The need first, the offers second. [Diagram: Comparing three offers in five steps] 1. Write down the need 2. Extract 3. Convert to the same unit 4. Score 5. Decide The second step, converting the offers to the same unit, is the one that hand-made tables forget. The price per metre isn't enough: you need the full cost. Carriage and free delivery thresholds Minimum pack sizes How long the offer is valid Ask for the comparison line by line. Prompt: From each attached offer, extract: unit price, unit, pack size, carriage, lead time, validity, payment. Convert everything to the full cost of 1,200 m. Flag anything missing. Response: A three-column table, one row per criterion, the full cost of each offer as a formula, and two gaps: the lead time from supplier B, the validity period of offer C. Every Monday, the week's deliveries are matched against the orders. [Diagram: Weekly delivery tracking] 1. Read 2. Match 3. Flag 4. Chase Claude reads and prepares; chasers go out once you approve. Not every delivery deserves a phone call. [Diagram: Which deliveries to watch closely] Vertically, supplier reliability; horizontally, the impact of a delay. Monitor Let it run Confirm Priority: Call Automatic tracking applies to all of them; calling the supplier, to the top-right box. The Gmail connector doesn't read the contents of attachments. It sees their name and size The message body is read PDFs are attached by hand In the exercise, you compare three offers of cable for an electrician in Cenon. Your turn: Three cable offers for an electrician in Cenon The written lesson, the worked exercise and the quiz are below the video.
Lesson 45 of 50 · module 11, other roles
Purchasing and logistics: compare supplier offers and track deliveries
Claude compares supplier offers that don't look alike: it extracts prices, units, carriage, lead times and terms, brings everything back to full cost and calculates a weighted scoring grid in formulas. Connected to the purchasing inbox, it matches shipping notices against open orders every Monday and prepares the chasers, which you send.
24 min of reading
1 min 55 of video
7 diagrams
4 demandes to copy
3 exemples pratiques
4 exercices answerss
5 questions
1 ressource
By the end of this lesson, you will know how to
Write down the need and the scoring grid before having the offers read
Get a comparison table based on full cost, with calculations you can check
Set up weekly delivery tracking that prepares chasers without sending them on its own
What’s covered
The need before the offers
Decide and negotiate
Track deliveries every week
3 worked examples, followed from start to finish
Exercise with answers · Three cable offers for an electrician in Cenon
3 practice exercises, from guided to demanding cases
The quiz
Key points
Write down the need and the criteria weights before reading the offers.
Compare full costs: quantity actually bought, carriage, carriage-paid threshold, and only discounts that are certain.
Require the page for each piece of information and “not in the offer” for anything missing.
Delivery tracking is done three times by hand, then connected and scheduled, with chasers kept as drafts.
The Gmail connector doesn't read the content of attachments: attach the PDFs that matter.
An SME buyer rarely compares like with like. One supplier prices by the metre, another by the 500 m drum; one delivers free above €800 excl. VAT, another charges carriage; one holds its prices for 30 days, another for 15. A spreadsheet built by hand often compares the listed prices, not what the business will actually pay. Claude does the extraction and the calculation in ten minutes. The choice, the negotiation and the order remain yours.
The need before the offers
Write down the need before opening the quotes: the quantity, the delivery place and date, and the criteria with their weights (for example price 50%, lead time 30%, payment terms 20%). If you read the offers first, you will pick criteria that favour the one you like. This discipline matters all the more in public procurement, where the criteria are set in advance.
Compare three offers in five steps
1Write down the need
Quantities, lead time, delivery location, criteria and their weighting, before reading the offers.
2Extract
Each offer in rows: price, unit, carriage, lead time, validity, payment.
3Convert to the unit
Same unit, same free-delivery terms, same quantity: the full cost.
4Record
The weighted grid calculated in formulas, not in its head.
5Decide
By you, with the questions to ask the suppliers.
The second step, bringing the offers to the same unit, is the one that hand-made tables forget.
