Lesson 49, module 12: Case studies from A to Z Case study: answering a public tender from A to Z A 90-page tender pack and four weeks: where do you start?
A landscaping company in Cenon is going for lot 2 from a neighbouring town. 14 parks and squares, about 9 hectares Price 40%, technical merit 60% Submission by Friday 11 December, 12 noon The bid, from notice to submission. [Diagram: The bid, from notice to submission] Monday 16 November: Read and decide Tuesday 24 November: Visit the sites Monday 30 November: Ask the questions Thursday 3 December: First draft of the technical proposal Tuesday 8 December: Review and price Thursday 10 December: Submit Four weeks between spotting the notice and the deadline: the backward plan is done on day one. First prompt: the summary sheet, page by page. Prompt: Here are the tender rules and the technical specifications. Make the summary sheet: dates, documents to provide, criteria. For each piece of information, give the page. Response: A sheet under four headings, each line followed by its page: submission on 11 December at 12 noon (p. 4), questions before 1 December (p. 5), technical proposal of 15 pages max (p. 7). Bid or pass: the decision is made before writing. [Diagram: Bid or pass] Vertical axis, bidding effort; horizontal axis, chances of winning. Pass Bid if the schedule allows Don't spread yourself thin Focus here: Bid Each lot goes into the matrix before any writing. The box is decided with the manager, not with ChatGPT. The technical proposal follows the criteria, in the same order and with the same words. [Diagram: The proposal mirroring the criteria] 1. Methodology and organisation (30%) 2. Staff and equipment (20%) 3. Environmental approach (10%) Appendices One section per sub-criterion of the tender rules, in the same order and with the same words. What ChatGPT never does in this bid. Set a price Invent a resource or a reference Sign and submit the bid Exercise: write the environmental section, then reread it as the buyer would.
Your turn: The environmental section of the proposal The written lesson, the corrected exercise and the quiz are below the video.
Lesson 49 of 54 · module 12, case studies from a to z
Case study: responding to a public tender from start to finish
A public tender is won by reading the consultation rules carefully and by a technical proposal that answers criterion by criterion. ChatGPT helps you summarise the tender documents, spot ambiguities, build the outline and write from your notes. Prices, commitments, signature and submission remain the company’s responsibility.
34 min of reading
1 min 51 of video
6 diagrams
9 demandes to copy
3 exemples pratiques
4 exercices answerss
5 questions
2 ressources
By the end of this lesson, you will know how to
Turn a tender pack into a summary sheet checked page by page
Build and write a technical proposal that mirrors the award criteria
Check every commitment in the technical proposal and its consistency with the prices before submission
What’s covered
The starting point
The bid, step by step
Time spent, before and with ChatGPT
3 worked examples, followed from start to finish
Exercise with answers · The environmental section of the technical proposal
3 practice exercises, from guided to demanding cases
The quiz
Key points
The consultation rules are authoritative: every date, document and criterion can be checked on the page cited.
The technical proposal follows the sub-criteria, in their order and in their words.
ChatGPT drafts from your site notes; it does not invent resources, references or deadlines.
Prices, commitments, signing and submission stay with the company.
Submit the day before, and keep the acknowledgement of receipt.
Responding to a public tender takes hours of reading and writing, and complete rigour: one missing document, one misread date or one off-topic technical proposal is enough to rule a bid out. ChatGPT is a great help with the reading and the writing, and it can also lose you a contract if it invents a resource, a deadline or a rule. This case follows a complete response, from finding the notice to submitting the bid.
The starting point
The company is a 22-employee landscaper based in Cenon, on the right bank of Bordeaux: designing and maintaining green spaces for private clients, residential buildings and a few local authorities. Laurent, the manager, makes the decisions and does the pricing. Mathieu, team leader, knows the ground and the equipment. Sophie, administrative and sales assistant, puts the bids together. On Monday 16 November 2026, Sophie’s monitoring alert flags a notice published by a neighbouring municipality: maintenance of its green spaces, in three lots.
Extract from the notice Subject: maintenance of the municipality’s green spaces. Lot 1: verges and ditches. Lot 2: parks and public gardens (14 sites, approximately 9 hectares). Lot 3: school green spaces. Duration: one year from 1 February 2027, renewable three times for one-year periods. Tender documents downloadable from the municipality’s buyer profile. Deadline for submission of bids: Friday 11 December 2026 at 12pm, electronically only.
