A lesson is completed when you tick it, when you watch its video to the end or when you score 80% on its quiz. The certificate is issued online after the final assessment, from a score of 32 out of 40.
Lesson 47, module 12: Complete cases from A to Z A month of maintenance on a fleet of sites Thirty-five sites, three servers, one month: where do you start? Four stages, every month: inventory, intervene, check, report. [Diagram: The maintenance month] 1. Inventory 2. Intervene 3. Check 4. Report The cycle restarts every month; the month's report feeds the next one's inventory. Week 1: a snapshot of the fleet, before any action. "online" or "unreachable" Outdated versions and runtimes Who looks after each site Week 2: the alert, the logs, a fix to review. Prompt: Three sites on server 2 have been unreachable since 7:10. Read the server logs read-only, tell me the access used and the likely cause. Don't restart anything without my go-ahead. Response: Server 2's production SSH access, then the likely cause read from the logs, a full disk for example, and the proposed action, to review. The log is marked "production". In production, the command runs without confirmation: weigh the risk first. [Diagram: Actions in production] Vertical: risk if it goes wrong; horizontal: frequency. Restore, migrate Read a configuration Read a log Preferred: Update On a production machine, the command runs without confirmation: the risk is handled beforehand, in the prompt. Week 3: a test restore, and the portal requests. A backup only exists if it can be restored Written, Task, Fixed, Resolved Week 4: one report per client, reviewed before sending. "To review before sending" "Sent to client": your action Session time isn't everything In the exercise, you run week 2 of Julien's fleet. Your turn: Run week 2 of Julien's fleet The written lesson, the corrected exercise and the quiz are below the video.
Lesson 47 of 48 · module 12, complete cases from start to finish
A month of maintenance on a website estate
Julien maintains 35 sites on three servers. In four weeks, he inventories the estate, handles an incident from alert to fix, checks backups, certificates and domains, turns portal requests into tasks, automates the Monday update, then reviews and sends a report for each client. Every action in production is weighed first.
23 min of reading
1 min 51 of video
6 diagrams
5 demandes to copy
3 exemples pratiques
4 exercices answerss
5 questions
1 ressource
By the end of this lesson, you will know how to
Inventory a site estate and draw up the month’s tasks
Handle a production incident from alert to fix, leaving the steps that matter to a person
Produce one maintenance report per client and read the month’s profitability
What’s covered
Week 1. Inventory the estate
Week 2. An incident, from alert to fix
Week 3. Backups, renewal dates and requests
An automation for the Monday catch-up
Week 4. Reports and profitability
3 worked examples, followed from start to finish
Exercise with answers · Run week 2 of Julien’s site estate
3 practice exercises, from guided to demanding cases
The quiz
Key points
The maintenance month runs in four stages: inventory, intervene, check, report.
In production, the command runs without confirmation: read first, propose, then give written, limited approval.
A backup only exists if it can be restored, to pre-production.
A portal request becomes a task in one step and goes through to “Resolved”, confirmed by the client.
The report goes out “in your name”, reviewed before sending; session time is not all of the team’s time.
Julien is technical lead at a 12-person web agency in Bordeaux. The agency maintains around 35 client sites under contract: mostly WordPress sites, a few Next.js sites, spread across three servers. Each client pays a monthly fixed fee and expects two things: that their site stays up, and a report of what has been done. On the first Monday of the month, Julien opens the Sites screen. This case follows his month, week by week.
The maintenance month
1Inventory
Statuses, versions, outdated runtimes, end-of-life dates: a snapshot of the estate.
2Intervene
An alert, its cause in the logs, a reviewed fix.
3Check
A test restore, certificates, domains, requests.
4Report back
One report per client, reviewed before sending, and the month’s profitability.
The cycle starts again every month; the month’s report feeds the next month’s inventory.
Week 1. Inventory the estate
The Sites screen (“Websites” in the web app) shows the whole estate: each site, its environment, its status (“online” or “unreachable”), its check labels such as “Certificate up to date” or “Backed up last night”, and the person who looks after it. The Monitoring view groups alerts by site; the Estate view shows everything. Julien launches a scan campaign and reads the version inventory: runtimes, CMS versions, what is no longer patched by its publisher, end of life for machines and sites. The number of sites monitored does not affect the price of Nexus.
