A lesson is completed when you tick it, when you watch its video to the end or when you score 80% on its quiz. The certificate is issued online after the final assessment, from a score of 32 out of 40.
Lesson 43, module 12: Complete cases from A to Z A showcase website delivered from A to Z A showcase site in five weeks: who does what, and when?
Five weeks, one major stage per week. [Diagram: Five weeks, from portal to fleet] Week 1: Request and tasks Week 2: Design approved Week 3: Code and preview Week 4: Staging and acceptance testing Week 5: Production and fleet One week per major stage; acceptance testing and production follow each other, never at the same time. Week 1: Sandrine's request becomes tasks. Prompt: Read Sandrine's request and the attached brief. Propose the site's tasks: title, priority, hours, assignee, planned branch. Don't create anything without my go-ahead. Response: A list of eight to twelve proposed tasks, with their estimates and branches, and the questions to ask Sandrine. Nothing is created until Claire says yes. Week 2: code only starts from a mock-up in its final version. Territory, logo, mock-up in the Studio 7-day link for Sandrine "Final": Inès's action Weeks 3 and 4: one branch per task, the preview, staging. Access details read from the vault, never pasted Pushing isn't deploying Every finding approved by Claire Week 5: four questions before requesting production. [Diagram: Before requesting production] 1. Is the coded mock-up the Studio's final version? 2. Are all acceptance testing findings approved by Claire? 3. Does staging work on desktop and phone? 4. Is the code merged, pushed, with continuous integration not red? Yes to all: Claire writes to the agent "put it in production": the stricter review applies, then the site joins the fleet. The agent prepares, a person decides: each step has its human action. [Diagram: Who does what on this showcase site] Green: The agent does it alone, you review Orange: The agent prepares, a person confirms Red: A person only The agent prepares, a person decides: the human action rule, applied to the project. In the exercise, you run week 4: staging and acceptance testing. Your turn: Run week 4 for the wine merchant The written lesson, the corrected exercise and the quiz are below the video.
Lesson 43 of 48 · module 12, complete cases from start to finish
A brochure site delivered from start to finish
This case replays the Saint-Émilion wine merchant’s project in full: from Sandrine’s request to the monitored site, in eight stages and five weeks. At each stage, you see the request made to the agent, what gets checked and the action that remains with a person, up to the production requested by Claire.
29 min of reading
1 min 58 of video
6 diagrams
4 demandes to copy
3 exemples pratiques
4 exercices answerss
5 questions
1 ressource
By the end of this lesson, you will know how to
Work through the eight stages of a brochure website in Nexus, from the client's request to monitoring
Write, for each step, the request to the agent and the check that follows it
Name, at each step, the human action and the person who performs it
What’s covered
Week 1. From request to tasks
Week 2. Design approved before code
Week 3. Code, with access from the vault
Week 4. Pre-production and acceptance testing
Week 5. Production and monitoring
3 worked examples, followed from start to finish
Exercise with answers · Run week 4 for the wine merchant
3 practice exercises, from guided to demanding cases
The code starts from the final version in the Studio, never from the latest version produced.
Secrets go from the vault to the .env without ever passing through the conversation.
Pushing is not deploying; pre-production follows the push, production follows Claire’s request.
The agent marks a finding “handled”; only the person who raised it approves it.
One Tuesday in September, at 8:40am, Sandrine writes in her portal: “Our website dates from 2015, it displays badly on phones and we want to be ready for the festive season. Can we talk about it this week?” The Chartrons studio has five weeks. This case brings together the whole project followed since the start of the course, in the real order of the work, and sets it out in the eight-step journey Nexus describes for web agencies: Request, Task, Design, Code, Pre-production, Acceptance testing, Production, Monitoring.
Five weeks, from portal to portfolio
Week 1Request and tasks
Sandrine's request becomes tasks, each with its planned branch.
Week 2Design approved
Place brand, logo and mock-up are marked final in the Studio.
Week 3Code and preview
One branch per task, access read from the vault, the preview at all three formats.
Week 4Pre-production and acceptance testing
Deployment after push, numbered findings, each approved by Claire.
Week 5Production and fleet
Go-live requested by Claire, followed by monitoring and backups.
One week per major step; acceptance testing and production follow each other, never at the same time.
