Lesson 23, module 7: ChatGPT in your job Tradespeople, construction and field jobs: the phone, site photos, quotes Dirty hands, phone in your pocket: what can you do with ChatGPT on site? Dictate instead of typing Take a photo instead of copying Write to the client from the van Two minutes of dictation, five minutes of review, one report sent. [Diagram: The dictated site report] 1. On site 2. Formatting 3. Review 4. Sending Two minutes of dictation on site, five minutes of review in the van. The raw dictation becomes a four-part report. Prompt: Here is my dictation from the renovation site: [dictation]. Write the report: progress by trade, problems, decisions, to-dos with who and by when. Add nothing. Response: A four-part report and an action table. Unclear points in the dictation are flagged "to clarify" instead of being guessed. One photo of the plate, and the references are noted. Prompt: Photo attached: the rating plate of a boiler. Note the brand, model, serial number, output and year. Write "illegible" for anything you can't read. Response: A five-line list, with "illegible" where the photo can't be read. Check the serial number against the plate before ordering a part. For a quote, never ask it for a price: give it the price. [Diagram: A quote with ChatGPT] What you give it What you don't ask it for Never ask it for a price: give it the price. Tell the client about a delay before they find out. The cause in one sentence The new, realistic date What's being done to meet it Exercise: a renovation in Talence, six days late, a report and an e-mail. Your turn: A renovation in Talence, six days late The written course, the corrected exercise and the quiz are below the video.
Lesson 23 of 54 · module 7, chatgpt in your job
Tradespeople, construction and field trades: the phone, site photos, quotes
In the field, you use ChatGPT on your phone: you dictate the site report, photograph a rating plate or a document, and send the e-mail to the customer from the van. For a quote, never ask it for a price: give it the price. It formats, spots omissions and explains to the customer, without ever validating a standard.
36 min of reading
1 min 41 of video
8 diagrams
7 demandes to copy
3 exemples pratiques
4 exercices answerss
5 questions
1 ressource
By the end of this lesson, you will know how to
Dictate a site report from the app and check it before sending
Have it read the details from a photographed plate or document, with no client data
Format a quote from your prices and write to the client after a delay
What’s covered
The app on the phone
The dictated site report
The photo of a plate or a document
Quotes, based on your prices
Write to the customer
3 worked examples, followed from start to finish
Exercise with answers · A renovation in Talence, six days behind schedule
3 practice exercises, from guided to demanding cases
The quiz
Key points
In the field, dictation and photos replace the keyboard; figures are checked before sending.
For a quote, never ask it for a price: give it one.
Crop a photo before sending it: no faces, number plates, addresses or client letters.
A standard or DTU (French building code) cited by ChatGPT is checked in the reference text.
A delay is announced by phone, then confirmed in writing with an achievable date.
A tradesperson, site manager or field technician writes little at the office and a lot in the evening: reports, quotes, emails to clients, parts orders. On site, the keyboard isn’t the tool: voice and the camera are. The ChatGPT app on your phone, with dictation and photos, changes how these tasks get done, provided you stay in control of prices and good trade practice.
Field tasks, the prompt to use and the check to make
Task
Lesson request
Usual time
With ChatGPT
Check to carry out
Write a site report
The dictated report
30 min in the evening
7 min on site
Dates, quantities, trades
Read a number plate or a document
The photo of the plate
10 min
2 min
Serial number checked against the plate
Tidying up a quote
The quote from your prices
1 h
20 min
Total recalculated, VAT correct
Spot what’s missing from a quote
Reviewing for omissions
20 min
5 min
Every addition decided by you
Telling a client about a delay
The email after a delay
20 min
5 min
A new date you can keep
Explain a technical point to the client
The simple explanation
15 min
5 min
No unverified standard cited
The app on the phone
Dictate a request in the app
Install the ChatGPT app from the App Store or Google Play, then sign in with the same account as on your computer.
Open a new conversation, or the “Chantiers” project if you have one.
Tap the microphone icon next to the input field: this is dictation, which turns your voice into text.
Speak normally, then tap again to stop. Reread the transcribed text before sending.
The other icon, for voice mode, opens a spoken conversation: useful for thinking things through, less so for a report.
The label may vary slightly depending on the version.
On a noisy site, move away from the saw or the cement mixer, or dictate in the van. Say figures slowly and in full (“thirty-two square metres”, “Tuesday the eighth of December”): those are what dictation mangles. Conversations started on your phone are there on the computer at the office for final formatting. Lesson 25 goes further into voice mode.
On site or at the office
The same dayUrgencyCan wait
On site, by phone
The delay e-mail, the parts order: dictated and sent from the van.
Dictated on site, finished at the office
Meeting minutes: dictation straight away, formatting in the evening.
In the van, at the end of the day
Confirming the next day’s appointment, asking for a review.