What the rules of the consultation for this tender say (extract)
Section
Content
Page
Site visits
Recommended, by appointment with the technical services, before Friday 27 November
p. 4
Questions
On the buyer profile by Tuesday 1 December at the latest; answers published until Friday 4 December
p. 5
Application
DC1 and DC2 forms or ESPD (DUME), public liability insurance certificate, references from the last three years, staff and equipment
p. 6
Offer
Tender form, schedule of unit prices, estimated bill of quantities, technical proposal of no more than 15 pages
p. 7
Award criteria
Price 40%; technical merit 60%, of which methodology and organisation 30%, human and material resources 20%, environmental approach 10%
p. 8
Bid validity
120 days from the submission deadline
p. 9
Mathieu’s notes after the site visit on 24 November Team for lot 2: me as team leader plus three operatives, two of them trained in light pruning. Cover: a back-up team based in Cenon. Equipment: two ride-on mowers, a front-cut mower for embankments, six brush cutters and four battery blowers, two tipper trucks, a shredder. We haven’t used any plant protection products for years: mechanical and thermal weeding. Green waste shredded on site to mulch flower beds where possible, otherwise taken to a composting site. Central park: damaged lawns near the play area. Town hall square: flower beds, watch out for the calendar of ceremonies. Two sites with no mowing frequency given in the CCTP (technical specifications).
The bid, step by step
The bid, from notice to submission
Monday 16 NovemberRead and decide
Summary sheet of the tender documents, then a decision to bid for lot 2 only.
Tuesday 24 NovemberVisit the sites
Mathieu visits the fourteen parks and gardens, taking photos and notes.
Monday 30 NovemberAsk the questions
Two questions submitted on the buyer profile, before the 1 December deadline.
Thursday 3 DecemberFirst draft of the technical proposal
The outline mapped to the criteria, then each section from the field notes.
Tuesday 8 DecemberReview and price
Review against the criteria grid; Laurent sets the prices.
Thursday 10 DecemberSubmit
Submitted the day before the deadline, acknowledgement of receipt kept.
Four weeks between spotting the notice and the deadline: the reverse schedule is drawn up on day one.
Step 1, the summary sheet of the tender documents
Role: you are a bid writer at a landscaping company with 22 employees.
Context: I am attaching the consultation rules (règlement de la consultation) and the specific technical specifications (CCTP) for a public tender for green space maintenance. We are bidding for lot 2, parks and public gardens.
Task: write the tender summary sheet for the managing director.
Format: four sections. 1. The dates (site visit, questions, bid submission, contract start). 2. The documents required for the application and the bid, as a checklist. 3. The award criteria and their weighting, word for word. 4. The technical requirements for lot 2 that call for a precise answer in the technical proposal. For each line, give the page and the document where you found it. If a piece of information is not there, write “not found”; do not infer anything.
Roughly what you should get
A sheet of around two pages, each line followed by its reference (“RC p. 8”, “CCTP p. 12”). The criteria copied as they are, a dozen technical requirements, and a few “not found”, for example on the mowing frequency for two sites.
Check: Sophie opens the tender rules at every page cited and finds each date and each document; she corrects one wrong page. Decision: the sheet becomes the bid checklist, printed and ticked off until submission.Open a Project for the tender
In the left-hand column, click “Projects”, then “New project”.
Name it after the town and the subject, for example “Grounds maintenance, lot 2”.
Add the tender documents to the project: rules of the consultation, technical specifications, blank price schedule.
In the project instructions, write: “For any statement about the tender, cite the document and the page. Do not set any price.”
Open one conversation per step: summary, questions, outline, each part of the technical proposal, review.
The wording may vary slightly by version. The tender documents are public: you can attach them without precautions. The technical proposal, however, contains your expertise and resources: work in an account set not to train the models, or a Business account. The completed price schedule never goes through ChatGPT.
Step 2, decide whether to bid and for which lot
Role: you are helping the manager of a 22-employee landscaping company decide whether to respond to a tender.
Context: here is the approved summary sheet: [paste the sheet]. Our company: 22 employees, based in Cenon, 10 minutes from the municipality; three public maintenance contracts under way (a municipality in the Médoc, a social housing landlord’s estate in Lormont, a secondary school); no experience of verges and ditches; no roadside mowing equipment.
Task: for each of the three lots, list what counts for and against bidding, then the questions the manager has to decide.
Format: a table (lot; for; against), then no more than five questions. Do not reach the conclusion for him.
Roughly what you should get
A table of three lines: lot 1 requires equipment the company doesn’t have, lot 2 matches the references, lot 3 is close but requires work outside school hours. Then four or five questions: the team’s capacity in February, the December workload to put the bid together, the value of lot 3.