Compare offers on full cost
<documents>
<document nom="offre-A.pdf">[supplier A’s offer]</document>
<document nom="offre-B.pdf">[supplier B’s offer]</document>
<document nom="offre-C.pdf">[supplier C’s offer]</document>
</documents>
<contexte>
[Sector], [headcount] employees, [town]. Requirement: [quantity and unit] of [product], delivered to [location] before [date]. Criteria and weightings: full price [x]%, lead time [y]%, payment terms [z]%. We usually pay at [term] days.
</contexte>
<exemples>none</exemples>
<mission>
Extract from each offer: unit price excl. VAT, unit, minimum pack size, carriage costs and free-delivery threshold, stated lead time, validity period, payment terms, discounts. Then calculate the full cost of my requirement for each offer, and the weighted score.
</mission>
<rendu>
A table: one row per criterion, one column per supplier, with the page number where each piece of information appears. Then the full cost in euros excl. VAT and the weighted score, calculated by running code or in an Excel file with formulas. Write “not in the offer” for any missing information: do not assume any. Finish with the questions to ask each supplier.
</rendu>
Roughly what you should get
A table of about ten rows and three columns, each cell followed by its page (“p. 2”), two or three “not in the offer” entries, the full cost of each offer with the calculation shown, a score out of 10 per criterion and the weighted score, then three to five questions per supplier.
Asking for the page of each piece of information is the source check: a payment term you can't find in the PDF doesn't exist.
The traps that skew a comparison
Trap
What happens
The instruction to give
Different units
Price per metre versus price per drum, per kilo versus per piece
Convert everything to the unit I need and show the conversion
Fixed pack size
You have to buy 1,500 m to use 1,200
Calculate on the quantity actually bought
Carriage and free delivery
A cheaper offer charges for transport
Add carriage unless the carriage-paid threshold is reached
Validity
An offer expires before you decide
Give the expiry date of each offer
Conditional discount
A discount tied to an annual volume you won't reach
Separate guaranteed discounts from conditional ones
Decide and negotiate
Claude knows nothing about your suppliers' actual quality, their reliability on your recent orders or your relationships with them. Add what you know to the context (“B delivered late twice this year”), or keep that criterion to yourself. On the other hand, it is very useful for preparing a negotiation: it spots the differences, frames the questions and drafts a firm, polite e-mail. The e-mail goes from your own mailbox, after you have reviewed it.
Prepare the negotiation
<contexte>
Based on the comparison table above. I prefer supplier [B] for its reliability, but its full cost exceeds [A]’s by €[difference] excl. VAT. I do not want to reveal the competitor’s name or exact price.
</contexte>
<exemples>none</exemples>
<mission>
Write the email to [B] asking for a concession on price or carriage, and written confirmation of the lead time.
</mission>
<rendu>
Ten lines at most, formal address, a friendly and direct tone, a single figure-based request (“a match of €[x] excl. VAT on the total”), and an expected reply date. No information about the competitor beyond “a more competitive offer”.
</rendu>
Roughly what you should get
An email of eight to ten lines: a reminder of the request and the offer date, the difference presented as “a better-placed offer of €[x] excl. VAT”, a request to match it or offer free delivery, written confirmation of the lead time, and a reply-by date.
Track deliveries every week
Delivery tracking is the textbook example of a task that climbs the delegation ladder. Do it by hand for three weeks: you attach the open orders spreadsheet and paste in the dispatch notices. Once the result is reliable three times in a row, connect the purchasing mailbox (Gmail or Outlook) through a connector, then schedule the task for every Monday. Two limits to know about: the Gmail connector sees the name and size of attachments, not their content; the Microsoft 365 connector cannot attach any file to an outgoing message. So an order acknowledgement in PDF has to be attached by hand.
Weekly delivery tracking
1Read
The week's dispatch notices and confirmations in the purchasing mailbox.
2Reconcile
With the table of open orders.
3Flag
Delays, missing dates, partial quantities.
4Chase
Drafts prepared, sent by you.
Claude reads and prepares; chasers go out once you approve them.
Schedule the Monday update in Cowork
In Claude Desktop or on the web, switch to Cowork mode, then open the scheduled tasks page in the sidebar (Scheduled).
Click the new task button at the top right, then choose to create it with Claude.