At the office, at the keyboard
The quote, the end-of-works file: prices and tables are proofread on a big screen.
A few linesText lengthOne page or more
Short, urgent messages go out from the site; long, costed ones get reread on a big screen.
The dictated site report
The dictated site report
1On site
Two-minute dictation and three photos
2The formatting
Progress, problems, decisions, next steps
3Review
Dates, quantities, names of trades
4Sending
To the customer and other companies, from your e-mail
Two minutes of dictation on site, five minutes of checking in the van.
The report from the dictation
Role: you are a site manager at a [trade or general contractor] firm with [number] employees.
Context: site: [type of work, e.g. renovation of a 120 m² house], visit on [date]. Work packages in progress: [list of packages]. Here is my raw dictation, recorded on site: [paste the transcript, with the client referred to as “the client” and firms by their trade].
Task: write the site report from the dictation only. Where a point is unclear or incomplete, write “to be confirmed” instead of guessing. Don’t add any quantity, date or decision.
Format: four sections (progress by package, problems found, decisions taken, any snags), then a table of actions (what, who, by when), then the list of “to be confirmed” items.
Roughly what you should get
A one-page report in four parts, an action table and a short list of points to clarify. Check the dates and quantities in the van: that’s where dictation errors creep in.
The photo of a plate or a document
Before sending a photo to ChatGPT
1Is the photo free of faces, number plates and legible addresses?
No Crop it, or retake it from another angle.
2Is the photographed document free of the client’s name, phone number and contact details?
No Cover these areas with your finger or the phone’s editing tool.
3Is the information to be read clear and complete?
No Retake the photo straight on, in good light, with no glare.
Yes to allAttach the photo and say what it should read.
Extract the information from a photo
Role: you are a maintenance technician in [heating, electrical, air conditioning, plumbing].
Context: the attached photo shows [an appliance rating plate, an electrical panel, a product label, a page of a manual]. I need it to [order a part, prepare the service, write the quote].
Task: record the legible information: [make, model, serial number, power, voltage, year, part numbers]. For any information you cannot read with certainty, write “illegible”; do not infer anything.
Format: a list with one line per item, then one sentence on the quality of the photo (sharp, glare, cropped area).
Roughly what you should get
A short list, with “illegible” where needed, and a note on the photo quality. A misread reference means the wrong part: compare the number with the plate before ordering.
The same method works for a delivery note to check, instructions in English to understand, or a plan to read off. Attach the photo with the app’s + button, choose the camera or the gallery, and say exactly what you want to get from it.
Quotes, based on your prices
A quote with ChatGPT
What you give it
Your unit prices and your hourly rate
Quantities measured on site
Your usual legal notices and terms
The prompt: formatting, omissions, text for the client
What you don’t ask it for
“How much does a 6 m² bathroom cost?”
A “market” hourly rate
A quantity of materials without a measured survey
Compliance with a DTU or a standard
Never ask it for a price: give it one.
ChatGPT knows neither your purchase prices, nor your hourly rate, nor the state of the wall behind the tiles. Any price it suggests is a rough average drawn from texts, unrelated to your business or the job. It is, however, very useful for formatting a quote you have priced, spotting a missed item and writing the covering text that explains the quote to the client.
The quote tidied up from your prices
Role: you are the administrative assistant at a [trade] firm with [number] employees.
Context: work: [two-sentence description]. My line items, priced by me: [for each item: description, quantity, unit, unit price excl. VAT]. VAT rate I believe applies: [rate], to be checked. Lead time: [lead time]. Quote valid for: [duration].
Task: present these items as a clear quote, grouped by work package, with descriptions a private customer can understand. Calculate the totals by running code. Don’t change any price and don’t add any item.
Format: a table (package, description, quantity, unit, unit price excl. VAT, total excl. VAT), then the total excl. VAT, the VAT and the total incl. VAT, then a six-line covering note for the customer.
Roughly what you should get
A table per work package, totals calculated in code and a short text for the client. The final quote is produced in your quoting software, with your mandatory statements: ChatGPT prepares, it doesn’t replace the tool.
Spot what’s missing from a quote
Role: you are an experienced site manager reviewing a colleague’s quote.
Context: job: [type, area, condition found]. Planned quote, items without prices: [paste the list of items and quantities].
Task: list the items often missing on this type of job (preparation, protection, rubble removal, travel, finishing, connections) and the quantities that look inconsistent with the area. Put them as questions: I make the decision.
Format: two lists of one-line questions: possibly forgotten items, quantities to check.
Roughly what you should get
Two lists of short questions. Some don’t apply to your job: you discard them. A single useful question can avoid a variation order the client takes badly.
Write to the customer
The email to the client after a delay
Role: you run a [trade] firm and you are writing to a private customer, frankly and respectfully.