Check: Laurent rereads the three references and confirms they are less than three years old, as the tender rules require. Decision: he puts lot 2 in the “Respond” box of the matrix, lets lot 1 go and drops lot 3 so as not to stretch the team in December.Bid, or let it go
HeavyResponse effortReasonable
Let it through
A lot of work for little chance: a lot outside your trade or your area.
Respond if the schedule allows
A lot within your reach, but a heavy bid to put together.
Not getting sidetracked
A small lot far from your track record: a quick response, with no real hope.
Reply
Lot 2: your trade, your area, similar references.
WeakChances of winningActual
Each lot is placed in the matrix before any writing. The box is decided with the managing director, not with ChatGPT.
Step 3, spot ambiguities and ask questions
Role: you are a bid writer reviewing technical specifications before pricing.
Context: the project files contain the technical specifications and the lot 2 schedule of prices. Here are also our team leader’s site visit notes: [paste the notes].
Task: identify the points that prevent safe pricing or writing: missing information, contradictions between the two documents, vague requirements. Then draft the questions to ask the buyer.
Format: a table (point; document and page; why it hinders pricing), then the questions, one sentence each, neutral, without revealing our method or our prices. Only list points you can cite with their page.
Roughly what you should get
A table of four to six points, each cited with its page: two sites with no mowing frequency, removal of green waste not assigned, a discrepancy between the annual number of prunings in the specification and in the bill of quantities. Then three to five short questions.
Check: Sophie checks each point in the document cited; one does not exist, as ChatGPT had mixed up two sites, and it is removed. Decision: Laurent keeps two questions, submitted on the buyer profile on Monday 30 November; the answers published on 3 December are added to the project files.
Step 4, the outline of the technical proposal
Role: you are a bid writer.
Context: the consultation rules (project file, page 8) assess technical merit on three sub-criteria: methodology and organisation of the work (30%), staff and equipment assigned (20%), environmental approach (10%). The technical proposal is 15 pages at most. Here are the technical requirements identified in the summary sheet: [paste section 4].
Task: propose the detailed outline of the technical proposal.
Format: one part per sub-criterion, in the order of the rules and using their exact words as headings. Under each part, the subsections, the technical requirement each one addresses, and a page count proportionate to the weighting. Then the list of appendices. Do not write anything yet.
Roughly what you should get
An outline of three parts titled after the sub-criteria, seven pages for methodology, five for resources, three for the environment, each subsection linked to a requirement. A list of appendices: references, annual schedule, equipment data sheets.
Check: every requirement in section 4 appears in at least one subsection. Decision: Laurent adds a subsection on the town hall garden and ceremonies, which Mathieu spotted during the site visit.The technical proposal mapped to the criteria
1. Methodology and organisation (30%)
The schedule of work by site, differentiated management, monitoring and reports.
2. Human and material resources (20%)
The team assigned to the lot, its skills, the named equipment, cover in case of absence.
3. Environmental approach (10%)
Chemical-free weeding, battery-powered equipment, what happens to green waste.
Appendices
References, the annual schedule, equipment data sheets, within the set page limit.
One section per sub-criterion in the consultation rules, in the same order and using the same words.
Step 5, write a section from the site notes
Role: you are a bid writer at a landscaping company. You are writing for a public buyer who compares several bids against a grid.
Context: here is the approved outline of the technical proposal: [paste the outline]. Here are our team leader’s notes, the only source of facts: [paste Mathieu’s notes].
Task: write part 2, “Staff and equipment assigned”.
Format: three pages at most, headings and subheadings from the outline, short sentences, an equipment table (equipment; quantity; use on lot 2). Every resource mentioned comes from the notes. If useful information is missing (age of equipment, team working hours), write [to be completed] rather than inventing it. No quantified commitment that is not in the notes.
Roughly what you should get
Three pages: the assigned team (a team leader and three operatives, two trained in light pruning), cover by the Cenon back-up team, a seven-line equipment table, and three or four [to be completed].
Check: Mathieu checks each line of the table against the equipment fleet and fills in the [to be completed] items. Decision: the section is approved; one sentence added by ChatGPT, “emergency call-out within two hours”, is deleted, as nobody decided it.
Step 6, review the proposal as the buyer would
Role: you are a technical services officer at a local council, scoring bids for a grounds maintenance contract.
Context: technical merit is assessed on three sub-criteria: methodology and organisation (30%), staff and equipment (20%), environmental approach (10%). Here is a bidder’s technical proposal: [attach the proposal].
