Lesson 36, module 10: Other roles Purchasing and logistics: comparing supplier quotes, preparing a negotiation, tracking deliveries Quotes to compare, a price rise to negotiate, a late delivery. Where do you start? Putting the quotes in the same format Preparing the negotiation Tracking and chasing deliveries Unit price isn't enough: compare the total cost on your volume. [Diagram: Three quotes in the same format] 1. The quotes received 2. The names replaced 3. The criteria set 4. The total cost 5. The questions and the choice The table linking A, B and C to the real supplier names stays on your computer. Three quotes attached, suppliers renamed A, B and C. Prompt: You are a buyer. The three attached quotes (A, B, C) are for [product]. Note price, shipping, minimum, lead time, payment, then calculate in code the total cost on [annual volume]. Response: A table criterion by criterion, the quote page under each price, the calculation set out line by line and "not in the quote" when information is missing. Before negotiating, place the purchase: stakes and risk aren't handled the same way. [Diagram: Classifying your purchases before negotiating] Vertically, weight in your spending; horizontally, supply risk. Put out to tender Simple To secure Priority: Strategic A grid commonly used by buyers: the negotiation isn't prepared the same way in each box. The day before the meeting, ChatGPT plays the supplier and you rehearse. A one-page sheet with figures A ten-line role play A review: where you gave ground An order is tracked on set dates, not when stock runs out. [Diagram: Tracking a supplier order] D0: The order D+2: The acknowledgement D-3: The confirmation D-day: Receipt D+1: The follow-up The timings are your organisation's; these are common benchmarks. Your purchase prices, your margins and confidential agreements stay out of the tool. Suppliers renamed A, B, C Calculations redone on a calculator The final choice is yours Exercise: three quotes for shipping boxes for a cannery in the Landes. Your turn: Three quotes for shipping boxes The written lesson, the corrected exercise and the quiz are below the video.
Lesson 36 of 54 · module 10, other roles
Purchasing and logistics: compare supplier offers, prepare a negotiation, track deliveries
An SME buyer spends hours putting quotes into the same format, preparing supplier meetings and chasing deliveries. ChatGPT lines up three quotes in a comparable table, prepares a negotiation with your figures, drafts the chasers and keeps track of delays. The prices, the volumes and the purchasing decision remain yours.
38 min of reading
1 min 50 of video
7 diagrams
6 demandes to copy
3 exemples pratiques
4 exercices answerss
5 questions
1 ressource
By the end of this lesson, you will know how to
Compare three supplier offers on their total annual cost, calculated in code and checked
Prepare an annual negotiation with a costed brief and a role-play before the meeting
Analyse a goods-received export and chase a supplier with figures rather than an impression
What’s covered
Put three offers in the same format
Sort your purchases before negotiating
Prepare an annual negotiation
Track deliveries and chase them up
What stays out of ChatGPT
3 worked examples, followed from start to finish
Exercise with answers · Three quotes for shipping boxes
3 practice exercises, from guided to demanding cases
The quiz
Key points
Quotes are compared on their total cost, calculated in code from your volume and delivery frequency.
Suppliers become A, B and C in ChatGPT; the key stays on your computer.
A negotiation is prepared with your figures and rehearsed in a role-play; your walk-away point stays out of the prompt.
A delay is discussed with rates recalculated in Excel, not with an impression.
Purchase prices, margins and confidential agreements stay out of ChatGPT.
In an SME, purchasing and logistics often come down to one or two people, who also greet drivers, log deliveries and handle disputes with carriers. Time goes on formatting tasks: re-keying three quotes in different formats, digging out the year’s figures to negotiate, chasing an order that hasn’t arrived. That’s where ChatGPT helps. It knows neither your suppliers, nor your prices, nor your stock: it works on what you give it, and it calculates correctly when it runs code.
Purchasing and logistics tasks, the request to use and the check to make
Task
Lesson request
Usual time
With ChatGPT
Check to carry out
Put three offers in the same format
The comparison table
1 h 30
20 min
Every price checked in the original offer
Prepare a tender
The specification and the letter
2 h
30 to 45 min
Quantities checked with the internal user
Prepare an annual negotiation
The negotiation sheet
half a day
1 h
Volumes and amounts taken from the ERP
Rehearse the negotiation
The role play
rarement fait
20 min
The threshold kept out of the request
Analyse delivery delays
The goods-in analysis
1 h
15 min
Two rates recalculated in Excel
Chase a supplier
The dated reminder
15 min
5 min
Order number, quantity, promised date
The times are rough guides for someone used to these requests. The first few times, allow twice as long. A request that works gets saved in a “Purchasing” project or in your request library, then copied and reused by replacing the [square brackets].