Week 1. From request to tasks
Claire turns the request into a task in a single action: the exchanges with Sandrine follow it, and the request moves through the states Written, Task, Fixed, Resolved. She then completes the project record, the one the agent rereads at every session: the client, the addresses (the old site in production, the future pre-production, the local address), the conventions (“formal ‘vous’, no prices on the site, photos of the wine cellars supplied by Sandrine”), and the brief attached as a file. An up-to-date record is the first step of the loop: Locate.
Break the site down into tasks, without creating anything before approval
Read Sandrine’s request in the portal and the brief uploaded to the project record.
Propose a breakdown of the brochure site into tasks: for each one, a title starting with a verb, the priority, the estimate in hours, the assignee (Inès for design, Malik for code, Théo for copy and SEO), the due date and the planned branch name.
The site must go live on [date]; acceptance testing starts on [date].
Add, separately, the questions to ask Sandrine before we start.
Do not create any tasks until I have replied “yes”.
Roughly what you should get
What to expect: a table of eight to twelve tasks (“Design the home page”, “Build the contact form”, “Carry over the old site’s URLs”…), each with its hours and branch, then three or four questions (photos, legal notice, address for receiving enquiries). After your “yes”, the tasks are created with their source: the link to the request.
Assigning Malik or Inès to a task adds them to the project: then check that they can actually see the sites and their access.
Week 2. Design approved before code
Inès moves from the brief to the brand territory, then to the refreshed logo and the home page mock-up, each in the Studio, with every round by the agent freezing a dated version. Sandrine has no account: Inès sends her a 7-day share link, which freezes the version named in the window. Sandrine comments on two areas (“the photo of the cellar is too dark”, “the contact button needs to be more visible”). Inès handles them, has the new version approved, then sets it to final. This version is authoritative, code included: Malik builds nothing else.
Send the mock-up to Sandrine for comments
In the Studio, right-click the mock-up card, or open the design's menu.
Choose “Share…”, then “Create a link” (Sandrine has no account).
Choose the “7 days” duration rather than “no limit”, and check the version named in the window.
Paste the link into your e-mail straight away: it is copied immediately and is not shown again.
Once you have received the comments and the version is approved, go back to the window and click “Revoke”.
Week 3. Code, with access from the vault
Malik has stored the old host’s FTP access in the vault (type FTP / SFTP, Production environment, linked to the site) and the e-mail sending API key (type API key). He never pastes a secret into the chat: the agent compares the .env.example template with what the vault can fill in and generates the .env without displaying a single value. In development, with no SMTP in the vault, e-mails from the form are captured in the E-mails tab and are not sent. On each task, Malik clicks “Work on it”: the session opens on the task’s branch, and every commit starts with [tache <id>].
Build a page from the final mock-up
Current task: [task title].
Build the home page from the final version of the mock-up in the Studio and from the project tokens. No colours or spacing outside the tokens.
The contact form sends to the address read from the .env; generate the .env from the vault if a value is missing, without showing me any secret.
Check in the preview at desktop, tablet and mobile formats: no horizontal overflow, no console errors. Write your report separating what has been checked from what still needs checking by hand.
Commit to the task’s branch and push. Do not deploy.
Roughly what you should get
What to expect: the page built on the branch, a preview report that separates “Checked” (three formats opened, HTTP status, clean console) and “To verify” (real Safari on an iPhone, actual form submission), the test e-mail visible in the E-mails tab, and the commit pushed.
The preview is an embedded Chromium: “it is not a test on a real phone”. For Safari, ask for a comparison in real browsers.
Track progress from the terminalTerminal
# les tâches du projet qui attendent une relecture
nexus taches --projet "[nom du projet]" --statut IN_REVIEW
# les sessions d'agents ouvertes sur ce poste, et leur état
nexus sessions
# ajouter une demande dans la file d'une session sans l'ouvrir
nexus envoyer [session] "Quand la tâche en cours est poussée, rends-moi la liste des fichiers modifiés."
These commands read or queue a request: none of them deploys or deletes anything.