Task: review it against this grid. For each sub-criterion, say what is convincing, what is missing and what remains vague.
Format: a table (sub-criterion; strengths; gaps; vague sentences quoted in inverted commas). Then the three corrections that would gain the most points. Do not rewrite the proposal.
Roughly what you should get
A table of three lines with precise quotations, then three corrections, for example: an annual schedule per site is missing; the environmental approach doesn’t say what happens to green waste that isn’t shredded; “particular attention” says nothing.
Check: Sophie checks that each gap identified matches a requirement of the tender documents, not a ChatGPT preference. Decision: section 3 is completed with the composting platform, and the annual schedule is added as an appendix.
Step 7, the consistency check before submission
Role: you are responsible for quality control of tender responses.
Context: here are the final technical proposal and the bid summary sheet. The manager priced the bill of quantities himself; I am only giving you his assumptions, without any prices: a team of four, twenty-eight mowings a year on the large parks, two hedge trims a year.
Task: check the consistency between the technical proposal, the pricing assumptions and the summary sheet.
Format: a list of inconsistencies, each with the sentence from the technical proposal in question and the element it contradicts. Then the checklist of documents on the sheet, each marked “in the technical proposal” or “outside the technical proposal, to be checked”.
Roughly what you should get
Two or three inconsistencies, for example: the technical proposal promises three hedge trims a year when the costing allows for two. Then the list of documents, almost all marked “outside the technical proposal, to be checked”: these are checked in the submission file.
Check: Laurent rules on every inconsistency; the technical proposal is aligned with the costing, never the other way round without his agreement. Decision: submitted on Thursday 10 December at 4pm, the day before the deadline, with the signatures required by the tender rules; the buyer profile’s acknowledgement of receipt is saved in the file.
Time spent, before and with ChatGPT
Orders of magnitude for this bid, reviews and checks included
Step
Before
With ChatGPT
Read the file and write the summary sheet
2 h
45 min
Decide to respond
45 min
20 min
Ambiguities and questions
1 h
30 min
Technical proposal outline
1 h
15 min
Writing the technical proposal, three parts
8 h
3 h 30
Review against the criteria grid
1 h 30
45 min
Consistency, documents and submission
2 h
1 h 30
Total
environ 16 h
environ 7 h 30
These times are orders of magnitude, and they do not include the site visit, Laurent’s costing or the preparation of the administrative documents, which do not change. The surest gain lies elsewhere: with a summary sheet referenced page by page and a technical proposal that mirrors the criteria, the company no longer loses marks on presentation. The part the buyer will read most closely is still the one Mathieu fed with his field notes.
Mistakes to avoid
Asking ChatGPT to fill in the price schedule or suggest a “competitive” price.
It knows neither your hourly costs, nor your output rates, nor your margins. A plausible price may be too high to win or too low to live on for the four years of the contract.
Cost it from your own times and costs, in your spreadsheet. ChatGPT can only check consistency between the technical proposal and your assumptions, without seeing a single price.
Take a standard company technical proposal and have it “adapted” to the tender.
The text keeps the structure of the old contract, its resources and sometimes the name of the previous buyer. The buyer looks for their criteria and can’t find them.
First build the outline on the sub-criteria in the tender rules, then write each section from the notes on the current tender. The old proposal is an example of tone, not a base.
Letting through commitments nobody has decided on: a response time, a label, monthly reports.
ChatGPT adds them to make the text convincing. Once the contract is signed, they bind the company for its entire term.
Underline every figure and every verb in the future tense, and have the list approved by the manager. The prompt specifies: “no commitment that is not in the notes”.
Rely on the dates in the summary without rereading the tender rules, and submit on the last day.
A time copied wrongly, a mandatory site visit missed or a slow platform on the last morning is enough to get the bid rejected, with no appeal.
Demand the page for every piece of information, check it, and aim to submit the day before the deadline. Keep the acknowledgement of receipt.
3 SME situations followed from start to finish: the prompts exactly as they were written, the model answer to aim for, and what was checked before sending.
Example 1
An office cleaning contract in Béarn
Karine is sales manager at a 60-employee cleaning company in Pau. A community of municipalities has issued a tender for cleaning six buildings. She wants a summary sheet the same day, then a first draft of the section on team organisation.
Karine’s first day
1Summary
Dates, documents, criteria, requirements, page by page.
2Verification
Every page opened, the mandatory site visit spotted.
3Site visit
Notes taken on the six buildings.