Describe the task and how often it runs (“every Monday at 8am”) and answer Claude's questions.
Review the proposed name, frequency and instructions, then confirm the schedule.
In the new experience, with no choice between Chat and Cowork, describe the task and how often it runs in a conversation: Claude offers to schedule it.
The label may vary slightly depending on the version. Scheduled tasks are available on paid plans; they run in the cloud even when your computer is asleep, unless they touch files or applications on your machine. The lesson “Scheduled tasks and Dispatch: a status update every Monday without asking again” covers the settings in detail.
Instructions for the Monday task
<documents>
The file “commandes-ouvertes.xlsx” in the Purchasing folder on Google Drive: order number, supplier, item, quantity, promised date.
</documents>
<contexte>
Purchasing department of [company described by sector and size]. Suppliers send confirmations and shipping notices to the purchasing inbox. A late delivery holds up a building site or a production line: we need to know on Monday, not Thursday.
</contexte>
<exemples>none</exemples>
<mission>
Every Monday, read the messages in the purchasing inbox from the last seven days, match them against the open orders and prepare the chasers.
</mission>
<rendu>
A table: order, supplier, promised date, latest information received (with the date of the message), status (on time, late, no news, partial delivery). Then a draft chaser for each order that is late or has had no news for more than five days. Send nothing: the drafts wait for my approval. The job is done when every open order has a status.
</rendu>
Roughly what you should get
Every Monday morning: a table of about twenty orders, three or four late or with no news, each with a five-line draft chaser, and nothing sent.
By default, Gmail asks for your approval before each send. Keep this setting: a badly judged chaser to a strategic supplier costs more than it gains.Which deliveries to watch closely
incertaineSupplier reliabilityfiable
Monitor
The Monday update is enough, with an alert two days before.
Call
Written confirmation of the date, a chaser five days before, a plan B ready.
Let it ride
The Monday update, with no chasing.
Confirm
An acknowledgement required with the order.
faibleConsequence of a delayforte
Automatic tracking applies to all of them; calling the supplier, to the top-right box.
Traffic lights for purchasing data
Any plan
Technical data sheets and public catalogues
A requirement described without prices
Team, Enterprise, or a configured individual account
The offers received and your purchase prices
Your volumes and your discounts
The orders spreadsheet
Team or Enterprise, with a usage policy
A sales rep's personal laptop
Named assessments of your buyers
Negotiated prices and terms are internal information: configure your account before attaching them.
Mistakes to avoid
Comparing the displayed unit prices without bringing them to the same unit and the quantity actually bought.
A 500 m drum or a pack of 50 changes the quantity you pay for, and the cheapest on paper no longer is.
Ask for the full cost: quantity bought, pack size, carriage, carriage-paid threshold.
Letting Claude fill in information missing from an offer.
It assumes a “usual” lead time or carriage-paid threshold, and the table looks complete.
Require the page for each piece of information and “not in the offer” for anything missing, then put the question to the supplier.
Relying on the Gmail connector to read PDF acknowledgements of receipt.
The connector sees attachment metadata, not their content: the date stays invisible.
Attach the PDFs that matter, or ask suppliers to write the date in the message.
Schedule chasers that go out on their own from the first week.
A matching error sends an unjustified chaser to a supplier who has delivered, and the relationship suffers.
Three reliable weeks by hand, then a scheduled task that prepares drafts approved by a person.
3 SME situations followed from start to finish: the prompts exactly as they were written, the model answer to aim for, and what was checked before sending.
Example 1
A cannery's packaging tender
Marion is a buyer at an 85-employee cannery near Agen. She is renewing the cardboard box contract for 2027: four suppliers have replied with volume-tiered price lists, and different lead times and terms. The managing director wants a recommendation by Friday.
From four offers to a decision
1Four offers
Different tiers, lead times and stock levels.
2Annual cost
Tiers applied to 2026 volumes.
3Discount removed
F2 recalculated without conditions.
4One-page note
F3 recommended, trial proposed.
Request 1
<documents>
[The four offers, each in its own tag, and “volumes-2026.xlsx”: monthly consumption per carton reference.]