Week 4. Pre-production and acceptance testing
Pushing is not deploying. Once the branches have been merged and pushed, the agent deploys to pre-production using the recipe stored in the repository (.nexus/deploiement.json), with the same check as for a human: a clean, pushed repository. Claire then opens pre-production and runs her acceptance test: she circles an area of the page, writes her comment and sends it. Each finding carries a numbered badge, its screenshot, the address, the screen format and the console. The agent fixes it and marks the finding “resolved”; only Claire approves it, after looking at it on screen.
Before asking for production
1Is the coded mock-up the final version in the Studio?
No Compare the code with the final version, or have the new version approved.
2Have all acceptance test findings been approved by Claire?
No Look at each “resolved” finding on screen before approving.
3Does pre-production respond on desktop and mobile?
No Reopen the preview and the real browsers, fix, redeploy.
4Is the code merged and pushed, with continuous integration not red?
No Merge the merge request and wait for green.
Yes to allClaire writes “put it into production” to the agent: the stricter review applies, then the site joins the portfolio.
A single “no” is enough to wait: production starts from a clean, verified state.
Week 5. Production and monitoring
Production never goes ahead on the agent's initiative. Claire writes it: “Put it into production.” The review is then stricter (clean tree, everything pushed, code merged, continuous integration not red), and company policy can close off this action. The site then joins the estate: availability monitoring, backups, certificate and domain renewal dates, and the person responsible. Sandrine gets access to her portal, where she will see her requests and maintenance reports. Button and tab labels may vary slightly between versions: Nexus changes every week.
The eight stages of the case, and their human action
Step
What the agent does
What can be checked
The human action
Request
Reads the request and its thread
The full thread, the attachments
Claire turns the request into a task
Task
Proposes the breakdown, creates after approval
Hours, assignees, branches
Claire says “yes” to the breakdown
Design
Place brand, logo, mock-up
The version, Sandrine's comments
Inès sets the mock-up to final
Code
Code on the branch, credentials read from the vault
The preview at all three sizes
Malik reviews the merge request
Pre-production
Deploys after push, rechecks the address
The deployment log
None, if the repository’s recipe exists
Acceptance testing
Fixes, marks as “handled”
Each finding on screen
Claire approves finding by finding
Production
Deploys on request, strict review
The live address, the console
Claire asks for production
Supervision
Monitors, backs up, prepares the report
The alerts, the overnight backup
Claire reviews and sends the report
Who does what on this brochure site
The agent does it alone, you review
Create the tasks from the brief
Write the code on the task's branch
Check in the preview and write the report
Deploy to pre-production after pushing
The agent prepares, a person confirms
The reply to Sandrine in her request's thread
The maintenance report, to review before sending
The “handled” finding, approved by Claire on screen
One person only
Mark the mock-up as final
Create the share link for Sandrine
Request the production release
Sign the quote, set the team’s permissions
The agent prepares, a person decides: the human action rule, applied to the case.
Mistakes to avoid
Building the latest version of the mock-up because it is the most recent.
Every agent round freezes a version, including a trial asked for in passing. The most recent one isn’t necessarily validated, and the client discovers a title online they have never seen.
Name the final version in the build request, and have the code compared against that version before pre-production.
Sending the client the pre-production address before looking at the acceptance testing.
The client discovers findings the team would have spotted in ten minutes, and loses confidence in the rest of the project.
Do the internal acceptance testing first, approve the findings on screen, then send the address yourself with what remains to be finished.
Leaving a share link with “no expiry” on the mock-up after approval.
The link stays open to anyone who receives it, forwarded or not, until someone revokes it, while the mock-up contains texts and photos that are not yet public.
Choose 7 days for a validation, and click “Revoke” as soon as the version is validated.
Writing “ok for prod when it's ready” at the start of week 4.
The production request must come from the person at the moment they have seen the final state. Vague permission given in advance bypasses acceptance testing.
Request production after the final acceptance approval, with an explicit, dated sentence: “Put it into production now.”
3 SME situations followed from start to finish: the prompts exactly as they were written, the model answer to aim for, and what was checked before sending.
Example 1
A physiotherapy practice's website, handled single-handedly
Bastien is a freelance developer in Talence. A physiotherapy practice with three practitioners commissions a one-page site from him, with opening hours, specialities and an appointment booking link. He works alone with an agent and wants to deliver in ten working days.
One page, from meeting to website
1Meeting notes
Attached to the project record.
2Five tasks
Proposed by the agent, created after approval.