4Part one
Team organisation, based on the notes.
Request 1
You are head of tender responses at a cleaning company with 60 employees. I am attaching the consultation rules and the technical specifications for a contract to clean six public buildings. Produce the summary sheet: dates, documents to provide, criteria and weighting word for word, technical requirements to address in the technical proposal. For each line, the document and the page. “Not found” if the information is missing.
Model answer
Summary sheet, cleaning of six buildings
1. Dates: mandatory site visit before [date] (RC p. 3); questions until [date] (RC p. 4); bid submission on [date] at [time] (RC p. 4); start of services: not found.
2. Documents: application as per RC p. 5 (application forms, insurance certificate, references); bid as per RC p. 6 (contract form, price breakdown, technical proposal, site visit certificate).
3. Criteria: “technical merit: 55%”; “price: 45%” (RC p. 7).
4. Requirements: daily visits in four buildings, weekly in two (CCTP p. 9); window cleaning twice a year (CCTP p. 11); eco-labelled products required (CCTP p. 12); working hours outside public opening times (CCTP p. 8).
Karine checks every page and spots that the site visit certificate is a mandatory document: the visit moves to the top of the schedule.
Request 2
Using my site visit notes ([paste the notes]), write the subsection “Team organisation and working hours”: one page, short sentences, one table (building; frequency; time slot; number of staff). Only what is in the notes; otherwise [to be completed].
Model answer
Team organisation and working hours
The six buildings are assigned to a dedicated team of [number] staff, managed by a team leader who visits each site at least once a week. Work takes place outside public opening hours, as required by the technical specifications.
Table: head office, daily, 6am–8.30am, 2 staff; media library, daily, 6.30pm–8pm, 1 staff member; [and the other four buildings, with [to be completed] for two time slots].
In the event of absence, a member of the Pau relief team replaces the absent member of staff from the first day.
Karine fills in the two time slots with the team leader and checks that the floating team really exists under that name.
What was checked before sending
Sources: every page of the summary sheet opened and checked
Facts: the slot table reviewed by the team leader
Commitments: replacement “from day one” confirmed by management before it stays in
A summary sheet in 40 minutes instead of two hours, and a first page of the technical proposal in 20 minutes instead of an hour.
Example 2
Questions for the buyer from a printer in Niort
Thierry runs a 12-employee printing firm in Niort. A département (county council) is tendering for the printing of its communication materials over three years. The price schedule and the technical specification give different quantities, and he cannot price the job.
Costing with or without a question
No questions
A hypothesis picked at random
A price 30% wrong if the page count changes
A bid that is hard to compare
After the question
An answer published for all bidders
A price on the right basis
A bid comparable to the others
Request 1
You are production manager at a printing company with 12 employees. I am attaching the technical specifications and the schedule of prices for a printing contract. Identify the discrepancies between the two documents (quantities, formats, papers, lead times) that prevent pricing. Format: a table (point; what the specifications say, page; what the schedule of prices says, line). Only discrepancies you can quote.
Model answer
Discrepancy table:
1. Quarterly magazine: specification p. 6, 24 pages, 15,000 copies; price schedule line 12, 32 pages, quantity not specified.
2. Poster paper: specification p. 8, recycled paper required; price schedule line 20, coated paper, no further detail.
3. Rush turnaround: specification p. 10, 48 hours; price schedule line 31, “24-hour rush” price.
Thierry finds the three discrepancies in the documents. He keeps only the first two: the third does not stop him pricing the job.
Request 2
Write two questions to the buyer on points 1 and 2. One sentence each, neutral, citing the documents, without saying how we plan to price.
Model answer
Question 1: The technical specifications (page 6) describe a 24-page magazine with a print run of 15,000 copies, whereas the price schedule (line 12) states 32 pages with no quantity: which page count and quantity should be used for pricing?
Question 2: The technical specifications (page 8) require recycled paper for the posters, whereas the price schedule (line 20) mentions coated paper: which paper should be priced?
The two questions go out on the buyer profile three days before the deadline set by the rules.
What was checked before sending
Sources: each discrepancy found at the page and line cited
Tone and audience: neutral questions that reveal nothing about the pricing method
Facts: the deadline for questions checked in the rules
About 30 minutes instead of an hour and a half of line-by-line comparison.
Example 3
A maintenance technical proposal for a social landlord in Limousin
Patrick runs a 9-employee plumbing and heating company in Limoges. A social landlord is tendering for boiler maintenance in 300 homes. He has written his notes on his phone and wants to turn them into the “resources” section of the technical proposal, then have it reviewed.