Read the estate from the web app
Open https://nexus-engine.eu/app/ and click “Websites” in the left-hand bar.
Use the Monitoring view to see alerts by site.
Open the record of a site in alert: client, project, server, and who looks after it.
Go back to the Estate view to see all sites and their environments.
An extract from the inventory, and Julien’s decision
Website
What the inventory says
Decision
Dental practice website
PHP on a version that no longer gets fixes
Task: move to a supported version, in pre-production first
A wine merchant’s online shop
Nine plugins to update
Task: update in the Tuesday morning window
Town hall annexe website
Certificate up to date, backed up last night
Nothing this month
Rugby club website
Unreachable for 40 minutes
Incident, handled immediately
A caterer’s Next.js application
Node runtime reaching end of life in three months
Task scheduled, migration quote to the client
Draw the month’s tasks from the inventory
Read the estate inventory and the latest scan campaign. For each site, sort what you find into three groups: deal with this month, schedule with a quote, nothing to do.
For the first group, propose one task per site in the client’s maintenance project: title starting with a verb, priority, estimated hours, assignee according to the site record (“who looks after it”), due date within the month.
Don’t create any tasks until I approve. Don’t act on any server.
Roughly what you should get
What to expect: a table of the 35 sites in three groups, a dozen proposed tasks with their times, and the list of end-of-life items to cost. Nothing is created until Julien says yes.
Week 2. An incident, from alert to fix
Tuesday, 7.10am: three sites on server 2 become unreachable. Nexus alerts take the length of an outage into account and group sites on the same server: Julien gets one alert about the server, not three. The agent chooses the access by site, host and environment, and says which one it is using. On a production machine, the command runs without confirmation and the log records it as “production”; if company policy closes off production, the answer is a flat refusal. So caution has to be written into the request: read first, propose, wait for approval.
Diagnose without breaking anything
Server 2 alert: three sites unreachable since 7:10am.
Using the server 2 production SSH credentials, read-only: disk space, memory, status of the web and database services, last 50 lines of the error logs for the three sites. First tell me which credentials you're using.
Then give the likely cause and the action you propose, with what it might break. Don't restart, delete or change anything until I've given written consent in this chat.
Roughly what you should get
What to expect: the credentials named, then findings such as “disk at 100%, 14 GB log folder on the rugby club site, database service stopped for lack of space”, and a proposed action (“archive then empty this log folder, then restart the database”), with its risk.
A delete command runs in production without confirmation: your written approval is what acts as the safeguard.Actions in production
HighRisk if it goes wrongLow
Restore, migrate
Pre-production first, backup verified, client’s written approval.
Update
Window agreed with the client, last night’s backup checked beforehand.
Read a configuration
The agent alone, read-only, stating the access used.
Read a log
The agent alone, every morning, without changing anything.
RareFrequencyEvery week
On a production machine, the command runs without confirmation: the risk is dealt with beforehand, in the request.
See work in progress and find the backup routesTerminal
# les tâches en cours de toute l'équipe, tous projets confondus
nexus taches --toutes --statut IN_PROGRESS
# l'inventaire de l'API, filtré sur les sauvegardes (30 routes par page par défaut, 33 au plus)
curl "$NEXUS_URL/api/v1/endpoints?filter=sauvegardes&limit=30" \
-H "Authorization: Bearer $NEXUS_CLE"
The key is created in Settings › API and acts with the permissions of whoever created it. It is stored in an environment variable, never in a shared script.
Week 3. Backups, renewal dates and requests
A backup only exists if it can be restored. Every month, Julien picks two sites and has their nightly backup restored to pre-production, never over production. He then reviews the certificate and domain renewal dates; when a DNS record needs changing, Nexus shows a preview before applying it. Client requests come in through the portal: each one becomes a task in one step, with its messages, and moves through the statuses Written, Task, Fixed, Resolved. The client reads the whole thread: there are no internal messages in a request.
A portal request, all the way through
1Written
The client describes their need in their portal, attachments included.