Put three offers in the same format
Three quotes in the same format
1The offers received
PDFs, emails, spreadsheets: each in its own format
2Names replaced
Supplier A, B, C in every copy
3The criteria set
Price, carriage, minimum, lead time, payment, validity
4The full cost
Calculated in code from your volume and delivery frequency
5The questions and the choice
Ask the supplier for what is missing; the choice remains yours
The table linking A, B and C to the suppliers’ real names stays on your computer.
Attaching several offers to a single request
Make a copy of each offer and replace the supplier’s name with A, B or C. For a PDF, copy its text into Word, make the replacement, then save that document.
Open a new conversation, or your “Purchasing” project.
Click the + button in the input field, then choose to add files and select the three copies.
Paste the request below and send.
The label may vary slightly depending on the version.
The full-cost comparison table
Role: you are a buyer at a [business activity] SME with [number] employees.
Context: the three attached files are the offers from three suppliers, named A, B and C, for [product or service]. Our need: [annual volume], delivered in [number] deliveries of [quantity] to [delivery location]. Our criteria, in order of importance: [for example total annual cost, lead time, payment terms, minimum order].
Task: from each offer, note the unit price excl. VAT, carriage costs and free-delivery threshold, minimum order, lead time, payment terms, validity period and any price review clause. Then, by running code, calculate the total annual cost of each offer for our volume and delivery frequency. Where information is missing, write “not in the offer”: don’t assume it.
Format: a table (criteria in rows, suppliers in columns) with the offer page for each price, the total cost calculation detailed line by line, then the questions to ask each supplier.
Roughly what you should get
A table of about ten rows and three columns, a calculation set out line by line, “not in the offer” cells and two or three questions per supplier. No final choice: that is yours to make, once the suppliers have replied.
Volume and delivery frequency change everything: without them, ChatGPT compares unit prices, which is exactly what you need to avoid.
Sort your purchases before negotiating
Sort your purchases before negotiating
fortShare of your spendingfaible
To put out to tender
High spend, several possible suppliers: tender, volume, terms.
Strategic
High spend, few suppliers: contract, partnership, contingency plan.
Simple
Low stakes: catalogue, grouped orders, as little time as possible.
To secure
Little money, but a possible shutdown: safety stock, second supplier.
faibleSupply riskfort
A grid commonly used by buyers: negotiation is not prepared the same way in each box.
This grid stops you spending a morning negotiating office supplies while the purchase the whole of production depends on has neither a contract nor a second supplier. Give ChatGPT the list of your purchase categories with their annual spend and the number of possible suppliers, and ask it to place them in the four boxes, justifying each placement. The amounts come from your ERP or accounting software; the risk is something only you know: a fragile supplier, a six-week lead time, a material only two plants produce.
Prepare an annual negotiation
The costed negotiation sheet
Role: you are an experienced buyer preparing an annual negotiation with a supplier.
Context: supplier of [product], [number]-year relationship. Our purchases from them over twelve months: €[amount] excl. VAT for [volume]. They are announcing a [percentage] increase from [date], justified by [their justification, copied from their letter]. Our target: [for example limit the increase to 2%]. What we can offer in return: [for example a twelve-month volume commitment, grouped deliveries]. What we won’t give up: [for example the delivery lead time].
Task: prepare the negotiation sheet: the euro amount of the announced increase and of our target, calculated in code; the questions to make them justify the increase; the trade-offs, ranked from least to most costly for us; the supplier objections to expect and a response to each; an opening line and a closing line.
Format: one page in short sections, with a table of trade-offs (trade-off, cost to us, value to the supplier).
Roughly what you should get
A one-page sheet: two calculated amounts, six to eight questions, a table of three to five trade-offs, four or five objections with their answers. Your walk-away point is not on it: it stays in your head and in your file, not in the prompt.
To discuss an increase justified by energy, materials or transport, look for published indices using web search and open each source. An index quoted without a link has no place in a negotiation.
The role play before the meeting
Role: you play the sales rep for our [product] supplier. You are courteous, you know your brief and you defend your [percentage] increase with the arguments in your letter: [paste the supplier's arguments].
Context: I am the buyer. Here is my negotiation brief: [paste the brief].
Task: play out the negotiation with me, one line at a time, and wait for my reply before continuing. Concede nothing without something in return. After ten exchanges, or when I write “end”, step out of the role.
Format: in the role-play, lines of two or three sentences. After “end”: three moments where I was convincing, the concessions I made without getting anything in return, and the question I didn't ask.
Roughly what you should get
A first line from the “supplier”, an exchange at the pace of your answers, then a review under three headings. The review is the useful part: it shows the concession given away too early, the one you would have made the next day.
Track deliveries and chase them up
Tracking a supplier order
J0The order
Purchase order sent, requested delivery date in writing
J+2The acknowledgement of receipt
Without a confirmed date, a short reminder goes out
J-3The confirmation
Date, time slot and carrier confirmed in writing
MatchdayReceipt
Quantities counted, specific reservations noted on the carrier’s delivery note
J+1Follow-up
Delay, shortage or damage recorded in the supplier log
The deadlines are your organisation’s; these are common benchmarks.