3Final mock-up
The code is built from it only once it is approved.
4Pre-production
Checked in the preview and on a real phone.
5Production
Requested by Bastien after the practice's written approval.
Request 1
Project [project name], no repository for now. Read the notes from my meeting uploaded to the record. Propose five tasks at most for a one-page site: title, hours, planned branch, due date before [date]. Add the information missing to get started. Do not create anything before I approve.
Model answer
1. Design the page mock-up (Studio), 4 h, branch design/page-unique
2. Build the page from the final mock-up, 6 h, branch feat/page-unique
3. Add the appointment booking link, 1 h, branch feat/rendez-vous
4. Write the legal notice and the privacy page, 2 h, branch feat/legal
5. Prepare go-live and monitoring, 2 h, branch chore/mise-en-ligne
Missing information: the booking link address, the exact opening hours, photos of the practice, the domain name and its registrar.
Bastien replies “yes” and sends the four questions to the practice. He splits task 4 in two: the privacy page is waiting for the list of tools actually used.
Request 2
The mock-up is at final version. Build it on the feat/page-unique branch, using the project's tokens. Check it in the preview at all three sizes and in real browsers with the compare operation on WebKit and Firefox. Return the report, commit, push, then deploy to pre-production.
Model answer
Verification report
Checked: desktop 1280 × 800, tablet 768 × 1024, mobile 375 × 812 opened; status 200; no console errors; no horizontal overflow; WebKit and Firefox comparison with no visible difference.
To check by hand: the appointment link on a real iPhone; how the opening hours display with the actual font on a practice screen.
Commit [tache 4f2c] pushed to feat/page-unique. Pre-production deployed, address checked.
Bastien opens staging on his own phone, finds the booking link too low down, moves it up, then sends the address to the practice.
What was checked before sending
The version: the build starts from the final mock-up, checked in the Studio before the request.
The environment: pre-production first, with the address sent to the client by Bastien himself.
The report: “To check” items rechecked by hand on a real phone, not just in the preview.
The human action: production requested by Bastien after the practice's written “approved”.
Order of magnitude: the site delivered in ten working days with about two days of actual work, instead of four to five days of work for a freelancer on their own.
Example 2
A joinery that wants to show its projects
Aurélie is a project manager at a four-person web agency in Mérignac. A joinery firm with 12 employees wants to replace a five-page site with one that has a gallery of work by type (windows, staircases, fitted interiors). The manager has no Nexus account and mostly replies by phone.
The client's feedback, before and after
On the phone
“The thing at the top, there, bigger”
Remarks noted from memory
An out-of-quote request slipped in on the side
On the share link
Each remark placed on the area
Comments marked “Handled” or “Declined”
Out-of-quote work identified and priced separately
Request 1
Prepare the reply to the joinery’s manager in the thread of his request: the gallery mock-up is ready, and he can comment on it via the link I am going to create. Explain in five lines how to circle an area and leave a comment. Do not send it.
Model answer
Hello,
The mock-up of the work gallery is ready. You can open it using the link below, with no account or password, for seven days.
To comment, click on the spot you have a question about and write your remark: it comes straight to us.
You can also change the screen size to see the page as it would look on a phone.
[share link]
Kind regards,
Aurélie
Aurélie creates the 7-day link herself in the Studio, pastes it in place of the bracket and sends it. She lets the manager know by phone that a link is on its way.
Request 2
The manager left six comments on the mock-up. Sort them into three groups: to handle in this version, to discuss with him, outside the scope of the quote. For each one, say what you propose.
Model answer
To do (3): enlarge the gallery photos on mobile; replace “Our work” with “Our projects”; add the phone number at the top of the page.
To discuss (2): a filter by town (useful if there are more than thirty projects); a workshop video at the top of the page (file size and filming to plan).
Outside the quote (1): a client area to track an order’s progress.
Proposal: a new version with the first three, and a two-line note for the other three.
Aurélie marks comments “Resolved” or “Declined” as she goes and calls the manager about the client area, which she will quote separately.
What was checked before sending
The human action: the share link created by Aurélie, with a 7-day duration, then revoked after approval.
The version: the comments were on the version frozen by the link, not on the work in progress.
The scope: anything outside the quote noted separately, never built in silently.