2Task
Turned into a task in one step, with its messages, assigned and estimated.
3Fixed
The fix is live; the client is informed in the thread.
4Resolved
The client confirms it is sorted.
To share out the work, Julien asks for the team’s workload: for each member, tasks overdue, due, in progress, estimated hours and anything without an estimate, plus unassigned tasks. The default period is the working week; on Fridays and at weekends, it’s the following one.
An automation for the Monday catch-up
Every Monday, Julien wants the list of the week’s alerts, missed backups and open requests. He describes it in Automation: a trigger, then steps (Nexus actions, rules without AI, bounded agent missions, human interventions). The automation starts as a draft, is tested in simulation, then published and activated. Any step that writes to a client requires human approval, and a run marked “to be checked” is never rerun on its own: it may already have happened.
Describe the Monday update
Create in Automation, as a draft, the automation “Monday maintenance update”.
Trigger: every Monday at 8am.
Steps: read the estate’s alerts for the last seven days; read the missed backups; read client requests still open and their status; put together a message of no more than fifteen lines, without AI for the figures; post it in the “maintenance” channel in Message.
No step writes to a client. Test it in simulation over last week and show me the resulting message. Do not publish it.
Roughly what you should get
What to expect: a draft on the canvas, four steps, the simulation result for the past week (“3 alerts, including 1 52-minute incident on server 2; 1 missed backup; 4 open requests, 2 of them in Task”) and the sentence “ready to publish: your call”.
Week 4. Reports and profitability
Maintenance reports go out “in your name”: for each client, what was monitored, checked, updated and fixed. They start with the status To review before sending, and move to Sent to client when Julien, after reviewing them, sends them; the client finds them in their portal. On the agency side, Hugo, the managing director, reads profitability: dated prices keep the history, missing costs are flagged, and session time does not represent all of the team’s hours. A fixed fee is judged on the real time spent, not just the agents’ time. Status and screen labels may vary slightly depending on the version.
Mistakes to avoid
Writing to the agent “look at what’s wrong on server 2 and fix it”.
On a production machine, every command runs without confirmation. “Fix it” authorises in advance a restart or a deletion nobody has thought through.
First ask for a read-only check and a probable cause, then give written approval limited to the proposed action alone.
Assuming that a “Backed up last night” line proves the site can be restored.
A backup can exist without containing the media, or without restoring. The fault comes to light on the day of the incident.
Each month, restore two backups to staging and check the resulting site in the preview.
Mark a request “Resolved” as soon as the fix is live.
The client has confirmed nothing. If they find the problem persists, they discover it in a thread marked resolved and feel they are not being listened to.
Move the request to “Fixed”, tell the client in the thread, and let their confirmation move it to “Resolved”.
Letting the monthly report go out as the agent prepared it.
A “100% available” claim or backups described as “tested” when they weren’t commit the agency in writing, and the client will reread them the day there’s a dispute.
Check each report against the month’s facts before you send it yourself; until then the report stays “To review before sending”.
3 SME situations followed from start to finish: the prompts exactly as they were written, the model answer to aim for, and what was checked before sending.
Example 1
Eight craft businesses’ sites run by a freelancer
Pauline is a freelance developer in Libourne. She maintains eight WordPress sites for tradespeople around Libourne (a roofer, two bakeries, a garage, a plumber, a florist, an upholsterer, an electrician) for a monthly fee. She wants to get her month done in half a day.
Eight sites in half a day
1Estate status
Three groups, nothing touched.
2Backup first
The station bakery fixed first.
3Updates
Three sites, within the agreed window.
4Eight reports
Reviewed, then sent by Pauline.
Request 1
Read the status of the eight sites in my estate: status, certificate, last night’s backup, available updates. Sort them into three groups: nothing to do, simple update, needs a closer look. Don’t touch anything.
Model answer
Nothing to do (4): roofer, town-centre bakery, florist, upholsterer.
Simple update (3): garage (2 plugins), plumber (1 plugin), electrician (WordPress core, minor version).
Look at closely (1): station bakery, nightly backup missing for three days.