The goods-in analysis by supplier
Role: you are logistics manager and you are analysing our suppliers’ service.
Context: the attached file is the export of our goods receipts over [period], one row per order line. Columns: supplier (coded A, B, C…), order number, promised date, receipt date, quantity ordered, quantity received, reservation on receipt (yes or no).
Task: by running code, calculate for each supplier the number of lines, the share delivered on or before the promised date, the share delivered in full, the average delay in working days of late lines and the number of reservations. Flag lines where a date is missing or looks wrong instead of correcting them.
Format: a table sorted from worst to best, three one-sentence findings, then the list of excluded lines and the reason.
Roughly what you should get
A table with one row per supplier, three findings with figures, a short list of excluded rows. Recalculate two rates in Excel with a filter: if they match, the rest of the table can be used.
Chasing a late order
Role: you are a procurement officer at a [business activity] SME; your tone with this supplier is friendly but firm.
Context: order [number] of [date], [quantity and item], delivery confirmed for [promised date]. Nothing has arrived. Consequence: [for example the packing line stops on Thursday without these boxes].
Task: write the chaser e-mail to the supplier’s customer service team: it restates the order and the confirmed date, asks for a new firm date and the carrier’s tracking number before [time, day], and asks for a partial delivery if the full order isn’t available.
Format: six lines at most, a subject line containing the order number, no threats, signed [first name, job title, direct phone number].
Roughly what you should get
A short e-mail, a subject line that is easy to find in the supplier’s inbox, a dated request. For a delay that stops production, phone first: the e-mail serves as a record.
What stays out of ChatGPT
What a buyer pastes into ChatGPT
No particular precautions
Your specifications, without the customer’s name
The products’ public technical data sheets
Your general terms and conditions of purchase
After replacing the names
The offers received, with suppliers named A, B, C
An export of goods-received tracking, with no contact names
A supplier’s email announcing a price increase
Never
A framework agreement covered by a confidentiality clause
The full history of your purchase prices and margins
Sales reps’ and drivers’ personal contact details
On an individual account, even one set not to train the models, stick to green and amber.
Mistakes to avoid
Comparing offers on unit price, because it is the most visible figure.
Delivery charges, the free-delivery threshold and the minimum order change the real cost; two offers that look very different per carton can cost the same over a year.
Always give the annual volume and the delivery frequency, and ask for the total cost calculated in code, line by line.
Attaching the offers as they are, with the supplier’s name, terms and sales rep’s name.
A supplier’s terms are often a trade secret, sometimes covered by a confidentiality clause, and the sales rep’s name is personal data.
Make one copy per offer, replace the names with A, B, C and keep the key on your computer.
Asking “what price can I get?” or “what is the market price of steel?” without a web search.
ChatGPT knows neither your volumes nor recent prices; it produces a plausible figure, which may be invented or out of date.
Start from your purchase history; for a public index, turn on web search, then open the source before quoting the figure.
Pasting 300 lines of goods receipts into the input field and asking it for delays by supplier.
A table pasted as text is hard to read and gets calculated in the head: rows get skipped, averages are wrong.
Attach the export as .xlsx or .csv, describe the columns, insist on the calculation being done in code and redo two rates with an Excel filter.
3 SME situations followed from start to finish: the prompts exactly as they were written, the model answer to aim for, and what was checked before sending.
Example 1
Élodie prepares to negotiate a 6% increase
Élodie is a buyer at a 60-employee building materials merchant in Libourne. The plasterboard supplier has announced a 6% increase from 1 January, citing energy costs. She has a meeting in ten days and wants to hold the increase to 3%; above 4%, she will approach other manufacturers.
Élodie’s negotiation, day by day
J-10The figures
Twelve months of purchases pulled from the ERP
J-7The sheet
Amounts, questions, benefits in return, objections
J-1The rehearsal
Role-play by keyboard, then in voice mode
MatchdayThe meeting
The printed sheet, threshold at the top
J+1The written confirmation
Rate, effective date and what you get in return
Request 1
Role: you are an experienced buyer at a 60-employee building materials merchant.
Context: plasterboard supplier, eight-year relationship. Our purchases from them over twelve months: €180,000 excl. VAT. They are announcing a 6% increase from 1 January, justified by “the lasting rise in energy costs”. Our target: 3%. What we can offer: a twelve-month volume commitment, deliveries grouped into full articulated lorry loads, payment at 30 days instead of 45. What we won’t give up: delivery within 48 hours to our three depots.
Task: prepare the negotiation sheet: euro amounts of the increase and of the target, calculated in code; questions to make them justify the increase; trade-offs ranked from least to most costly for us; objections to expect, with a response; opening and closing lines.
Format: one page, short sections, a table of trade-offs.