Context: [type of work] project. Planned completion date: [date]. Cause of the delay: [actual cause in one sentence, e.g. windows and doors delivered six days late by the manufacturer]. New completion date, which we know we can meet: [date]. What we are doing to limit the delay: [actual measures]. The customer has [or has not] already been told by phone.
Task: write the email. The new date in the first two lines, the cause in one sentence without blaming others, what is being done, and an offer to meet on site.
Format: eight lines at most, a clear subject line, signed [first name, job title, phone].
Roughly what you should get
A short email giving the new move-in date and offering a visit. Before sending, check the date is achievable: announcing a second delay costs more than the first.
Explain a technical point to the client
Role: you are a tradesperson explaining your work to a private customer, without jargon.
Context: the customer asks why [for example: you have to wait before laying parquet on a new screed]. What I know and want to tell them: [your technical explanation, with the waiting time you apply].
Task: rephrase my explanation in simple words, with an everyday comparison. Do not add any standard, timescale or figure I have not given.
Format: no more than five lines, to send by text message or e-mail.
Roughly what you should get
Five clear lines restating your timescale, with a vivid image. If a figure or standard appears that you didn’t give, remove it.
A project’s messages to the client
SignatureThanks and next steps
The start date, what happens next, the contact.
J-7Confirmation
Date, time, access, what the client prepares.
Every FridayProgress update
Five lines and two photos: done, coming up, decision needed.
The day something goes wrongThe delay explained
Before the client finds out, with a new date that can be met.
ReceiptSummary
Snags, maintenance, documents handed over.
J+15Request for an opinion
Two lines and the link to the Google listing.
Six short messages, each prepared with ChatGPT in a few minutes; the client is never caught by surprise.
Mistakes to avoid
Asking ChatGPT for the drying time of a render, how long to wait before tiling a screed, or a product’s mixing ratio.
These values depend on the exact product, its thickness, temperature and humidity. ChatGPT gives a plausible average, which may be wrong for the product applied on your site.
Photograph the manufacturer’s technical data sheet or the bag label, and ask ChatGPT to pick out the times and conditions of use: the figure comes from the manufacturer, ChatGPT only reads it.
Ordering materials from dimensions ChatGPT reads off a photo of a plan or sketch.
A badly written figure, a dimension hidden by a fold, a 1 read as a 7: reading a photo goes wrong without warning, and the error is only discovered when the box is unpacked.
Have the dimensions listed in a table, then compare each row with the drawing yourself; a doubtful dimension gets re-measured with a tape on site.
Pasting ChatGPT’s answer as it is into a text message or WhatsApp, asterisks and hash signs included.
ChatGPT often formats its answers with symbols that become bold text or headings in its window, but stay as asterisks and hash signs in a text message. The client receives an unreadable message.
Add “no formatting, no asterisks, no hash signs” to any request for a short message, and check the preview before sending.
Keep a single conversation for all the month’s projects, from the first dictation to the last.
As the conversation goes on, ChatGPT mixes up quantities, dates and clients from different sites. A report can pick up the floor area of another site.
One conversation per job, stored in the “Jobs” project, with the job’s code name as its title. Shared instructions live in the project, not in the thread.
3 SME situations followed from start to finish: the prompts exactly as they were written, the model answer to aim for, and what was checked before sending.
Example 1
The materials order dictated on site by a plumber
Ludovic runs a plumbing and heating business with 4 employees in Langon. He does his own estimates and ordering, often in the evening. On Friday, on a bathroom job, he dictates the list of materials to order from the merchant for Monday: he wants to avoid the month’s third round trip for a forgotten part.
From dictation to order
1Dictation on site
Unsorted, in the order the documents arrive
2Table and calculations
Crowns and bars counted, calculation shown
3Lines to complete
References and diameters taken from the invoices
4Email to the merchant
Sent from the site, one question
5Stock confirmed
Before Monday, not at the counter
Request 1
Role: you are the assistant to a plumbing and heating engineer.
Context: here is my dictation, recorded on site, for Monday’s order from the merchant. It is all over the place: “Right, I need 16 mm multilayer, about 22 metres, the press fittings, elbows I need 10, tees 4, and couplers I don’t know, put 6. For the waste, 40 mm PVC, 6 metres, two 45° bends and two 87.5°. A thermostatic shower mixer, I haven’t got the reference, the one I usually get. Pipe clips, one box. And the ultra-slim 90 by 120 shower tray, white. Oh, and the waste that goes with it.”
Task: tidy up this order.
Format: a table (description, size, quantity, unit, remarks), marking “TO BE COMPLETED” on every line missing information needed to order. Multilayer is sold in 25-metre coils and PVC in 4-metre lengths: work out the number of coils and lengths, and show the calculation.