Patrick’s resources section
Monday eveningNotes
Dictated into the phone on the way back from site.
Tuesday 8amDrafting
One page and a table, with one [to be completed].
Tuesday 8.20amReview
Five gaps seen by the buyer.
Tuesday 9amAdditional information
Cover, tenant absent, Sunday.
Request 1
You handle tender responses for a heating company with 9 employees. Here are my notes: “3 gas-qualified technicians, 1 apprentice, 3 equipped vans, on-call cover Monday to Saturday 8am–7pm, stock of common parts at the workshop, visit-scheduling software, appointments booked with the tenant by text message.” Write the “Human and material resources” section: one page, a table of resources, [to be completed] for anything missing, no commitment that is not in the notes.
Model answer
Staff and equipment
Servicing of the boilers in the 300 homes is carried out by three technicians qualified for gas work, assisted by an apprentice. Each technician has an equipped van and a stock of common parts; additional stock is kept at the Limoges workshop.
Visits are scheduled in dedicated software. Each tenant receives a proposed appointment by text message [notice period to be completed].
An on-call service responds Monday to Saturday, 8am–7pm.
Table: gas-qualified technicians, 3; apprentice, 1; equipped vans, 3; scheduling software, 1; on-call service, Monday to Saturday 8am–7pm.
Patrick fills in the notice period (seven days) and checks that the on-call service is not presented as covering Sundays.
Request 2
Now read this section as the social landlord’s technician who scores the bids would. Say what is missing from his point of view, in no more than five points, without rewriting.
Model answer
1. The number of visits per technician per day is not given: impossible to judge whether three technicians are enough for 300 homes.
2. Nothing on covering for an absent technician.
3. The on-call arrangement doesn’t say what happens on Sundays.
4. How homes where the tenant is absent are handled is not described.
5. No mention of the servicing certificate given to the tenant.
Patrick adds his answers to points 1, 2 and 4; for Sundays, he states clearly that there is no on-call service.
What was checked before sending
Facts: every resource in the table exists in the workshop
Commitments: the on-call service described as it is, with no Sundays
Tone and audience: the review done from the landlord’s technician’s point of view
A page of the technical proposal and its review in 30 minutes instead of an evening.
The environmental section of the technical proposal
Write the request that produces part 3 of the technical proposal, “Environmental approach”, from Mathieu’s notes copied into the lesson and the buyer’s answer published on 3 December: “Green waste is the contractor’s responsibility. Its destination must be specified in the technical proposal.” The part is three pages at most and counts for 10% of the score. Then write the request to review this part against the buyer’s marking grid, and the list of commitments for Laurent to approve.
Pick out from Mathieu’s notes everything related to the environment: weeding, battery-powered equipment, green waste.
Add the buyer’s reply to the context: it requires you to specify where the waste goes.
Write the drafting request with the outline headings, the page limit and the [to be completed] rule.
Write the review request as the buyer, on this sub-criterion only.
Underline every commitment in the resulting text and draw up the list for approval.
Role: you are a bid writer at a landscaping company with 22 employees. You are writing for a public buyer who scores bids against a grid.
Context: the environmental approach accounts for 10% of the score. The only sources of facts: our team leader’s notes ([paste the notes]) and the buyer’s reply of 3 December: “Green waste is the contractor’s responsibility. Its destination must be specified in the technical proposal.”
Task: write part 3 of the technical proposal, “Environmental approach”.
Format: three pages at most, in three subsections: 3.1 Maintenance without plant protection products; 3.2 Battery-powered equipment to limit noise and emissions in the parks; 3.3 What happens to green waste. Short, concrete sentences, in the present tense. For the waste destination, write [name and town of the composting site] to be completed. No label, no figure, no commitment that is not in the notes.
Roughly what you should get
About three pages in three subsections: mechanical and thermal weeding, the six battery-powered brushcutters and four leaf blowers, on-site shredding for mulch and taking the rest to [the facility], with the removal frequency left [to be completed].
The review prompt
You are the technical services officer of a local council, scoring the “environmental approach” sub-criterion (10%) of a parks and gardens maintenance contract. Here is the section from a bidder’s technical proposal: [paste the section]. Say what is convincing, what is missing in light of the answer published on 3 December about green waste, and quote every vague sentence. Do not rewrite it.
Roughly what you should get
Five to eight short comments, including at least one on exactly where the green waste goes.