Model answer
Negotiation sheet · plasterboard supplier
1. The amounts (calculated in code)
- Purchases over twelve months: €180,000 excl. VAT
- Announced 6% increase: €10,800 excl. VAT per year
- 3% target: €5,400 excl. VAT per year
- Difference to secure: €5,400 excl. VAT per year
2. Questions to make them justify the increase
- What share of your cost price does energy represent?
- Does the increase apply to the whole range or to certain products?
- Does it apply to orders placed before 1 January and delivered after?
- If energy costs fall, does the price fall? Based on which index?
- Does the same increase apply to all your merchant customers?
3. Concessions, from least to most costly for us
Concession | Cost to us | Benefit to the supplier
Deliveries grouped by articulated lorry | A little more stock in the depots | Less transport, full rounds
Twelve-month volume commitment | Low, stable volume | Visibility for its production
Payment at 30 days instead of 45 | Fifteen days of cash flow | Cash flow
4. Objections to expect
- “All our customers have the same increase”: ask whether the rate and date are the same for everyone, and what it is made up of.
- “Energy costs have gone up”: ask for the energy share of the price and a downward revision clause.
- “It’s group policy”: point to the eight-year relationship and the volume, and offer the concessions.
- “We can’t go below 5%”: concede nothing without something in return; offer volume in exchange for 3%.
5. Opening and closing
- Opening: “We want to keep working together; for that, the increase needs to be explained and shared.”
- Closing: “I suggest we confirm in writing the rate, the effective date and the concessions we have just agreed.”
Élodie keeps the amounts, the questions and the objections. She removes payment at 30 days: the finance director refuses it. She adds a question ChatGPT could not have known about, on the two incomplete deliveries in the autumn.
Request 2
Role: you play the sales rep for this plasterboard supplier. You are courteous, you know your brief and you defend your 6% increase with the argument in your letter: the lasting rise in energy costs.
Context: I am the buyer. Here is my brief: [brief above, without the 30-day payment terms].
Task: play out the negotiation, one line at a time, and wait for my reply. Concede nothing without something in return. When I write “end”, step out of the role.
Format: in the role-play, two or three sentences per line. After “end”: three moments where I was convincing, the concessions I made without getting anything in return, the question I didn't ask.
Model answer
“Hello, thank you for seeing me. I’ll be direct: our energy costs weighed heavily this year, and the 6% we have announced covers only part of them. We are applying the same increase to all our trade customers from 1 January. What is the problem for you in our letter?”
Élodie plays out ten exchanges on the keyboard, then replays them in the evening in voice mode. The second time, she no longer lets “the same increase for everyone” go without asking for the energy share.
Request 3
fin
Model answer
What worked
- You asked for energy’s share of the price before discussing the rate.
- You put the increase in euros (€10,800 excl. VAT per year) rather than talking in percentages.
- You tied the volume commitment to a specific rate, 3%.
What you gave away for nothing
- You accepted the 1 January date without discussing a deferral.
The question you didn’t ask
- Does the increase apply to orders placed in December and delivered in January?
The review gives her the question about December orders, which she adds to her printed sheet.
What was checked before sending
The calculations: 6% and 3% of €180,000 recalculated on a calculator, i.e. €10,800 and €5,400.
The facts: the €180,000 excl. VAT taken from the ERP for the last twelve months, not estimated from memory.
Tone and audience: the opening sentence read aloud, then shortened.
The 4% threshold was kept out of every request.
An hour of preparation and twenty minutes of rehearsal, instead of half a day of preparation and no rehearsal at all.
Example 2
Bastien puts figures on a supplier’s late deliveries
Bastien is logistics manager at a 25-employee agricultural parts distributor in Agen. During the harvest, one supplier ran late again and again, but on the phone it disputes this. Bastien exports the 214 goods-received lines for the third quarter from the ERP, with suppliers coded A to D.
Bastien’s supplier review
Before
“You’re often late”, said over the phone
No figures, the supplier disputes it
Nothing dated, nothing changes
After
29 lines out of 48 on the promised date
The line-by-line details attached to the email
An action plan required within fifteen days
Request 1
Role: you are logistics manager and you are analysing our suppliers’ service.
Context: the attached file is the export of our goods receipts from July to September, 214 lines. Columns: supplier (A, B, C, D), order number, promised date, receipt date, quantity ordered, quantity received, reservation (yes or no).
Task: by running code, calculate for each supplier the number of lines, the share delivered on or before the promised date, the share delivered in full, the average delay in working days of late lines and the number of reservations. Flag lines where a date is missing or looks wrong, without correcting them.
Format: a table sorted from worst to best on punctuality, three one-sentence findings, the list of excluded lines.
