name and address added in Excel, never sent to Claude.
Rough estimate: a quote sent in twenty minutes the same evening, instead of an hour on Saturday morning.
Example 3
The snags from an office handover
Olivier is a project manager at a 25-employee finishing-trades firm in Toulouse. He is handing over the fit-out of an 800 m² open-plan office floor and comes back from the visit with 42 photos and a list of snags dictated room by room.
From inspection to clearing the snags
JSite visit
42 photos, snags dictated room by room.
JList
31 snags, then 32 with photo 22.
J+1Sending by trade package
One tab per contractor.
J+30Cleared
The summary counter tracks the snags cleared.
Request 1
<documents>
[My dictated notes and the 42 photos.]
</documents>
<contexte>
Handover inspection of an 800 m² open-plan office floor, trade packages partitions, suspended ceilings, painting, resilient flooring. The snagging list will be appended to the handover report signed by the client.
</contexte>
<exemples>none</exemples>
<mission>
Draw up the snagging list from my notes, and link each snag to the corresponding photo or photos.
</mission>
<rendu>
A table: no., room, trade package, snag in one factual sentence, photos. No assessment of severity, no causes. At the end, the photos that match no snag, and the snags without a photo.
</rendu>
Model answer
| No. | Room | Trade package | Snag | Photos |
| 1 | Meeting room 2 | Painting | Roller mark on the wall on the window side | 3, 4 |
| 2 | North open-plan area | Suspended ceilings | Stained tile directly below the supply air diffuser | 9 |
| 3 | Men’s toilets | Resilient flooring | Skirting upstand coming away over about one metre | 15 |
| … | … | … | … | … |
31 snags. Photos without a snag: 22, 37. Snags without a photo: 12, 28.
Photo 22 shows a snag missed in the dictation (missing door handle). He adds it as no. 32.
Request 2
Group the snags by trade package in an Excel table, with an empty “date cleared” column, so you can send it to each contractor.
Model answer
The file reserves-reception.xlsx: one tab per trade package (partitions 7, suspended ceilings 9, painting 11, resilient flooring 5), with columns for no., room, snag, photos and an empty clearance date, plus a summary tab that counts the snags cleared per package using a formula.
He checks that the summary total really is 32 before sending the tabs.
What was checked before sending
Sources: photos with no snag and snags with no photo dealt with one by one.
Calculations: the summary total equals the number of snags.
Tone and audience: factual snags, with no severity or cause, acceptable to the client and the firms.
Rough estimate: an hour instead of half a day for the list and sorting the photos.
You are Karim, site manager at a renovation firm with 14 employees in Pessac. This morning you held a site meeting on the full renovation of a 1965 house. Here are the notes you dictated in the van, as your phone transcribed them: “Demolition package finished. Plumbing package Sanitaires du Sud, pipework installed upstairs, ground floor still to do, they say end of next week. Electrical package Élec 33 absent, panel not installed, chase them. Plastering package start planned for the 24th but waiting on electrics. Client wants to add a roof window in bedroom two, prepare a quote. Crack on north façade above the living-room window, photo 4, get it looked at. Next meeting Tuesday week.” Write the request, then anticipate what you will need to correct.
Spot anything in the notes that is vague or missing (dates, who is responsible, quantities).
Write the brief for the site report, including the [TO BE COMPLETED] rule.
Prepare the sentence that stops Claude from describing the crack.
List your checks before sending.
See the answers
“End of next week”: a real date to write in (the Friday in question).
“Follow up”: who follows up with Élec 33, and by when?
“On the 24th”: the month, and the condition (electrical panel installed).
The roof window: an action (quote by the firm) with a deadline, not a decision.
“Tuesday week”: the exact date of the next meeting.
The mission brief
<documents>
My dictated notes below, and photo 4 attached.
[notes]
</documents>
<contexte>
Renovation company with 14 employees in Pessac. Full renovation of a 1965 house, site meeting on [date]. The report goes to the trade contractors and the client; it is binding.