Model answer
Merchant order for Monday
Description | Size | Quantity | Unit | Note
Multilayer pipe | 16 mm | 1 | 25 m coil | Need 22 m: 22 ÷ 25 = 0.88, rounded up to 1 coil
Multilayer press elbow | 16 mm | 10 | each |
Multilayer press tee | 16 mm | 4 | each |
Multilayer press coupling | 16 mm | 6 | each | Quantity estimated by you
PVC waste pipe | 40 mm | 2 | 4 m length | Need 6 m: 6 ÷ 4 = 1.5, rounded up to 2 lengths
PVC 45° elbow | 40 mm | 2 | each |
PVC 87.5° elbow | 40 mm | 2 | each |
Thermostatic shower mixer | | 1 | each | TO COMPLETE: usual reference
Pipe clips | to be specified | 1 | box | TO COMPLETE: diameter (16 or 40 mm?)
Low-profile shower tray | 90 × 120 cm | 1 | each | White. TO COMPLETE: material and reference
Shower tray waste | to be specified | 1 | each | TO COMPLETE: diameter compatible with the tray
Four lines to complete before sending: mixer, clips, tray, waste.
Ludovic finds the mixer tap reference on his last invoice, picks the shower tray from the merchant’s catalogue and takes two boxes of pipe clips, one per diameter. He has the counter confirm the waste.
Request 2
Draft the order email to the merchant’s trade counter, based on this corrected table: [paste the corrected table]. Delivery requested to the depot before 8am on Monday, or collection from the counter at 7.30am. Ask them to confirm availability today, especially for the shower tray and the compatible waste. Keep it short, with no long sign-off.
Model answer
Subject: order for Monday morning, [company], customer account [number]
Hello,
Here is our order for Monday. Please deliver to the depot before 8am if possible; otherwise, we will collect from the trade counter at 7:30am.
[corrected order table]
Could you confirm today that each item is available, particularly the 90 × 120 shower tray? Please also suggest a waste that fits this tray.
Thanks,
Ludovic [surname]
[phone]
He sends it from his phone before leaving the site.
What was checked before sending
The calculations: coils and lengths recalculated mentally (22 m for 25, 6 m for 8); 3 m of spare multilayer pipe is enough for offcuts.
Facts: every “TO COMPLETE” line filled in from an invoice or the catalogue, never by ChatGPT.
Tone and audience: the e-mail read as the trade counter; one table and a single clear question.
Ten minutes instead of half an hour in the evening, and above all the waste and the clamps spotted before ordering rather than when unpacking.
Example 2
Eight snags to clear after handover of a façade renovation
Céline is a works supervisor at a 25-employee painting and façade renovation firm in Lormont. On Thursday 3 December, the project manager signed off the façade renovation of a three-building residence with eight snags. She has to get them cleared within a week and reply to the project manager the very next day.
Eight snags in eight days
Thursday 3Receipt
Eight snags in the handover report.
Friday 4Table and e-mail
Snag-clearing schedule sent to the project manager.
Monday 7Snags 2, 6 and 7
Hall A, floor protection, grid.
Tuesday 8Snags 1, 3 and 5
Cherry picker for the drips, crack, shade panel.
Thursday 10Snag 4
Rainwater downpipes by the roofer.
Friday 11Snag clearance visit
With the project manager, at 10am.
Request 1
Role: you are a site manager at a 25-person painting and façade renovation company.
Context: handover of a façade renovation on a three-building residence, on Thursday 3 December. Here are the snags from the handover report, copied without names or addresses:
1. Building A, north façade: runs under the 2nd-floor window sill, on the left.
2. Building A, entrance hall: visible paint patch on the plinth.
3. Building B, south façade: untreated crack at the foot of the façade, about 1 m.
4. Building B: two rainwater downpipes not refitted after the works.
5. Building B, east façade: different shade on a panel of about 4 m².
6. Building C: floor protection not removed at the foot of the outdoor staircase.
7. Building C, west façade: ventilation grille painted over, to be cleared.
8. Whole site: paint stains on three vehicles, reported by the managing agent.
Our resources: a team of two painters on Monday 7 and Tuesday 8 December; the roofing and zinc-work subcontractor, to be called.
Task: prepare the snag clearance table.
Format: a table (number, building, snag, work required, who, planned date, equipment), then the list of points I need to decide myself.