Pauline starts with the station bakery: three days without a backup matter more than all the updates.
Request 2
For the eight sites, prepare this month’s maintenance report, one per client: what was monitored, what was updated, the backup incident at the station bakery and how it was fixed. Five lines per report at most. Leave them in the “To review before sending” status.
Model answer
What to expect: eight short reports in your name, the backup incident explained in two sentences for the station bakery, and all of them awaiting review.
Pauline reviews the eight reports in twenty minutes, corrects one, then sends them.
What was checked before sending
The priority: the missing backup handled before the updates.
Reports: reviewed one by one before sending, none sent by the agent.
Time: her half-day measured, not just the agents’ session time.
Rough scale: half a day a month for eight sites, instead of a day and a half logging in site by site.
Example 2
Twenty WordPress sites at IONOS and a scan campaign
Karim is a developer at a four-person agency in Mérignac. The agency maintains 20 WordPress sites hosted with IONOS. A security e-mail announces a vulnerability in a widely used form plugin; Karim needs to know within an hour which sites are affected.
A disclosed vulnerability, one morning
9 hSecurity e-mail
A vulnerable form plugin.
9 h 20Scan campaign
Six sites affected out of twenty.
10 hTasks and messages
Six urgent tasks, six messages sent by Karim.
12pm–2pmUpdates
Backup verified, then site by site.
Request 1
Launch a scan campaign on the 20 sites in the estate: for each, whether the [plugin name] plugin is present and its version. Read-only. Return a sorted table: vulnerable version, fixed version, absent.
Model answer
Vulnerable version (6): [list of the six sites]
Fixed version (2): [list]
Not present (12): [list]
Access used: each site’s production SFTP access, all read-only.
Karim checks the fixed version announced by the plugin’s publisher on its official page before launching anything.
Request 2
For the six vulnerable sites: create one task per site in their maintenance project, urgent priority, due today, assigned to me. In each client’s portal, prepare a three-line message announcing the security update between 12pm and 2pm. Leave the messages as drafts.
Model answer
What to expect: six urgent tasks created, six draft messages in the clients' threads, and a reminder that each site's overnight backup must be checked before the update.
Karim sends the six messages, checks the six backups, then has the sites updated one by one.
What was checked before sending
The source: the fixed version read from the plugin’s publisher, not guessed.
The backup: checked site by site before the production update.
The client: informed by a message reviewed and sent by Karim.
Rough scale: one hour to find out which sites are affected and notify clients, instead of half a day logging in one by one.
Example 3
Three online shops before December
Élodie is a project manager in a nine-person studio in Bègles. The studio maintains three online shops whose December revenue matters a great deal: a chocolatier, a wooden toy maker and a children’s clothing brand. She wants to freeze the risks before 1 December.
December, with and without preparation
Untested
A domain expiring on 9 December
Media missing from backups
Discovered mid-incident
With the month of November
Domain renewed by the client
Backup restored to pre-production
Scope fixed before the 28th
Request 1
For the three shops: certificate expiry date, domain renewal date, last successful test restore, pending updates, and my team’s workload over the last three weeks of November. Propose a schedule that finishes everything before 28 November.
Model answer
What to expect: a table per shop (a domain expiring on 9 December, a test restore never done on the toy shop), the team's workload week by week, and a five-task schedule spread according to availability.
Élodie asks the toy maker to renew its domain itself, on its own account: that is its action to take.
Request 2
Restore last night’s backup of the toy shop to its pre-production environment. In the preview, check the home page, a product page, the basket and the checkout page in test mode. Report back.
Model answer
What to expect: the restore carried out on staging only, then a report that separates “Checked” and “To verify”, including a missing product image, a sign that the media aren't in the backup.
The media were missing: Élodie has the backup scope corrected before December. Without the test, the agency would have found out during an incident.
What was checked before sending
Deadlines: reviewed in monitoring, and the domain renewal left to the client.
The restore: done on staging, never over the live online shop.
The result: a backup fault found by the test, fixed before the busy period.
Rough scale: three days of preparation spread over November, instead of an incident in December that costs the client sales.