Commitments for Laurent to approve
Written commitment
Why approval is needed
No plant protection products on any of the fourteen sites
True today; the manager confirms he will keep to it for four years
Battery equipment for the brush cutter and the leaf blower
Ride-on mowers aren’t: the sentence must not suggest otherwise
On-site shredding for mulching the beds
Possible on some sites only: the sentence says “where the layout allows”
Remainder taken to a named composting facility
The name, the town and the platform’s consent must exist before submission
Practise
Three more exercises, from the most guided to the most demanding. The material is provided in full: copy it into your tool, then check your work against the criteria before opening the answers.
Level 1 · guided10 min
Extract the dates and criteria from tender rules
Here is an extract from consultation rules. Write the request that turns it into a summary sheet with three sections (dates, documents, criteria), page by page, then check the expected answer below yourself.
The material to work on
Tender rules, interior painting works at two schools
Page 3. Article 4, site visit: a visit to both schools is compulsory. It takes place on Wednesday 25 November 2026 at 2pm. A visit certificate will be issued and must be attached to the bid.
Page 4. Article 6, questions: bidders may submit questions on the buyer profile until Friday 27 November 2026. Answers will be published by Wednesday 2 December 2026 at the latest.
Page 4. Article 7, submission of bids: Tuesday 8 December 2026 at 12pm, electronically.
Page 5. Article 8, content of the bid: acte d’engagement (signed tender form), breakdown of the overall fixed price, technical proposal of no more than 10 pages, visit certificate, provisional works schedule.
Page 6. Article 10, criteria: price 50%; technical merit 40%, assessed on methodology and site organisation in an occupied building (25%) and measures taken for the safety of children and staff (15%); completion time 10%.
Check your work
The prompt requires the page for each piece of information
The mandatory site visit and the visit certificate appear at the top
The five documents in the bid are listed
The criteria are copied word for word, with their weighting
See the answers
The request
You handle tender responses for a painting company. Here is an extract from the consultation rules: [paste the extract]. Produce the summary sheet under three headings: 1. The dates. 2. The documents required for the bid, as a checklist. 3. The criteria and their weighting, word for word. For each line, give the page. Add nothing that is not in the extract.
Roughly what you should get
A half-page sheet in three sections, each line followed by its page.
The expected sheet
Section
Content
Page
Dates
Mandatory visit Wednesday 25/11/2026 at 2pm; questions until 27/11; answers by 02/12 at the latest; submission Tuesday 08/12/2026 at 12pm
pp. 3 and 4
Documents
Tender form; breakdown of the fixed lump-sum price; technical proposal of no more than 10 pages; site visit certificate; provisional schedule
p. 5
Criteria
Price 50%; technical merit 40% (methodology and organisation of works on an occupied site 25%, safety of children and staff 15%); completion time 10%
p. 6
Level 2 · independent20 min
Write the “resources” section without inventing anything
Using the notes below, get the “Human and material resources” section of a technical proposal, two pages at most, with a table, then reread it, underlining each commitment. The contract covers grounds maintenance at three residential estates owned by a social housing landlord.
The material to work on
Team leader’s notes: “Team: 1 team leader + 2 operatives, all three on permanent contracts. 1 ride-on mower, 2 push mowers, 3 battery hedge trimmers, 1 battery leaf blower, 1 tipper truck. Visits every two weeks from April to October, once a month from November to March. Cover: operative from another team. No Saturday work. Green waste collected as we go, taken to a trade waste centre.”
Check your work
The prompt forbids any resource or commitment not in the notes
The table includes the seven lines of equipment and staff, with nothing added
Visit frequencies are correct
Nothing suggests a Saturday call-out
Missing information is marked [to be completed]
See the answers
The corrected request
Role: you write tender responses for a landscaping company. You are writing for the social housing landlord that scores the bids.
Context: contract for the grounds maintenance of three housing estates. Your only source of facts is the team leader’s notes: [paste the notes].
Task: write the “Staff and equipment” section.
Format: two pages at most, short sentences, a table (resource; number; use). Don’t mention any resource, deadline or commitment that is not in the notes. Write [to be completed] for anything missing, such as the operatives’ qualifications.
Roughly what you should get
A page and a half, a seven-row table, one or two [to be completed] notes.
Commitments to highlight: the two visit frequencies, replacement by another team, clearing up as the work goes.
Sentence to correct if it appears: “available six days a week”; the notes say the opposite.
Sentence to remove if it appears: “fully electric equipment”; the ride-on mower and the lorry are not.