</contexte>
<exemples>The project’s report template.</exemples>
<mission>
Write the report: progress by trade package, observations, client requests, actions.
</mission>
<rendu>
An actions table: trade package, action, owner (a company), deadline. Replace any relative date with [DATE TO BE COMPLETED]. For the crack, write only what is visible in the photo and “ask a professional for an opinion”: no dimensions, no cause, no severity. End with the list of gaps.
</rendu>
Roughly what you should get
Minutes covering four trade packages, Élec 33’s absence noted, the plastering made conditional on the electrical panel, the roof window request logged as a “quote to prepare” action, the crack described in one sentence, and five gaps listed.
Before sending: every date replaced with a real date, every action owned by a company, the crack left unqualified, and the client’s name absent from the text sent to Claude. Checking takes ten minutes; tidying up by hand used to take forty.
Practise
Three more exercises, from the most guided to the most demanding. The material is provided in full: copy it into your tool, then check your work against the criteria before opening the answers.
Level 1 · guided10 min
Tidy up a site dictation
Here is a dictation transcribed by the phone of a team leader at a roofing firm with 9 employees in Dax. Identify the likely transcription errors and the gaps, then write the brief that produces the minutes.
The material to work on
site rue des pins roofing package. removal of tiles on the north slope, three rotten rafters, new ones needed, check with the client. the battens need replacing across the whole slope. the zinc gutter is holed over two metres. rain forecast tomorrow, tarpaulin fitted. resume thursday if the timber is delivered. the client wants a quote for roof windows vélux deux.
Check your work
The gaps are identified: which Thursday, who orders the timber, the quote by whom and by when
“vélux deux” is flagged as a transcription to check (two roof windows?)
The brief requires [TO BE COMPLETED] in place of relative dates
The request for extra rafters is presented as a decision to be obtained from the client, not as already agreed
See the answers
The mission brief
<documents>
[The dictation.]
</documents>
<contexte>
Roofing company with 9 employees in Dax. End-of-day report for the client and the office.
</contexte>
<exemples>none</exemples>
<mission>
Turn this dictation into a clean report: work done, findings, decisions needed from the client, next steps.
</mission>
<rendu>
Four short sections. Replace “tomorrow” and “Thursday” with [DATE TO BE COMPLETED]. Flag any words that look like a transcription error. End with three questions to ask the client.
</rendu>
Roughly what you should get
Fifteen lines of minutes: north roof slope stripped, three damaged rafters, battens to be replaced, gutter holed over two metres, tarpaulin fitted; one decision to obtain (replacing the rafters); “vélux deux” flagged; three questions for the client.
The dictation does not say who orders the timber or who prepares the quote for the roof windows: you resolve these two gaps, flagged by Claude, before sending, not the report through guesswork.
Level 2 · independent20 min
Pricing a quote from measurements
A painting firm with 6 employees in Angoulême needs to price the repainting of a flat. Write the brief that produces the Excel quote, then work out the total excl. VAT yourself: that is your check.
The material to work on
TAKE-OFF (measured on site)
Living room: walls 42 m², ceiling 28 m²
Bedroom 1: walls 31 m², ceiling 12 m²
Bedroom 2: walls 29 m², ceiling 11 m²
Hallway: walls 18 m², ceiling 6 m²
PRICE LIST EXCL. VAT (as at 1 November 2026)
Preparation and painting of walls, two coats: €24 per m²
Preparation and painting of ceilings, two coats: €27 per m²
Protection and end-of-job cleaning: flat rate €180
VAT: rate provided by the accountant, [rate] %
Check your work
The request gives the quantities and the price list, without letting Claude choose a price
The totals are requested as Excel formulas
Your total for the walls is 120 m², and for the ceilings 57 m²
Your total excl. VAT is €4,599
The client’s name is replaced with [NAME]
See the answers
The mission brief
<documents>
[The measurements and the price list above.]
</documents>
<contexte>
Painting company with 6 employees in Angoulême. Quote for repainting an occupied flat. VAT at [rate]%, checked by our accountant.