Tuesday, 7.10am, the alert comes in: three sites on server 2 are unreachable (a rugby club, a dental practice, and a wine shop whose online store takes orders). At 8.05am the dental practice writes in its portal: “Our site won’t open any more, our patients can’t book appointments.” At 8.20am the agent finds the cause: the disk is full because of the rugby club site’s logs. Write the morning’s requests, say what Julien decides himself and what he writes to the dental practice.
Write the read-only diagnostic request.
Write the approval Julien gives for the fix, with its limits.
Turn the practice’s request into a task and prepare the reply in its thread.
Say what will stop the incident recurring, and where that is recorded.
See the answers
Approval for the fix, limited
I approve the proposed action, and only that one: archive the log folder of the rugby club’s site to [archive folder], check that the archive is readable, then empty the original folder and restart the database service. Do not touch any other folder or any other site. Then check that all three sites respond and give me the remaining disk space.
Roughly what you should get
What to expect: each command named before it runs, the credentials used, “production” noted in the log, then “three sites online, disk at 61%”.
The reply to the dental practice
Turn the dental practice’s request into a task, linked to the server 2 incident. In its thread, prepare a five-line reply: the site was back up at [time], the cause (a shared server overloaded by another site), what we’re doing to stop it happening again. No filler apologies, no promise of timescales I haven’t given. Leave it as a draft.
Roughly what you should get
What to expect: the task created with the messages from the thread, the request moved from “Written” to “Task”, and a five-line draft that Julien reviews and sends himself.
To stop the incident recurring, Julien creates a task “Limit the size of server 2 logs” and records a fact in the maintenance project: log rotation wasn’t set up for the rugby club site. He’ll have it handled in pre-production first. The month’s report will mention the incident, its actual duration and what changed.
Practise
Three more exercises, from the most guided to the most demanding. The material is provided in full: copy it into your tool, then check your work against the criteria before opening the answers.
Level 1 · guided10 min
Sort the alerts on a Monday morning
Here are the alerts and the state of the estate as Julien read them one Monday at 8am. Classify each line: deal with now, schedule within the month, nothing to do. Justify in one sentence.
The material to work on
1. Rugby club site: unreachable for 35 minutes (server 2).
2. Dental practice site: unreachable for 35 minutes (server 2).
3. Wine merchant's shop: certificate expires in 6 days, auto-renewal active.
4. Town hall annexe site: last night's backup missing.
5. Caterer's application: runtime reaches end of life in 3 months.
6. Architect's site: online, certificate up to date, backed up last night.
7. Driving school domain: renewal due in 20 days, auto-renewal inactive, domain in the client's name.
Check your work
Lines 1 and 2 are read as a single server 2 incident
The missing backup is handled now
The driving school’s domain is handed back to the client, who renews it themselves
End of life is planned with a quote
See the answers
Line
Filing
Why
1 and 2
Now
A server 2 incident, a single likely cause
3
Nothing, check next Monday
Auto-renewal on
4
Now
A night without a backup is an open risk
5
Schedule
Migration quote to the client
6
Nothing
All green
7
Now, in a message
The client renews their domain themselves
Notify the driving school client
In the driving school’s portal, prepare a four-line message: its domain expires on [date], auto-renewal is off, it must renew it in its [registrar] account before that date, and we’ll check on [date]. Leave it as a draft.
Roughly what you should get
What to expect: a short draft in the thread, with both dates, waiting for Julien to send it.
Level 2 · independent20 min
Write the missed-backups automation
The agency manager wants to be told every morning about missed backups, and for every backup missed two nights in a row to become a task. Read his instructions and write the request that creates the automation, as a draft, with its test.
The material to work on
MANAGER’S INSTRUCTIONS
“Every morning at 7.30am: the list of sites missing last night’s backup, in the maintenance channel.
If a site misses two nights in a row: an urgent task in its maintenance project, assigned to the person who looks after the site.
Never any message to clients without me.
I want to see what it would have done last week before activating it.”
Check your work
The trigger is daily, at the given time
The two-night rule is a condition without AI
The task is assigned according to the site record
No step writes to a client
The simulation test is requested before any publication
See the answers
The automation, as a draft
Create in Automation, as a draft, “Missed backups”.