Model answer
Clearing the snag list, handover of 3 December
No. | Bldg | Snag | Work required | Who | Date | Equipment
1 | A | Drips under sill, 2nd floor left | Clean, sand down, repaint the area | Painting team | Monday 7 | Cherry picker or mobile scaffold
2 | A | Visible join on lobby dado | Redo the dado from corner to corner | Painting team | Monday 7 | Paint of the same reference
3 | B | Untreated crack, 1 m at base of façade | Open up, treat, redo the finish | Painting team | Tuesday 8 | Treatment product for you to choose
4 | B | Two downpipes not refitted | Refit and fix the downpipes | Roofer | To be agreed with him | Brackets to be checked
5 | B | Different shade, 4 m² panel | Redo the whole panel, edge to edge | Painting team | Tuesday 8 | Paint from the same batch if possible
6 | C | Floor protection not removed | Remove and dispose of | Painting team | Monday 7 | Rubble sacks
7 | C | Ventilation grille painted over | Clear or replace the grille | Painting team | Monday 7 | Spare grille if needed
8 | All | Stains on three vehicles | Not part of the façade works: to be handled separately | You | Before any work | None
Points for you to decide
- Snag 3: the product and method, depending on the type of crack found on site.
- Snag 4: the roofer’s date; clearing this snag depends on him.
- Snag 5: does the shade come from a different paint batch? The whole panel is redone either way.
- Snag 8: recording the stains, your insurer’s view, contact with the managing agent. No vehicle is to be cleaned without its owner’s written consent.
Céline approves the table, but the cherry picker is only free on Tuesday: she moves snag 1. The roofer, reached by phone, will come on Thursday 10.
Request 2
Draft the e-mail to the project supervisor sending the snagging schedule, with these corrections: snag 1 on Tuesday 8 December, snag 4 on Thursday 10 December by our roofer. Suggest a snagging sign-off visit on Friday 11 December at 10am. For snag 8, just say we are contacting the managing agent. Professional tone, short.
Model answer
Subject: [name] residence, clearing the snags from the 3 December handover
Dear Mr [surname],
Following the handover on 3 December, here is our schedule for clearing the eight snags:
- Monday 7 December: snags 2, 6 and 7 (plinth in hall A, floor protection in building C, ventilation grille);
- Tuesday 8 December: snags 1, 3 and 5 (run marks on building A, crack at the base of the façade and colour panel on building B);
- Thursday 10 December: snag 4, refitting of the two rainwater downpipes by our roofing and zinc subcontractor;
- snag 8: we are contacting the managing agent about the vehicles.
I suggest a snag sign-off visit on Friday 11 December at 10am. Could you confirm this slot?
Kind regards,
Céline [surname]
Site manager, [company]
[phone]
Sent as it is on the morning of Friday 4, with the minutes attached.
What was checked before sending
Facts: the eight snags in the table compared one by one with the handover report, none missed, none reworded so far as to change the meaning.
Dates: every date checked against the schedule for the teams, the cherry picker and the roofer.
Tone and audience: reservation 8 handled without admitting liability in writing, until it has been discussed with the insurer.
Data: no co-owner’s name and no registration number in the conversation.
Twenty-five minutes instead of an hour and a quarter for the table and the e-mail, with snag 8 flagged as a separate issue.
Example 3
The schedule for five teams of electricians, and one message per team
Aurélien is a planner at a 70-employee general electrical contractor in Saint-Médard-en-Jalles. Every Friday, he assigns five teams to the following week’s sites, working around certifications, absences and fixed appointments. He wants a clash-free schedule, then a clear text message for each team leader.
Friday’s schedule
1Site requirements
Teams by day, fixed appointments
2Team constraints
Certifications, training, part-time work
3Proposed schedule
Gaps and conflicts flagged, not hidden
4Cell-by-cell check
In pencil, on the printed table
5One SMS per team leader
300 characters, no formatting
Request 1
Role: you are a planner at a general electrical contractor with 70 employees.
Context: week from Monday 14 to Friday 18 December. Five teams of two electricians (E1 to E5). Sites and requirements:
- C1, school complex, cable pulling: 2 teams every day, all week.
- C2, offices, connection of the main switchboard: 1 team Monday and Tuesday, inspection body on site Tuesday at 2pm.
- C3, new homes, fitting of switches and sockets: 1 team Wednesday to Friday.
- C4, recurring call-out at an industrial client: 1 team Monday morning.
- C5, detached house, commissioning: 1 team Friday.
Constraints: E3 is the only team certified to connect the main switchboard. E5 is on training on Thursday. E2 does not work on Fridays (part-time).
Task: propose a schedule that meets every constraint.
Format: a table, teams in rows and days in columns, then each constraint with where it is met. Flag any gap or conflict instead of resolving it silently, and count the free team-days.
Model answer
Schedule, week of 14 to 18 December
Team | Monday 14 | Tuesday 15 | Wednesday 16 | Thursday 17 | Friday 18
E1 | C1 | C1 | C1 | C1 | C1
E2 | C1 | C1 | C1 | C1 | Absent (part-time)
E3 | C2 | C2 (inspection 2pm) | Free | Free | C5
E4 | C4 in the morning, free in the afternoon | Free | C3 | C3 | C3
E5 | Free | Free | Free | Training | C1
Constraints
- C1, two teams every day: E1 and E2 Monday to Thursday, E1 and E5 on Friday. Met.