Order of magnitude: two rounds of mock-up revisions instead of four or five, because the comments arrive pinned to the page rather than dictated over the phone.
Example 3
A campsite in three languages, ready for April
Kevin is a developer at a 10-person studio in Bègles. A seasonal campsite in Lacanau wants its site in French, English and German, live before bookings open in early April. Pre-production must stay closed to search engines.
Three languages before bookings open
Early MarchTwo languages added
Four missing texts listed instead of invented.
Mi-marsTexts received
Built in, pre-production redeployed and rechecked.
28 marsProduction requested
After checking the exclusion directive.
29 marsIndexing checked
Public pages readable by search engines.
Request 1
Current task: [task title]. The site exists in French on the main branch. Add English and German from the client-approved texts uploaded to the Studio. No translations of your own: if a text is missing, list it. Check that pre-production does send a no-index instruction to search engines. Push, deploy to pre-production, write the report.
Model answer
What to expect: both languages built in, a list of four missing texts (cancellation terms in German, two photo captions, the Access page in English), a report showing the exclusion tag present on staging, and the deployment logged in the register.
Kevin sends the campsite the list of missing texts and blocks the production release until they have arrived.
Request 2
The missing texts are in the Studio. Build them in. Then check that the search engine exclusion directive exists ONLY on pre-production and not in the production configuration. Tell me exactly which file contains it.
Model answer
What to expect: the four texts built in, then the answer that the exclusion directive depends on an environment variable specific to staging, with the name of the file that reads it, and proof that it is absent from the production target.
Kevin checks the file himself, then requests the production release on 28 March. The next day, he checks in Radar SEO that the pages are indexable.
What was checked before sending
The environment: pre-production closed to search engines, production open, checked in the file rather than taken on trust.
The texts: no invented translations, each language taken from the texts approved by the client.
The human action: production requested by Kevin, after all the texts have been delivered.
Order of magnitude: one day to add two languages and check them, instead of three, and no site indexed by mistake in a provisional state.
On Monday, Malik merged and pushed the five branches of the wine merchant’s site. Pre-production has not been deployed yet. On Wednesday, Claire runs her acceptance test and records four findings: 1. on mobile, the menu covers the home page title; 2. the contact form displays “Thank you” but no e-mail arrives in the E-mails tab; 3. the photo of the wine cellar is the dark version Sandrine had rejected; 4. on tablet, the footer overflows on the right. Sandrine wants to see the site on Thursday. Write the week’s requests and say, for each point in time, what Claire checks and what only she can do.
Write the request to deploy to staging.
For each of the four findings, say what the agent must read (screenshot, format, console) and where the cause probably lies.
Write the request that has the findings handled one by one.
Say how Claire approves each finding, and what she sends Sandrine on Thursday.
See the answers
Deploy to staging
The site's branches are merged and pushed. Deploy to pre-production with the repository's recipe. After deployment, open the pre-production address in the preview at all three sizes and return your report: HTTP status, console errors, horizontal overflow. Do not touch production.
Roughly what you should get
What to expect: the deployment logged in the register with its commit and the note “by an agent”, the output visible in the Terminal, the address checked, then the preview report that separates “Checked” and “To verify”.
The four findings, read before being fixed
Finding
What the agent reads
Likely cause
1. Menu over the title (mobile)
Screenshot and 375 × 812 format
Fixed banner height not offset
2. No e-mail
Console and Emails tab
Recipient address missing from the staging .env
3. Dark photo
The final version of the mock-up
Image from an earlier version, not the final one
4. Footer (tablet)
Screenshot and 768 × 1024 format
Fixed width on a footer block
Work through the acceptance test, finding by finding
Read Claire’s acceptance test on pre-production. Deal with the findings one by one, in numerical order. For each one: read the screenshot, the screen format and the console, fix it on the [branch name] branch, check it in the preview at the same format, then mark the finding as resolved, saying in one sentence what you changed. For finding 2, if a value is missing from the .env, tell me which one without displaying it. Redeploy to pre-production once all four are resolved.
Roughly what you should get
What to expect: four findings moved to “resolved”, one at a time, each with its note (“fixed banner offset by a top margin on the page”, “image replaced with the one from the final version”…), then a new deployment to staging.