</documents>
<contexte>
Cannery with 85 employees, Lot-et-Garonne. Annual carton contract for 2027. Criteria: annual cost 50%, restocking lead time 30%, safety stock held by the supplier 20%. A carton shortage stops the packing line.
</contexte>
<exemples>none</exemples>
<mission>
Calculate the annual cost of each offer by applying its price tiers to our 2026 volumes, then the weighted score.
</mission>
<rendu>
An Excel file with formulas: one tab per supplier and a summary tab. For each condition, the page of the offer. “Not in the offer” for anything missing.
</rendu>
Model answer
The file comparatif-cartons-2027.xlsx. Summary:
| Supplier | Annual cost excl. VAT | Lead time | Safety stock | Weighted score |
| F1 | €412,300 | 10 days | 3 weeks | 7.6 |
| F2 | €398,900 | 15 days | not in the offer | 6.1 |
| F3 | €405,700 | 7 days | 4 weeks | 8.4 |
| F4 | €431,200 | 5 days | 2 weeks | 6.9 |
F2 applies a volume tier that assumes 12% more cartons than in 2026.
Marion checks F2's tier in the offer: it's correct, the discount is conditional. She takes it out of the calculation.
Request 2
Recalculate F2 without the conditional discount, then write the one-page note to the managing director: recommendation, cost difference, risks, open questions.
Model answer
F2 without the conditional discount: €418,600 excl. VAT, weighted score 5.4.
Note to the director
Recommendation: F3, €405,700 excl. VAT per year, restocking in 7 days, four weeks of safety stock.
Difference: €6,600 excl. VAT less than F1, the current supplier.
Risk: F3 is a new supplier; a trial on two product lines in December is proposed.
Outstanding: F3's cardboard price review clause (page 4) is indexed to an index that needs confirming.
The director approves the December trial and asks for the review clause in plain language.
What was checked before sending
Calculations: F3's annual cost recalculated in Excel on two product references.
Sources: F2's conditional discount found on its page, then removed from the calculation.
Facts and figures: 2026 volumes compared with the export from the production software.
Rough order of magnitude: half a day instead of two days for the comparison and the note.
Example 2
Delivery tracking at a building materials merchant
Julien is logistics manager at a building materials merchant with 18 employees in Mérignac. Around forty supplier orders are open at any one time. Delays were discovered when the customer came to collect their goods at the trade counter.
Three weeks, then scheduling
Week 1Manual
Messages copied, spreadsheet attached.
Weeks 2 and 3Reliable results
Three Mondays with no status errors.
Week 4Connector
The purchasing inbox connected.
Week 5Programming
Every Monday at 7.30am, chasers in draft.
Request 1
<documents>
“commandes-ouvertes.xlsx” attached, plus the week’s 23 notices and confirmations, copied from the purchasing inbox.
</documents>
<contexte>
Building materials merchant, Mérignac. An order is late if the promised date has passed or if the dispatch notice gives a later date.
</contexte>
<exemples>none</exemples>
<mission>
Match the messages to the open orders and give the status of each order.
</mission>
<rendu>
A table sorted by status, with the date of the source message. Orders with no message for more than five days listed separately.
</rendu>
Model answer
41 open orders.
Late (3): CF-2611 roof tiles, promised 12/11, shipping notice of 13/11 announcing 19/11; CF-2618 plasterboard, promised 14/11, not delivered; CF-2622 concrete blocks, partial delivery (18 pallets out of 24) on 13/11.
No news for more than five days (5): CF-2603, CF-2607, CF-2615, CF-2620, CF-2624.
On time (33).
Julien phones straight away about the plasterboard: a tradesman customer is expecting it on Thursday.
Request 2
Prepare a draft chaser for each of the five orders with no news: a request for a firm date, five lines, formal tone.
Model answer
Subject: Order CF-2603, confirmation of delivery date
Hello,
We have not received confirmation for our order CF-2603 of [date]. Could you let us know the firm delivery date at the Mérignac depot by midday tomorrow?
Many thanks,
Julien [Surname], Logistics
(Four other drafts on the same template.)