Model answer
Supplier | Lines | On the promised date | Complete | Average delay of late lines | Reservations
C | 48 | 29 (60%) | 41 (85%) | 6 working days | 5
A | 71 | 58 (82%) | 66 (93%) | 3 working days | 2
D | 33 | 29 (88%) | 31 (94%) | 2 working days | 0
B | 58 | 54 (93%) | 57 (98%) | 1 working day | 1
Findings
1. C delivers 29 lines out of 48 on the promised date, or 60%; its delays are also the longest.
2. A, which accounts for the most lines, stays below 85% of lines on time.
3. B and D meet their dates; D had no reservations in three months.
Lines excluded: 4. Two with no receipt date, one received before its order date, one duplicate.
Bastien recalculates two rates with a filter in Excel, those for C and B: they match. The line “received before its order date” is a data-entry error at the warehouse; he corrects it in the ERP.
Request 2
Role: you are logistics manager at a distributor of agricultural parts; the tone with this supplier is friendly and direct.
Context: here are supplier C’s figures for the third quarter: 48 lines, 29 on the promised date, average delay of six working days on late lines, five reservations noted on receipt. These delays forced us to postpone deliveries to our customers in the middle of harvest.
Task: write an email to C’s sales manager presenting these figures, asking for an explanation and an action plan within two weeks, and suggesting a phone call.
Format: an email of no more than twelve lines, a subject line containing the main figure, signed Bastien, logistics manager.
Model answer
Subject: Your Q3 deliveries, 29 lines out of 48 on the promised date
Hello,
We have reviewed our deliveries received from July to September. Of the 48 order lines placed with you, 29 arrived on the date you had confirmed; late lines were six working days late on average, and five deliveries were accepted with reservations.
These delays forced us to postpone deliveries to our customers in the middle of the harvest. We value our relationship with you and want to understand what happened.
Could you send us, by [date], an explanation and the measures planned for the current quarter? I suggest a 30-minute call next week: let me know which time suits you.
The details of the 48 lines are attached to this email.
Kind regards,
Bastien
Logistics Manager
[phone]
He attaches the detail of the 48 lines, taken from the ERP with the supplier’s real name: ChatGPT never saw that name.
What was checked before sending
The calculations: two rates redone with an Excel filter, identical to ChatGPT’s.
The facts: the four excluded lines reread one by one, and a data-entry error corrected in the ERP.
Tone and audience: the email read as C’s sales rep, with no personal blame and a dated request.
A quarter of an hour of analysis instead of an hour of filters and pivot tables, and a discussion based on figures the supplier can check.
Example 3
Jérôme gets three offers back in the same format
Jérôme runs a cleaning company with nine employees in Pau. Last year, his three cleaning product suppliers each replied in their own way, and comparing them took him a whole morning. This year, he wants a one-page specification and an identical request-for-quotation letter for all three.
Jérôme’s request for quotation
Last year
Three quotes, three formats
Different quantities from one quote to another
Shipping costs at the bottom of the page
This year
The same quantities for all three
A table filled in by each person, row by row
A comparison in ten minutes
Request 1
Role: you are a buyer for a small cleaning company.
Context: we are nine employees in Pau and we clean offices and shops across the urban area. Here is last year’s consumption, taken from the invoices: concentrated multi-purpose detergent 120 litres, surface disinfectant 80 litres, glass cleaner 60 litres, 50-litre bin bags 6,000, paper hand towels 300 rolls, nitrile gloves sizes M and L 4,000. We want concentrated products with dispensers, the safety data sheet for each chemical product and delivery to our depot once or twice a month.
Task: write a one-page specification for consulting three suppliers, including the response format we require.
Format: five short sections: who we are, the need over twelve months, our requirements, what the offer must contain, the timetable.
Model answer
Request for quotation · cleaning products and consumables
1. Who we are
A nine-employee cleaning company in Pau, maintaining offices and shops across the area.
2. Requirement over twelve months (estimated quantities)
- Concentrated multi-purpose detergent: 120 litres
- Surface disinfectant: 80 litres
- Glass cleaner: 60 litres
- 50-litre bin bags: 6,000
- Paper hand towels: 300 rolls
- Nitrile gloves, sizes M and L: 4,000
3. Our requirements
- Concentrated products, supplied with dispensers
- Safety data sheet for each chemical product
- Delivery to our Pau depot, once or twice a month
4. What your offer must contain
The attached table, completed line by line: proposed reference, pack size, unit price excl. VAT, price for the annual quantity, delivery charges and free-delivery threshold, delivery lead time, payment terms, offer validity period.
5. Timetable
Offer expected by [date]. Our reply on [date]. First deliveries from [date].
Jérôme checks each quantity against last year’s invoices. He adds a line ChatGPT couldn’t have guessed: size S gloves, requested by two employees.
Request 2
Now write the consultation email to accompany these specifications and a blank Excel spreadsheet to be filled in. It goes out identically to the three suppliers. Friendly tone, eight lines at most, signed Jérôme, manager.
Model answer
Subject: Request for quotation, cleaning products, offer due by [date]
Hello,
We are renewing our purchases of cleaning products and consumables for the next twelve months. Please find attached our specification and a table to complete.