Claire opens staging at each finding’s format and only validates what she can see has been fixed. Finding 2 is validated by submitting the form herself and looking at the captured e-mail. On Thursday, she sends Sandrine the staging address: she writes it herself, not the agent. Production will wait for Sandrine’s reply and Claire’s explicit request.
Practise
Three more exercises, from the most guided to the most demanding. The material is provided in full: copy it into your tool, then check your work against the criteria before opening the answers.
Level 1 · guided10 min
Give each step back its human action
Here are ten actions from the wine merchant’s project. For each one, say whether the agent does it alone (you review), prepares it for a person to confirm, or whether only a person can do it. Name the person where that is the case.
The material to work on
1. Create the site tasks after Claire has said “yes” to the breakdown.
2. Move the home page mock-up to final version.
3. Generate the development .env from the vault.
4. Create the mock-up share link for Sandrine.
5. Deploy to staging after Malik’s push.
6. Validate finding 2 of the acceptance testing.
7. Put the site into production.
8. Write the reply to Sandrine in her request’s thread.
9. Send the first month’s maintenance report.
10. Remove a former intern’s access to the vault.
Check your work
Actions 2, 4, 6, 7 and 10 are handed back to a named person
Actions 8 and 9 are prepared by the agent and confirmed by a person
Actions 1, 3 and 5 are done by the agent, with a review
Action 7 states that it goes ahead at Claire's request, never on the agent's initiative
See the answers
Action
Who
Why
1, 3, 5
The agent, Claire or Malik reviews
Create after approval, generate without displaying, deploy after push
2
Inès
Approving a design is a human action
4
Inès or Claire
Creating a link to the outside world remains the person's job
6
Claire
Only the person who recorded the finding approves it
7
Claire, then the agent
The agent deploys only when Claire requests it
8, 9
The agent prepares, Claire sends
Nothing goes to the client without her
10
Claire, administrator
An agent cannot delete an access: the server refuses
The request that leaves the action to Claire
Prepare the reply to Sandrine in the thread of her request: pre-production is ready, here is the address [pre-production address], go-live is planned for [date] if she approves by then. Leave the reply as a draft; I will review and send it.
Roughly what you should get
What to expect: a six-line draft in the thread, pending, with the address and the date. Nothing is sent.
Level 2 · independent20 min
Write the week 1 requests
Here is the e-mail Sandrine uploaded to the portal. Write the two requests Claire sends the agent in the first week: the first to break the work down into tasks, the second to prepare the reply to Sandrine with the questions to ask her. Specify what Claire checks before saying “yes”.
The material to work on
Subject: new website
Dear Claire,
As agreed on the phone, we would like a new website before the festive season. The current one dates from 2015; it is very slow and unreadable on a phone. We need: a page about the estate and its history, a page about our wines (without prices, which we give to trade customers on request), a Visits and tastings page with opening times, and a contact form that reaches both me and Benoît, our cellar master. The photos of the cellars will be ready on 10 October. We would like to keep the addresses of the pages that perform well on Google. Could you tell me what you need from us?
Kind regards,
Sandrine
Check your work
The first request gives the pages, the dates and the constraints (no prices, two recipients, addresses to keep)
She asks for the planned branches and forbids creating anything before approval
The second request stays a draft that Claire sends herself
The questions cover the photos, the addresses to keep and the form's recipients
Claire checks the hours, the assignees and the deadline before saying “yes”
See the answers
Break down the work
Read Sandrine’s request in the portal. Propose the tasks for the brochure site: the estate and its history, wines with no prices at all, visits and tastings with opening times, a contact form sending to two recipients read from the .env, carrying over the existing page addresses. For each task: a title starting with a verb, priority, hours, assignee (Inès design, Malik code, Théo copy and SEO), due date, planned branch. The photos arrive on 10 October: schedule the tasks that depend on them after that. Do not create anything before my “yes”.
Roughly what you should get
What to expect: around ten tasks, including a task “Record the old site’s URLs and their rankings” assigned to Théo, and the gallery tasks scheduled after 10 October.
Prepare the reply to Sandrine
In the thread of Sandrine’s request, prepare a reply of ten lines at most: what we are starting this week, and the questions we need answered. Questions: the e-mail addresses of the form’s two recipients, visiting hours by season, access to the old site’s Search Console, the name of the domain registrar. Leave the reply as a draft.