</contexte>
<exemples>none</exemples>
<mission>
Create the Excel quote: one line per room and per surface (walls, ceilings), then the fixed fee.
</mission>
<rendu>
Columns: room, surface, area, unit price excl. VAT, total excl. VAT. All totals as formulas. Walls subtotal, ceilings subtotal, fixed fee, total excl. VAT, VAT, total incl. VAT. Client: [NAME]. No prices outside the price list.
</rendu>
Roughly what you should get
A file with nine detail lines, two subtotals, the flat fee, the total excl. VAT of €4,599 and VAT at the given rate, all as formulas.
The calculation to find
Item
Quantity
Price excl. VAT
Total excl. VAT
Walls
120 m²
24 €
2 880 €
Ceilings
57 m²
27 €
1 539 €
Protection and cleaning
1
180 €
180 €
Total excl. VAT
4 599 €
Level 3 · demanding case35 min
Set up the project for a six-month site
A masonry firm with 30 employees in Bayonne is starting work on a nursery school extension: six months of works, with a site meeting every Tuesday. Design the Claude project for the site: what goes into the knowledge, the project instructions, the rule for photos, and the request to run after each meeting. Also say what must never go into the project.
The material to work on
AVAILABLE DOCUMENTS
- CCTP (technical specification) for the structural works package (PDF, 86 pages)
- General schedule (PDF, 2 pages)
- List of firms and their contacts, with mobile numbers (Excel)
- The firm’s report template (Word)
- Progress photos (around 30 a week), in which children from the school are sometimes visible through the fence
- The firm’s price list (Excel)
- Site layout plan (PDF)
Check your work
The knowledge kept is the CCTP, the schedule, the template and the site layout plan
The list of contacts goes in without the mobile numbers
The photo rule excludes any photo in which a child is visible
The price list stays outside the shared site project, or goes in only on Team with restricted access
The instructions require [TO BE COMPLETED] and make firms, not individuals, responsible
See the answers
What goes in, what stays out
Document
Decision
Why
Technical specifications (CCTP), schedule, template, site layout plan
In the knowledge
They are used at every meeting
List of firms
In the knowledge, without phone numbers
Company names are enough to assign the actions
Photos in which children are visible
Never
Data showing recognisable minors: red light, no discussion
Price list
Outside the site project
It is used for quotes, not reports, and is none of the other firms’ business
The request after each meeting
<documents>
My dictated notes from meeting no. [n] and the week’s photos, sorted: no photo in which a person is recognisable.
</documents>
<contexte>
Nursery school extension site, see the project knowledge. Meeting on [date].
</contexte>
<exemples>The project’s report template.</exemples>
<mission>
Write report no. [n], compare its actions with those of the attached previous report and flag any that are neither closed nor carried over.
</mission>
<rendu>
The template’s structure, an actions table with a company as owner, [TO BE COMPLETED] for any date missing from my notes, the list of gaps.
</rendu>
Roughly what you should get
Minutes following the template’s structure, an action table, the list of unassigned actions from the previous minutes and the list of gaps.
The 86-page CCTP (technical specification) fits in the project (30 MB per file); if the knowledge base grows with the reports, Claude switches to document search automatically on paid plans. Archive reports older than two months to keep answers precise.
All the task briefs and copy-ready requests from the course, including answers, worked examples and practice exercises, sorted by module and lesson, with filters to find the right one.
For each lesson, the main exercise and the three graded practice exercises with their materials, to do on paper or alongside Claude; all the answers are grouped at the end.
The course’s practical examples, job by job: the situation, the requests as they were written, the standard replies obtained and what was checked before using them.
All the lessons in a single PDF: objectives, written course with its diagrams, tables and requests, common mistakes, exercise and key takeaways. The practice exercises and answers are in the workbook, the examples in the collection.
Your notes stay on this device; they are not sent anywhere.
A question for the tutor
A result that doesn’t match the model answer, a prompt that gets you nowhere, a case specific to your business: write to us with your prompt and the response you got. A Bonbay Académie trainer replies within 24 working hours, on your case.