- C2 by E3, the only certified team, Monday and Tuesday: met.
- C3, one team Wednesday to Friday: E4. Met.
- C4, Monday morning: E4. Met.
- C5, Friday: E3. Met.
- E5 in training on Thursday, E2 absent on Friday: met.
Points to flag
- Spare capacity: six team-days and one half-day (E5 Monday, Tuesday and Wednesday; E4 Tuesday; E3 Wednesday and Thursday; E4 Monday afternoon).
- On C1, the team changes on Friday (E5 replaces E2): plan a handover on Thursday evening.
Aurélien checks every cell against the constraints, in pencil, on the printed table. He will assign the free days on Monday to a delayed site that ChatGPT knew nothing about.
Request 2
Draft this week’s text message for each team leader: their day-by-day schedule, arrival at 7.30am at every site, and an instruction specific to their schedule where there is one. 300 characters at most per message, formal “vous”, no formatting (no asterisks, no hash signs). For free days, write “assignment given on Monday”.
Model answer
E1: Week of 14/12: C1 school complex Monday to Friday, arrive 7.30am. On Friday, E5 replaces E2 alongside you: please catch up with them on Thursday evening.
E2: Week of 14/12: C1 school complex Monday to Thursday, arrive 7.30am. Thursday evening, handover to E5 on cable-pulling progress. Friday off.
E3: Week of 14/12: Monday and Tuesday C2 offices, connecting the main distribution board, inspection body Tuesday 2pm. Wednesday and Thursday: assignment given on Monday. Friday C5, commissioning. Arrive 7.30am.
E4: Week of 14/12: Monday morning C4 industrial call-out, Monday afternoon and Tuesday: assignment given on Monday. Wednesday to Friday C3 housing, fitting switches and sockets. Arrive 7.30am.
E5: Week of 14/12: Monday to Wednesday, assignment given on Monday. Thursday training. Friday C1 school complex with E1, handover from E2 on Thursday evening. Arrive 7.30am.
He adds the address of site C5, a private home, by hand: it comes from the scheduling software, not from the conversation.
What was checked before sending
The calculations: each day’s requirements recounted (C1 two teams, five days) and the six free days found again in the table.
Facts: E3’s electrical authorisation checked in the company’s authorisation register, not in the conversation.
Tone and audience: each SMS read as the team leader at 7am, with no table or asterisks, under 300 characters.
Data: no electrician’s name or homeowner’s address in ChatGPT, only E1 to E5 and C1 to C5.
Twenty minutes instead of an hour on Friday afternoon, as a rough guide for a week with five teams.
Yannick is a site manager at a general renovation company in Cenon with 11 employees. He is overseeing the renovation of a 110 m² house in Talence. On Tuesday 24 November, at the end of a site visit, he dictates: “Ground-floor plasterboard finished, joints taped, sanding Thursday. Electrician has finished the chases upstairs, still has the bathroom to do. Windows and doors arriving six days late, delivery on 2 December instead of 26 November, manufacturer notified by email. So the exterior painting slips. Completion pushed back from Friday 4 to Friday 11 December. Client not told yet.” Write the request that produces the site report and the email to the client, then explain how Yannick checks both texts.
Read through the transcript and correct any words the dictation misheard.
Write the prompt in four lines for the report and the email.
Forbid any added quantity, date or decision.
Check the dates, the trades and the new completion date.
Call the customer before sending the e-mail.
See the answers
The corrected request
Role: you are a site manager at an 11-employee general renovation firm in Gironde.
Context: renovation of a 110 m² house, visit on Tuesday 24 November. My dictation: “Ground-floor plasterboard finished, taping done, sanding Thursday 26. The electrician has finished chasing upstairs, he still has the bathroom to do. The windows and doors are arriving six days late: delivery on 2 December instead of 26 November, manufacturer notified by email. Exterior painting pushed back by the same amount. Completion moved from Friday 4 to Friday 11 December.” The client hasn’t been told yet.
Task: 1. The visit report: progress by package, problems, decisions, table of actions (what, who, by when); write “to be confirmed” for anything missing, add nothing. 2. The email to the client: the new completion date in the first two lines, the cause in one sentence, what we’re doing, an offer to meet on site.
Format: the report on one page; the email in eight lines at most, signed Yannick, Site Manager, [phone].
Roughly what you should get
A four-part report with two or three “to clarify” items (the electrician’s finish date, the day painting resumes), and a short email that opens with Friday 11 December.
The dictation wrote “placo”: Yannick replaced it with “plasterboard”, which is clearer for the client who will receive the report. He also specified “Thursday 26th”: “Thursday” on its own is hard to read a week later.