Roughly what you should get
What to expect: a draft in the thread, four numbered questions, no promise of a go-live date that Claire hasn’t given.
Before saying “yes”, Claire checks three things: the total hours against the signed quote, that nobody is assigned to a task falling during their holiday, and that carrying over the URLs really exists as a task. That is what saves the old site’s search rankings.
Level 3 · demanding case35 min
Untangle a week 4 that went wrong
Here is an extract from the week 4 log of another of the studio’s projects, a website for a wine cooperative. Identify every method error, link each one to the step in the journey and the human action concerned, then write the three requests that would have avoided the problem.
The material to work on
PROJECT LOG, WEEK 4
Monday 9.12am: Malik's session, branch feat/accueil. Commit “accueil ok” (no task reference).
Monday 9.40am: the home page mock-up moves from 01.00.07 (final) to 01.00.08 (draft, requested by Théo as a trial).
Monday 10.05am: home page built from 01.00.08.
Monday 4.30pm: push to feat/accueil. No merge request.
Tuesday 11am: deployment to the production target requested by a session, without a written request from Claire. Refused: code not merged.
Tuesday 11.20am: deployment to pre-production from feat/accueil, working tree modified.
Wednesday 3pm: Claire's acceptance testing, 5 findings.
Wednesday 5pm: all 5 findings marked “handled” by the agent in one go.
Wednesday 5.05pm: Claire marks the 5 findings approved from her phone, without opening pre-production.
Thursday 9am: the client reports that the home page headline is not the one they approved.
Check your work
You identify the build done from a non-final version
You identify the production request made without Claire asking, and the deployment from a modified working tree
You flag the findings handled in bulk and approved without being looked at
You flag the commit with no task reference
Your three requests restore the final version, a clean pre-production and finding-by-finding acceptance testing
See the answers
The mistakes in the log
Moment
Mistake
Stage and human action
Monday 10:05am
Build from 01.00.08, a draft
Design: only the final version is authoritative
Monday 9:12am
Commit without [tache ]
Code: the task can no longer find its work
Tuesday 11am
Production attempted without a request
Production: an action reserved for Claire’s request
Tuesday 11:20am
Pre-production from a modified working tree
Pre-production: clean, pushed repository
Wednesday 5pm
Five findings resolved in a batch
Acceptance testing: one finding at a time, with its note
Wednesday 5:05pm
Approval without looking
Acceptance testing: the person approves after seeing
Go back to the final version
Compare the home page on the feat/accueil branch with the final version 01.00.07 of the mock-up in the Studio. List every discrepancy (text, colours, spacing). Fix them to match the final version, commit with the task reference, push and open the merge request. Do not deploy.
Roughly what you should get
What to expect: a list of discrepancies, including the home page title, then a “[tache …]” commit pushed and the merge request link.
Redo pre-production and acceptance testing properly
When the merge request has been merged, deploy to pre-production from a clean, pushed repository. Then go back to Claire’s acceptance test: one finding at a time, screenshot, format and console read, fix checked in the preview at the same format, finding marked resolved with its note before moving on to the next.
Roughly what you should get
What to expect: a deployment logged in the register with its commit, then five findings moved to “resolved” one by one, each with its note.
The third fix is not something you ask the agent for: Claire reopens each finding on a computer, at the size where it was raised, before approving. Approving from a phone a finding raised on desktop proves nothing.
Every request to the project agent written in the course, including model answers, worked examples and practice exercises, sorted by module and lesson, with filters to find the right one.
For each lesson, the main exercise and the three graded practice exercises with their materials, to do on paper or alongside Nexus; all model answers are gathered at the end.
The course’s worked examples, from the first project to production: the situation, the request as it was written, the agent’s typical answer and what was checked before approving.
All the lessons in a single PDF: objectives, written course with its diagrams, tables and requests, common mistakes, exercise and key takeaways. The practice exercises and answers are in the workbook, the examples in the collection.
Your notes stay on this device; they are not sent anywhere.
A question for the tutor
A result that doesn’t match the model answer, a prompt that gets you nowhere, a case specific to your business: write to us with your prompt and the response you got. A Bonbay Académie trainer replies within 24 working hours, on your case.