After three reliable weeks, he connects the purchasing inbox and schedules the task for every Monday at 7.30am.
What was checked before sending
Sources: each delay linked to a dated message, opened for checking.
Facts and figures: the number of open orders matches the software (41).
Actions: chasers stay as drafts until she approves them.
Rough order of magnitude: twenty minutes on Monday instead of an hour and a half of checking, and delays known three days earlier.
Example 3
Choosing a carrier for a cosmetics SME
Claire is administrative manager at a natural cosmetics maker with 12 employees in La Rochelle. Parcels to the stockist shops go out with two carriers whose rates depend on weight and zone. She wants to know which costs less on the actual October shipments.
One carrier or two
Before
A single carrier out of habit
Rate cards never compared
After
A weight-based rule, displayed at the workstation
About €330 excl. VAT saved per month
Request 1
<documents>
“grille-transporteur-1.pdf”, “grille-transporteur-2.pdf” and “envois-octobre.csv”: 212 parcels with weight and destination département, without recipient names.
</documents>
<contexte>
Cosmetics manufacturer with 12 employees, La Rochelle. The rate cards have different weight bands. Fuel surcharge: 8% with the first carrier, included with the second.
</contexte>
<exemples>none</exemples>
<mission>
By running code, calculate what each parcel would have cost with each carrier, then the total.
</mission>
<rendu>
The total per carrier, the difference, and the weight bands where each is cheapest. The code at the end. Flag any parcels outside the rate cards.
</rendu>
Model answer
212 parcels read, 2 outside the rate card (over 30 kg).
Total for 210 parcels: carrier 1, €2,486 excl. VAT including surcharge; carrier 2, €2,311 excl. VAT.
Difference: €175 excl. VAT in favour of carrier 2.
Carrier 1 is cheaper up to 2 kg (148 parcels), carrier 2 above that (62 parcels).
[code run]
Claire recalculates three parcels by hand with both rate cards. The results match.
Request 2
Calculate the total if each parcel goes with the cheapest carrier for its weight.
Model answer
Split by weight: €2,153 excl. VAT across the 210 parcels, i.e. €158 excl. VAT less than carrier 2 alone and €333 excl. VAT less than carrier 1 alone.
[code executed]
She keeps both carriers, with a simple rule at the dispatch desk: under 2 kg, carrier 1.
What was checked before sending
Calculations: three parcels recalculated by hand with both rate cards.
Facts and figures: the fuel surcharge checked against carrier 1's latest invoice.
Data: the file sent with no recipient names or addresses.
Rough order of magnitude: about €330 excl. VAT a month on this volume, for one hour's work.
You are Nadia, purchasing assistant at a 22-employee electrical contractor in Cenon. You need 1,200 m of R2V 3G2.5 cable delivered to the depot before 4 December. Criteria: full cost 60%, lead time 25%, payment 15%. The three offers received: A, €0.86 excl. VAT per metre, 500 m drum (so 1,500 m to buy), carriage €45 excl. VAT, free delivery from €1,500 excl. VAT, delivery within 5 working days, payment at 45 days end of month. B, €0.79 excl. VAT per metre, sold by the metre, carriage €120 excl. VAT, no free delivery, lead time not stated, payment at 30 days. C, €0.92 excl. VAT per metre, sold by the metre, free delivery, delivery within 48 hours, payment at 30 days, offer valid until 20 November. Write the request and calculate the full costs yourself.
Calculate the full cost of each offer for 1,200 m needed.
Write the comparison brief.
List the questions to ask supplier B.
Say which offer you would choose at this stage, and what could change the decision.
See the answers
Full costs
Offer
Quantity purchased
Materials excl. VAT
Carriage excl. VAT
Full cost excl. VAT
A
1,500 m (three drums)
1 290 €
€45 (carriage-paid threshold not reached)
1 335 €
B
1 200 m
948 €
120 €
1 068 €
C
1 200 m
1 104 €
€0 (carriage paid)
1 104 €
The mission brief
<documents>
[The three offers, each in its own tag.]