Yannick’s checks
Inspection
What he checks
The facts
Every trade package mentioned in the report matches the dictation, with no added work
Dates
26 November, 2 December, 4 and 11 December: six days’ delay on the joinery, one week on completion
The commitments
11 December is achievable with the painter’s schedule, confirmed by phone
Tone and audience
The email read as the client would: the date first, no blame shifted onto the manufacturer
The report goes to the client and the contractors involved from Yannick’s email, with three cropped photos: plasterboard finished, first-floor wall chases, openings awaiting the joinery. None shows the street-side façade.
Practise
Three more exercises, from the most guided to the most demanding. The material is provided in full: copy it into your tool, then check your work against the criteria before opening the answers.
Level 1 · guided10 min
The appointment confirmation the day before
You are Mickaël, a self-employed plumber with an apprentice, in Cadillac. Tomorrow you are replacing a water heater at a customer’s home. 1. Pick out from your notes what the customer needs to know or prepare. 2. Write the request that produces a confirmation text message and e-mail. 3. Check the date, the time and the announced shut-offs.
The material to work on
My notes
Appointment tomorrow, Tuesday, at 8am: replacing a 200-litre electric water heater for a private customer in Langoiran.
Duration: the morning.
Hot water off all morning, cold water off for about an hour.
Needed: clear access to the utility room, a space for the van in front of the house.
We take the old water heater away.
Invoice sent by email, payment within 15 days.
Check your work
The request gives the date, time and duration, and asks for nothing to be added.
The SMS is 300 characters at most and contains no asterisks or hash signs.
Both shut-offs (hot water, cold water) are announced with their duration.
What the client prepares (utility room cleared, space in front of the house) appears in both texts.
See the answers
The SMS and e-mail the day before
Role: you are a plumber and you are writing to a private customer, simply and politely.
Context: here are my notes for tomorrow’s appointment: [paste the notes].
Task: write two confirmation texts: a text message and a slightly fuller email.
Format: the text message in 300 characters maximum, with no formatting, giving the date, time, duration, the two shut-offs and what she needs to prepare. The email in eight lines maximum, adding the removal of the old water heater and payment of the invoice. Do not add anything that is not in my notes.
Roughly what you should get
Text message: “Hello, I confirm your water heater will be replaced tomorrow, Tuesday, at 8am, for the morning. No hot water for the morning, no cold water for about an hour. Please clear access to the utility room and leave a space in front of the house. Mickaël, plumber.” The e-mail repeats the same facts, then covers removal of the old appliance and the invoice by e-mail, payable within 15 days.
Mickaël counts the characters in the text message before sending and checks that “Tuesday” matches the date in his diary: this is the first check, the facts, on the only piece of information the customer will remember.
Level 2 · independent20 min
Reply to a complaint about cracks in render
You are Grégory, manager of an 8-employee facade company in Saint-Loubès. You receive the e-mail below. Get a reply written that offers an inspection visit, without admitting liability or giving a diagnosis before you have seen the problem. Then check the text with the four checks.
The material to work on
The client’s e-mail
Subject: cracks in the render
Hello,
You redid the render on our façade in September. For the past two weeks, fine cracks have been appearing above the garage door and under a window. For the price we paid, this is unacceptable. I expect you to come and inspect and repair it at your own expense, promptly.
Kind regards.
What you know
- Single-coat render applied from 7 to 12 September.
- The cracks may come from the substrate (old breeze-block wall, concrete lintel above the garage) or from the application: impossible to say without seeing them.
- Visit possible on Thursday 19 November at 5pm or Saturday 21 November at 9am.
Check your work
The reply acknowledges the customer’s inconvenience and thanks them for raising it.
It offers the two visit slots, with their exact day and time.
It admits no liability and suggests no cause before the visit.
It cites no warranty and no legal text.
It runs to ten lines at most and contains no stock phrases (“we acknowledge receipt”).
See the answers
The reply to the complaint
Role: you are the manager of a façade company with 8 employees and you are replying to an unhappy customer, calmly and respectfully.
Context: here is his email: [paste the email]. What I know: the render was applied from 7 to 12 September; the cause of the cracks cannot be known without a visit. I can come on Thursday 19 November at 5pm or Saturday 21 November at 9am.
Task: write my reply.
Format: ten lines maximum. Thank him for letting us know, say that I understand the inconvenience, offer the two slots and ask him to choose one. Do not suggest any cause, do not promise any free repair, do not mention any warranty or legal text. Formal “you” (vouvoiement), no administrative stock phrases.
Roughly what you should get
An email of seven to nine lines: thanks, acknowledgement of the inconvenience, two time slots in a list, one sentence explaining that the visit is to understand the cause of the cracks before deciding what to do next, and a signature with the direct phone number.