Trigger: every day at 7.30am.
Step 1: read last night’s backups for every site in the estate.
Step 2: post in the “maintenance” channel in Message the list of sites without a backup, or “No missed backups”.
Step 3, rule without AI: for each site without a backup two nights in a row, create an urgent task “Restore backups for [site]” in its maintenance project, assigned to the person who looks after the site.
No step writes to a client. Test it in simulation over the last seven days and show me what would have happened. Do not publish.
Roughly what you should get
What to expect: a three-step draft, then the simulation result, day by day, with the tasks that would have been created.
The manager reads the simulation, then publishes and activates it himself. If a run is ever marked “to be checked”, nobody reruns it before looking at whether the tasks have already been created.
Level 3 · demanding case30 min
Review a maintenance report before sending
Here are the month’s facts for a client and the maintenance report prepared by the agent. Point out everything that is wrong, vague or missing, write the correction request, then the report Julien would send.
The material to work on
FACTS FOR THE MONTH, DENTAL PRACTICE WEBSITE
Monitoring: site unreachable on Tuesday 7th from 7.10am to 8.42am (cause: full disk on the shared server, filled by another site).
Backups: 30 nights out of 30. Test restore: not done this month.
Updates: WordPress (minor version), 3 plugins, on the 14th, on staging then live.
Client request: “appointment booking down” on the 7th, task created, fixed on the 7th at 8.42am, not yet confirmed by the client.
Coming up: the site’s PHP version will stop receiving fixes in 4 months.
REPORT PREPARED BY THE AGENT (To review before sending)
“This month, your site was 100% available. All backups were made and tested. We updated WordPress and your plugins. Your request of the 7th is resolved. No action is required on your part.”
Check your work
You spot the 100% availability claim despite the 1 h 32 min outage
You spot the backups described as “tested” when no test restore took place
You spot that the request is marked “resolved” when it is only fixed
You add PHP’s end of life as a decision for the client to make
The report stays “To review before sending” until Julien sends it
See the answers
What’s wrong
In the report
What is true
100% available
An outage on the 7th, from 7.10am to 8.42am
Tested backups
30 out of 30 done, no test restore this month
Request resolved
Fixed, awaiting client confirmation
No action required
A decision to make: PHP reaching end of life in 4 months
The correction request
Redo the dental practice’s report using only the month’s facts I’m pasting in: [month’s facts]. Three sections: what happened (the outage on the 7th with its exact times and cause), what we did (backups 30 out of 30, updates on the 14th, fix on the 7th), what you need to decide (the PHP version, with a quote to follow). Don’t write any availability percentage. Write “fixed, please confirm on your side” for the request of the 7th. Leave the report in the “To review before sending” status.
Roughly what you should get
What to expect: a ten-line report in three parts, every fact traceable to the list, no invented figures.
The report Julien sends What happened: your site was unreachable on Tuesday 7th, from 7:10am to 8:42am, because the shared server that hosts it was overloaded by another site. The cause has been fixed and is being monitored. What we did: 30 backups over 30 nights; WordPress and three plugins updated on the 14th, checked before going live; appointment booking fixed on the 7th, to be confirmed on your side. To decide: your site's PHP version will stop receiving fixes in four months. We'll send you a quote for moving to a supported version.
Every request to the project agent written in the course, including model answers, worked examples and practice exercises, sorted by module and lesson, with filters to find the right one.
For each lesson, the main exercise and the three graded practice exercises with their materials, to do on paper or alongside Nexus; all model answers are gathered at the end.
The course’s worked examples, from the first project to production: the situation, the request as it was written, the agent’s typical answer and what was checked before approving.
All the lessons in a single PDF: objectives, written course with its diagrams, tables and requests, common mistakes, exercise and key takeaways. The practice exercises and answers are in the workbook, the examples in the collection.
Your notes stay on this device; they are not sent anywhere.
A question for the tutor
A result that doesn’t match the model answer, a prompt that gets you nowhere, a case specific to your business: write to us with your prompt and the response you got. A Bonbay Académie trainer replies within 24 working hours, on your case.