</documents>
<contexte>
Electrical contractor with 22 employees in Cenon. Requirement: 1,200 m of R2V 3G2.5 cable delivered to the depot before 4 December. Criteria: full cost 60%, lead time 25%, payment 15%.
</contexte>
<exemples>none</exemples>
<mission>
Compare the three offers on the full cost of the quantity actually purchased (including pack sizes), with carriage included unless the free-delivery threshold is reached.
</mission>
<rendu>
A table of criteria by supplier with the page for each piece of information, the full cost calculated by running code, and the weighted score. “Not in the offer” for any missing information. The questions to ask each supplier.
</rendu>
Roughly what you should get
Full costs: A €1,335, B €1,068, C €1,104 excl. VAT. B's lead time “not in the offer”. C's validity until 20 November flagged. Questions for B about the lead time.
B is the cheapest by €36 excl. VAT, but its lead time is not stated: without confirmation, the 4 December date is not guaranteed and the lead-time criterion cannot be scored. The questions for B: firm delivery date to the depot, carriage paid possible, price held. If B does not confirm before 20 November, C, delivered within 48 hours, becomes the safe choice before its offer expires. A is ruled out by its packaging: 300 m of surplus cable.
Practise
Three more exercises, from the most guided to the most demanding. The material is provided in full: copy it into your tool, then check your work against the criteria before opening the answers.
Level 1 · guided10 min
Spot what's missing in two offers
A 40-employee work integration charity in Périgueux buys workwear. Read the two offers, list the missing information needed for the comparison, then write the mission brief that will get Claude to flag it.
The material to work on
OFFER 1
Work trousers, 100 pieces: €18.50 excl. VAT per piece. Delivery within 3 weeks. Free carriage from €1,000 excl. VAT. Payment at 30 days.
OFFER 2
Work trousers, pack of 50: €840 excl. VAT per pack. Sizes 36 to 56. Offer valid for 15 days.
Check your work
The gaps in offer 1 are found: sizes available, validity
The gaps in offer 2 are found: lead time, carriage, payment
The price in offer 2 is converted to a unit price (€16.80 excl. VAT)
The brief requires “not in the offer” for any missing information
See the answers
The mission brief
<documents>
<document nom="offre-1">[offer 1]</document>
<document nom="offre-2">[offer 2]</document>
</documents>
<contexte>
Work integration charity with 40 employees in Périgueux. Requirement: 100 pairs of work trousers, sizes 38 to 54.
</contexte>
<exemples>none</exemples>
<mission>
Compare the two offers for 100 items.
</mission>
<rendu>
A table: price per item, cost for 100, sizes, lead time, carriage, payment, validity. “Not in the offer” wherever the information is missing. The questions to ask each supplier.
</rendu>
Roughly what you should get
Offer 1: €1,850 excl. VAT, free carriage, sizes and validity missing. Offer 2: €16.80 excl. VAT per piece, €1,680 excl. VAT for two packs, lead time, carriage and payment missing. Three questions per supplier.
Offer 2 looks €170 excl. VAT cheaper, but if carriage isn't included, the difference may vanish. The comparison is made after the answers to the questions, not before.
Level 2 · independent20 min
Score three offers on a weighted grid
A 16-employee printing firm in Niort is choosing a paper supplier. Write the mission brief that produces the weighted score as formulas, then calculate each supplier's score yourself.
The material to work on
CRITERIA AND WEIGHTS
Full cost: 50%
Lead time: 30%
Payment: 20%
SCORES OUT OF 10 (already given by the manager)
Supplier A: cost 8, lead time 6, payment 7
Supplier B: cost 6, lead time 9, payment 8
Supplier C: cost 9, lead time 5, payment 6
Check your work
The brief asks for the calculation in Excel formulas, not in its head
Your score for A is 7.2
Your score for B is 7.3
Your score for C is 7.2
You notice the difference is too small to decide on the grid alone
See the answers
The mission brief
<documents>
[Criteria, weightings and scores above.]
</documents>
<contexte>
Printing firm with 16 employees in Niort, choosing a paper supplier for 2027.