So that we can compare offers fairly, please reply in this table, line by line, and attach the safety data sheets for the products you propose.
Your offer is due by [date]. I am available on [phone] if you have any questions.
Kind regards,
Jérôme
Managing Director
He prepares the blank table in Excel himself, with the same columns as section 4, and sends it to the three suppliers on the same day.
What was checked before sending
The facts: each quantity checked against last year’s invoices, one line added.
Tone and audience: the email read as a sales rep who receives ten tenders a week, short and clear about the date.
The blank table uses exactly the columns required in the specification.
An hour to prepare the tender; the comparison that follows takes ten minutes instead of a morning re-keying three offers.
Rémi is purchasing and logistics manager at a 45-employee cannery near Mont-de-Marsan. He buys 12,000 shipping boxes a year, delivered in batches of 3,000, i.e. four deliveries. Three offers have come in. A: €0.62 excl. VAT per box, carriage paid from 3,000 boxes, ten-day lead time, payment at 45 days end of month, minimum order 3,000. B: €0.58 excl. VAT per box, €120 excl. VAT carriage per delivery whatever the quantity, fifteen-day lead time, payment at 30 days, minimum 2,000. C: €0.65 excl. VAT per box, carriage paid, five-day lead time, minimum 1,000, payment at 45 days end of month. The cannery’s storeroom is short of space. Write the request that produces the total-cost comparison table and a reasoned recommendation, then list Rémi’s checks.
Replace the supplier names with A, B and C, and keep the key outside ChatGPT.
Give the annual volume, the delivery frequency and the space constraint.
Require a calculation in code and “not in the offer” for anything missing.
Ask for a recommendation that states what it sacrifices.
Redo the three total costs on a calculator.
See the answers
The trap in this case is the price per box. B is the cheapest per unit, but its shipping costs on every delivery bring it to the same cost as A. And C, the most expensive, is the only one that allows batches of 1,000 boxes, so less space taken up in the warehouse. A request that gives neither the delivery frequency nor the space constraint gets a ranking by unit price, which is wrong for Rémi.
The corrected request
Role: you are a buyer at a 45-employee cannery in the Landes.
Context: we buy 12,000 shipping boxes a year. They currently arrive in batches of 3,000, i.e. four deliveries; our stores are short of space and we would like smaller batches. Three offers: A, €0.62 excl. VAT per box, free delivery from 3,000, ten-day lead time, payment 45 days end of month, minimum 3,000; B, €0.58 excl. VAT, €120 excl. VAT carriage per delivery, fifteen-day lead time, payment at 30 days, minimum 2,000; C, €0.65 excl. VAT, free delivery, five-day lead time, minimum 1,000, payment 45 days end of month.
Task: by running code, calculate the total annual cost of each offer with four deliveries of 3,000, then that of C with twelve deliveries of 1,000. Then compare the offers on lead time, payment and space taken up in the stores. Recommend one offer, stating what it costs extra or what it sacrifices. Add no information that does not appear above.
Format: a table (criteria in rows, offers in columns), the detailed calculation, a five-line recommendation, then three questions to ask the suppliers before signing.
Roughly what you should get
A table of seven or eight rows, three calculations set out, a recommendation that puts a figure on the difference and three questions, for example on a price revision clause or on B’s delivery charges for smaller batches.
Rémi’s checks before passing it on
Inspection
What Rémi checks
The calculations
A: 12,000 × 0.62 = €7,440 excl. VAT. B: 12,000 × 0.58 = €6,960, plus 4 × 120 = €480, i.e. €7,440 excl. VAT. C: 12,000 × 0.65 = €7,800 excl. VAT, carriage paid whatever the number of batches
The gap
C costs €360 excl. VAT more per year than A and B; that is the price of batches of 1,000 and a five-day lead time
The facts
Every price, lead time and minimum checked in the original offer, not in the table
Tone and audience
The recommendation read as the manager would: one figure, one reason, what is sacrificed
Final step: Rémi sends his three suppliers the questions still open, keeps ChatGPT’s answer as a draft memo, and presents the managing director only with figures he has recalculated himself. The choice between €360 more and a less cluttered stockroom is a business decision, not the result of a calculation.
Practise
Three more exercises, from the most guided to the most demanding. The material is provided in full: copy it into your tool, then check your work against the criteria before opening the answers.
Level 1 · guided10 min
Chase a late glazing delivery
Using Sylvie’s notes, write the four-line request that produces the follow-up e-mail to the supplier. Follow the order: role, context, task, format.
The material to work on
Notes by Sylvie, procurement officer at a 40-employee window manufacturer in Bergerac:
- Order no. 24-0871 of 3 November: 18 crates of laminated glazing, supplier B
- Delivery confirmed by e-mail on 5 November for the morning of Thursday 12 November
- On the 12th at 2pm, nothing received, no news
- Without this glass, the glazing workshop stops on the morning of Monday 16th
- A partial delivery of 6 crates would be enough to keep going until Wednesday 18th
- Good relationship with this supplier: this is its first late delivery this year
Check your work
The request restates the order number, the quantity and the confirmed date.