Level 3 · demanding case40 min
The full bid of a painting firm in Agen
Redo the lesson’s full file on a different case. A 14-employee painting and floor-covering company in Agen wants to respond to the tender in exercise 1 (interior painting of two schools). Using the rules from exercise 1 and the documents below, produce, in order: a reasoned bid/no-bid decision for the manager, two questions for the buyer, the outline of the technical proposal, the “safety of children and staff” section, a review as the buyer would read it, and the list of commitments to be approved.
The material to work on
Extract from the technical specifications (CCTP):
Page 4. Works take place during the February holidays and on Wednesday afternoons; the schools are in use the rest of the time.
Page 5. Low volatile organic compound emission paints required.
Page 7. Works area marked out and closed at all times; products stored out of children’s reach.
Page 8. Area: 1,450 m² of walls and 620 m² of ceilings.
Extract from the price breakdown: item 3, “ceilings: 540 m²”.
Notes from the manager, Christelle: “14 employees, including 6 painters. We’ve done two nurseries and a secondary school in the last three years. Teams available in February if we push back the clinic job. Water-based, low-emission paints, already used on the nurseries. Site barriers and signs: we have them. Storage: locked van on site. No work on Wednesday afternoons without a team leader present.”
Check your work
The discrepancy between 620 m² (specification, p. 8) and 540 m² (price breakdown, item 3) is raised as a question
The decision to bid depends on rescheduling the clinic job, which only the manager can decide
The outline reuses the two technical sub-criteria and their wording
The safety section contains only measures taken from the notes and the specification
The list of commitments includes a team leader on site on Wednesday afternoons
See the answers
Questions for the buyer
You handle tender responses for a painting company. Here are extracts from the technical specifications and the price breakdown: [paste the extracts]. Identify the discrepancies that prevent pricing, with their page or item, then write one neutral question per discrepancy, citing the documents.
Roughly what you should get
One main discrepancy: 620 m² of ceilings in the specifications (page 8) against 540 m² in item 3. A one-sentence question. Possibly a second one on the Wednesdays concerned.
The safety section of the technical proposal
Role: you are a bid writer at a painting company with 14 employees. You are writing for the municipality that scores the bids.
Context: sub-criterion “measures taken for the safety of children and staff” (15%). Sources: the technical specifications, pages 4, 5 and 7 ([paste]) and the managing director’s notes ([paste]).
Task: write this section.
Format: two pages at most: 1. Marking out and closing off areas; 2. Product storage; 3. Products used; 4. Organisation on Wednesday afternoons. No measure that is absent from the sources; otherwise [to be completed].
Roughly what you should get
Two pages in four subsections, each backed by a page of the specification or a line of the notes.
Commitments for Christelle to approve
Commitment
Question to decide
Works during the February holidays
Has the clinic job really been moved?
A team leader on site every Wednesday afternoon
Which one, and who stands in if they’re absent?
Low-emission paints on all surfaces
Are the product lines available in quantity?
Locked storage van on each site
One van per school, or just one?
The bid decision is put to Christelle as in step 2 of the lesson: what’s in favour (two nurseries and a secondary school, products already mastered), what’s against (a busy February), and the only question that matters: can the clinic job be moved?
5 scenario-based questions. The explanation appears as soon as you answer; the lesson is ticked off in the contents once you reach 80%.
0 answer sur 5
Lesson resources
PDF
The grounds maintenance tender file
The tender rules, the CCTP (technical specifications), the price schedule and the answers to bidders’ questions for a public contract, with the three unclear points to identify.
A two-page policy for your company, to complete in Word: authorised tools, prohibited data, review, disclosure of use, named contact, training and Article 4 of the AI Act.
Every request to copy from the course, including answers, practical examples and practice exercises, arranged by module and lesson, with filters to find the right one.
For each lesson, the main exercise and the three graded practice exercises with their materials, to do on paper or alongside ChatGPT; all the answers are grouped together at the end.
The course’s practical examples, job by job: the situation, the requests as they were written, the standard replies obtained and what was checked before using them.
The use cases from the twelve job-specific lessons in a filterable table: the lesson, the standard request and the data risk level (green, amber, red) with the precaution to take.
All the lessons in a single PDF: objectives, written course with its diagrams, tables and requests, common mistakes, exercise and key takeaways. The practice exercises and answers are in the workbook, the examples in the collection.
Your notes stay on this device; they are not sent anywhere.
A question for the tutor
A result that doesn’t match the model answer, a prompt that gets you nowhere, a case specific to your business: write to us with your prompt and the response you got. A Bonbay Académie trainer replies within 24 working hours, on your case.