</contexte>
<exemples>none</exemples>
<mission>
Create an Excel file that calculates each supplier’s weighted score.
</mission>
<rendu>
One row per supplier, one column per criterion, the weightings in separate cells so they can be changed, and the weighted score as a formula. Then a test: the score if lead time is weighted at 40% and cost at 40%.
</rendu>
Roughly what you should get
A three-row file, adjustable weights, scores of 7.2, 7.3 and 7.2, then the test: A 7.0, B 7.6, C 6.8.
Calculation: A = 8 × 0.5 + 6 × 0.3 + 7 × 0.2 = 7.2; B = 3 + 2.7 + 1.6 = 7.3; C = 4.5 + 1.5 + 1.2 = 7.2. A tenth of a point decides nothing: testing the weights shows that B wins as soon as lead time counts for more. The decision depends on what really matters to the printing firm.
Level 3 · demanding case35 min
Designing delivery tracking for a workshop
A 50-employee industrial joinery workshop in Cholet tracks 60 open supplier orders in Outlook with a Microsoft 365 business account. Design the complete set-up: the step to start with, the reference spreadsheet, the task instructions, the chasing rule, and what to ask the administrator.
The material to work on
SITUATION
- Shared achats@ mailbox in Outlook, Microsoft 365, business account
- Open orders tracked in an Excel file on SharePoint: no., supplier, item, quantity, promised date, criticality (A, B, C)
- Suppliers sometimes give the date in the body of the message, sometimes only in an attached PDF
- Claude plan: Team, Standard seats
- The managing director wants “the chasers to go out on their own”
Check your work
The process starts with three weeks done by hand
The Microsoft Entra administrator must give consent and decide whether to enable the write tools
Chasers stay as drafts approved by a person, with an explanation for the managing director
The problem of dates written only in PDFs is dealt with
Criticality A triggers a phone call, not an e-mail
See the answers
Weeks 1 to 3: by hand, messages copied and Excel attached, status checked every Monday.
Request to the administrator: Microsoft Entra consent for the Microsoft 365 connector, activation by the owner of the Claude organisation, write tools left switched off to begin with.
Suppliers: an e-mail asks them to write the delivery date in the body of the message; in the meantime, critical PDFs are attached by hand.
Week 4: task scheduled every Monday, statuses and draft chasers, nothing sent.
The task instructions
<documents>
The file “commandes-ouvertes.xlsx” on SharePoint.
</documents>
<contexte>
Industrial joinery workshop with 50 employees in Cholet. Criticality A: a delay stops a line; B: a delay pushes back a customer order; C: no immediate consequence.
</contexte>
<exemples>none</exemples>
<mission>
Every Monday at 7am, read the last seven days of messages in the purchasing inbox, match them against the open orders and give each one a status.
</mission>
<rendu>
Three lists: criticality A late or with no news (to phone, no draft), criticality B (draft chaser), criticality C (brief mention). For each status, the date of the source message, or “date only in an attached PDF, not read”. Send nothing.
</rendu>
Roughly what you should get
Every Monday: two or three A orders to phone, a few drafts for the B orders, one line for the C orders, and the list of messages whose date is in a PDF.
The answer to the director: a chaser to a supplier commits the company and can damage a relationship; a person approves it in two minutes. The gain lies in detection and drafting, not in automatic sending.
All the task briefs and copy-ready requests from the course, including answers, worked examples and practice exercises, sorted by module and lesson, with filters to find the right one.
For each lesson, the main exercise and the three graded practice exercises with their materials, to do on paper or alongside Claude; all the answers are grouped at the end.
The course’s practical examples, job by job: the situation, the requests as they were written, the standard replies obtained and what was checked before using them.
All the lessons in a single PDF: objectives, written course with its diagrams, tables and requests, common mistakes, exercise and key takeaways. The practice exercises and answers are in the workbook, the examples in the collection.
Your notes stay on this device; they are not sent anywhere.
A question for the tutor
A result that doesn’t match the model answer, a prompt that gets you nowhere, a case specific to your business: write to us with your prompt and the response you got. A Bonbay Académie trainer replies within 24 working hours, on your case.