She asks for a new firm date and a reply by a specific time.
She plans for the partial delivery of 6 cases.
The requested tone is friendly and firm, with no threats, taking the first delay into account.
The format sets the length, the subject line with the number, and the signature.
See the answers
Sylvie’s request
Role: you are a procurement officer at a 40-employee window manufacturer; the relationship with this supplier is good and this is their first late delivery of the year.
Context: order no. 24-0871 of 3 November, 18 crates of laminated glass, delivery confirmed by e-mail on 5 November for the morning of Thursday 12 November. On the 12th at 2pm, nothing has arrived and we have heard nothing. Without this glass, our glazing workshop stops on the morning of Monday 16th.
Task: write the chaser e-mail to customer service: restate the order and the confirmed date, ask for a new firm date and the tracking number before 10am on Friday 13th, and, if the 18 crates aren’t available, a partial delivery of 6 crates before Monday.
Format: six lines at most, subject line with the order number, friendly but firm tone, signed Sylvie, Procurement Officer, [direct phone number].
Roughly what you should get
An e-mail of five or six lines, a subject line such as “Order 24-0871, delivery of 12/11 not received”, a clear cut-off time and the partial solution.
Before sending, Sylvie calls customer service: a delay that stops a workshop is dealt with by phone, and the e-mail confirms what was said. She notes the new date in her tracking spreadsheet, on supplier B’s row.
Level 2 · independent20 min
Leasing or buying a forklift truck
Florian has to choose between two offers for an electric forklift. Write the request that compares their cost over 36 months, in code, and lists what is missing to make a decision. Then do the calculation yourself and compare it with the answer you get.
The material to work on
Florian, warehouse manager at a 30-employee drinks wholesaler in Mérignac.
Offer 1, long-term lease:
- Term: 36 months
- Rent: €420 excl. VAT per month
- Preventive and corrective maintenance included, battery replacement included
- €500 excl. VAT excess per claim in the event of damage
- Refurbishment charges on return according to the lessor’s schedule (schedule not provided)
Offer 2, purchase:
- Price: €14,900 excl. VAT
- Maintenance contract: €95 excl. VAT per month, renewable annually
- Manufacturer’s warranty: 12 months
- Battery not covered after 12 months (replacement price not stated)
Planned use: one workstation, two shifts, about five years.
Check your work
The request specifies the comparison period (36 months) and insists on the calculation being done in code.
She asks for missing items to be flagged: refurbishment grid, battery price, resale value.
She asks at what resale value buying becomes cheaper.
She takes into account the planned five-year use, beyond the 36 months.
Your calculation gives €15,120 excl. VAT for leasing and €18,320 excl. VAT for buying over 36 months.
See the answers
Florian’s request
Role: you are a warehouse manager comparing two ways of financing an electric forklift.
Context: offer 1, 36-month long-term lease at €420 excl. VAT per month, maintenance and battery included, €500 excl. VAT excess per claim, refurbishment charges on return according to a schedule not provided. Offer 2, purchase at €14,900 excl. VAT, maintenance at €95 excl. VAT per month renewable annually, 12-month warranty, battery not covered afterwards, replacement price not stated. Use: two shifts, about five years.
Task: by running code, calculate the cost of each offer over 36 months, then the resale value above which buying becomes cheaper. List everything missing to make a decision and the questions to ask each supplier. Say what changes if the forklift is used for five years.
Format: a cost table, the detailed calculation, the break-even resale value, then the questions.
Roughly what you should get
A two-column table, the calculation set out, a resale threshold and a list of five or six questions (refurbishment grid, battery price and lifespan, terms for extending the lease).
The calculation to redo
Item
Lettings
Purchase
Over 36 months
36 × 420 = €15,120 excl. VAT
14,900 + 36 × 95 = €18,320 excl. VAT
Gap
€3,200 excl. VAT more for the purchase
Balance
Buying works out cheaper if the forklift resells for more than €3,200 excl. VAT after 36 months
What is missing
The repair schedule
The price of a battery, the resale value
If ChatGPT reaches a verdict without picking up the refurbishment charges schedule or the battery price, its answer is incomplete: those two lines are often what make the difference. The decision rests with Florian and his manager, once both suppliers have replied.
Level 3 · demanding case35 min
A stock-out at a sole supplier
You are Margaux, supply chain manager at a 55-employee aluminium gate manufacturer in Limoges. The sole supplier of motor units announces a suspension of deliveries. Using ChatGPT, in several successive requests, prepare the stock coverage calculation order by order, the e-mail to the supplier, the template message to the customers affected and a half-page note to the managing director. Priority decisions remain yours: ChatGPT prepares them.