Facts: the site dates and the time slots compared with the calendar.
The tone: read as the client, the reply must neither defend itself (“the substrate was old”) nor give in (“we will repair it”).
Next: after the visit, the decision and its reasons are written up with full knowledge of the facts; in case of disagreement, the company’s insurer is informed before any written reply.
Level 3 · demanding case35 min
The minutes of a site meeting with contradictory notes
You are Hugo, works manager at a 30-employee general contractor responsible for refurbishing a two-storey health centre in Carbon-Blanc. You have the notes of three attendees and the e-mail from the architect, who was absent. Get the minutes of meeting no. 6 produced with their action table, highlighting each contradiction rather than settling it, then the e-mail to the architect.
The material to work on
Site meeting no. 6, Wednesday 18 November
Structural works site manager’s notes
First-floor slab poured on 12 November. Formwork removal scheduled for 2 December. The plasterer can start on the ground floor on 23 November. The electrician is behind on the ground-floor conduits.
Plasterer’s notes
I am not starting the ground floor until the electrical conduits are in. Start possible on 30 November if the electrician has finished by the 27th.
Electrician’s notes
Ground-floor conduits finished on 25 November. I am missing the reservation drawing for the staff kitchen, requested from the architect on 9 November, no reply.
Email from the architect, absent
Staff kitchen drawing sent to the electrician on 16 November. Please confirm the completion date for the ground-floor partitions, which determines when the tiler can start, scheduled for 7 December.
Check your work
The minutes list the three contradictions: the plasterer’s start date (23 or 30 November), completion of the ducts (25 or 27 November), the kitchen plan (sent on the 16th or never received).
ChatGPT settles no contradiction: each one becomes an action with an owner.
The completion date for the partitions, which nobody gave, appears as [TO BE CONFIRMED], not as an invented date.
The action table has four columns: action, owner, deadline, status.
The e-mail to the architect answers their question by saying what is known and what is not yet known.
See the answers
Minutes that show the contradictions
Role: you are a site manager at a general contractor, writing the minutes of a site meeting.
Context: meeting no. 6 on Wednesday 18 November, refurbishment of a two-storey health centre. Here are the participants’ notes and the email from the architect, who was absent: [paste the four texts].
Task: write the minutes. Where two sources contradict each other on a date or a fact, do not decide: write both versions side by side and create an action to clear up the doubt. A date that nobody gave is written [TO BE CONFIRMED].
Format: 1. progress by work package, 2. points of disagreement (fact, version A, version B, who decides), 3. action table (action, owner, deadline, status), 4. next meeting [TO BE CONFIRMED].
Roughly what you should get
A one-and-a-half-page report. Part 2 sets out three points of disagreement, each with its two versions. The action table has at least five rows, including “the electrician checks receipt of the plan sent on 16 November” and “the site manager confirms to the architect the completion date for the ground-floor partitions”.
The e-mail to the architect
Draft the e-mail to the architect sending the meeting minutes. Answer their question about when the ground-floor partitions will be finished by saying what is known (the plasterer starts between 23 and 30 November depending on the source, once the ducting is finished) and when I will give them a firm date. Mention that the electrician says they have not received the kitchen plan, and ask the architect to resend it. Eight lines at most.
Roughly what you should get
An email of six to eight lines, blaming no one, that sets a precise deadline for the firm date (for example Friday 27 November, after the announced completion of the ducting) and asks for the plan to be resent with acknowledgement of receipt.
The trap in this case is the temptation to let ChatGPT “tidy up” the dates to get a clean schedule. Site meeting minutes are authoritative between the contractors: they must contain only what was said or written, and Hugo proofreads them with the four sets of notes beside him.
A two-page policy for your company, to complete in Word: authorised tools, prohibited data, review, disclosure of use, named contact, training and Article 4 of the AI Act.
Every request to copy from the course, including answers, practical examples and practice exercises, arranged by module and lesson, with filters to find the right one.
For each lesson, the main exercise and the three graded practice exercises with their materials, to do on paper or alongside ChatGPT; all the answers are grouped together at the end.
The course’s practical examples, job by job: the situation, the requests as they were written, the standard replies obtained and what was checked before using them.
The use cases from the twelve job-specific lessons in a filterable table: the lesson, the standard request and the data risk level (green, amber, red) with the precaution to take.
All the lessons in a single PDF: objectives, written course with its diagrams, tables and requests, common mistakes, exercise and key takeaways. The practice exercises and answers are in the workbook, the examples in the collection.
Your notes stay on this device; they are not sent anywhere.
A question for the tutor
A result that doesn’t match the model answer, a prompt that gets you nowhere, a case specific to your business: write to us with your prompt and the response you got. A Bonbay Académie trainer replies within 24 working hours, on your case.