The material to work on
E-mail received on Monday 9 November at 8.12am, from the motor supplier’s customer service:
“Hello, due to an incident on our assembly line, deliveries of MC-400 sliding gate motors are suspended for an estimated three weeks. We will get back to you as soon as possible with a restart date. We apologise for any inconvenience caused.”
Stock at 9 November: 34 MC-400 motors.
Order in progress with the supplier: 60 motors, delivery scheduled for 13 November, now suspended.
Customer orders to ship (motorised sliding gates):
- Customer 1, installer in Brive: 12 gates, dispatch 12 November
- Customer 2, merchant in Poitiers: 8 gates, dispatch 16 November
- Customer 3, installer in Pau: 10 gates, dispatch 19 November
- Customer 4, private customer via an installer in Limoges: 1 gate, dispatch 20 November, job already postponed once
- Customer 5, property developer in Bordeaux: 18 gates, dispatch 26 November, late-delivery penalties in the contract
- Customer 6, installer in Angoulême: 6 gates, dispatch 30 November
Other facts:
- A second motor manufacturer was met at a trade show last year, never tested.
- Its motor requires the mounting plate to be adapted: half a day of design office work, then a test.
Check your work
The work is split into successive requests, one per deliverable, with a review between each.
The coverage calculation follows the orders date by date, in code, and shows from which order the stock runs short.
The email to the supplier asks for a firm date, a priority partial delivery and details of the cause.
The message to customers gives no date the supplier has not confirmed.
The note to the manager sets out costed options and leaves the decision to the manager.
No client or supplier name appears in the requests.
See the answers
This case takes four requests, not one: the method from the lesson “Break a long task into steps and stay in control at each step”. The first sets out the figures; everything else depends on it, and a calculation error at this stage would end up in every email.
First request: stock coverage
Role: you are supply chain manager at a manufacturer of aluminium gates.
Context: stock of 34 motors on 9 November; no more deliveries from the supplier for around three weeks. Orders to ship, one motor per gate: customer 1, 12 on 12/11; customer 2, 8 on 16/11; customer 3, 10 on 19/11; customer 4, 1 on 20/11, site already postponed once; customer 5, 18 on 26/11, late-delivery penalties in the contract; customer 6, 6 on 30/11.
Task: by running code, calculate the remaining stock after each shipment, in date order, and state the first order that cannot be fulfilled and the total shortfall. Then propose two different priority orders, saying for each which customer is served late and what that is likely to cost, without deciding.
Format: a table (date, customer, quantity, remaining stock), the total shortfall, then the two scenarios in five lines each.
Roughly what you should get
A six-row table, a shortfall with figures and two scenarios, for example “dates first” and “penalties first”. The choice between them is for Margaux and the managing director.
The calculation Margaux redoes
Date
Client
Quantity
Remaining stock
12/11
Customer 1
12
22
16/11
Customer 2
8
14
19/11
Customer 3
10
4
20/11
Customer 4
1
3
26/11
Customer 5
18
manque 15
30/11
Customer 6
6
manque 21
Second request: the email to the supplier
Role: you are supply chain manager; the relationship with this supplier is long-standing and good.
Context: they have announced a suspension of around three weeks for MC-400 motors. Our order of 60 units was due on 13 November. We are 21 units short of what we need to fulfil our orders until 30 November, 18 of them for a customer who ships on 26 November with late-delivery penalties.
Task: write an email asking, before midday on Wednesday 11 November, for a firm restart date, the possibility of a priority partial delivery of 21 units before 25 November, and the exact nature of the incident.
Format: no more than ten lines, subject line with the reference MC-400, firm and courteous tone, signed Margaux, supply chain manager.
Roughly what you should get
An e-mail of eight to ten lines, three numbered requests, a cut-off time. It mentions neither penalties against the supplier nor a change of supplier: that has not been decided yet.
A two-page policy for your company, to complete in Word: authorised tools, prohibited data, review, disclosure of use, named contact, training and Article 4 of the AI Act.
Every request to copy from the course, including answers, practical examples and practice exercises, arranged by module and lesson, with filters to find the right one.
For each lesson, the main exercise and the three graded practice exercises with their materials, to do on paper or alongside ChatGPT; all the answers are grouped together at the end.
The course’s practical examples, job by job: the situation, the requests as they were written, the standard replies obtained and what was checked before using them.
The use cases from the twelve job-specific lessons in a filterable table: the lesson, the standard request and the data risk level (green, amber, red) with the precaution to take.
All the lessons in a single PDF: objectives, written course with its diagrams, tables and requests, common mistakes, exercise and key takeaways. The practice exercises and answers are in the workbook, the examples in the collection.
Your notes stay on this device; they are not sent anywhere.
A question for the tutor
A result that doesn’t match the model answer, a prompt that gets you nowhere, a case specific to your business: write to us with your prompt and the response you got. A Bonbay Académie trainer replies within 24 working hours, on your case.