A lesson is completed when you tick it, when you watch its video to the end or when you score 80% on its quiz. The certificate is issued online after the final assessment, from a score of 32 out of 40.
Lesson 42, module 11: Automating what comes round again Scheduled tasks: a briefing every Monday without asking again Every Monday, the same hour-long search. Could it be ready before you get in? A scheduled task is a request, a time, a frequency. [Diagram: What a scheduled task contains] The request in four lines The period The sources The "nothing" case The day and time Anything missing, ChatGPT guesses, and you're not there to correct it. The request must stand on its own: no one will answer its questions. Request: Every Monday at 7.30am: find the tenders published in the last 7 days in Gironde for [lots]. Table: buyer, subject, deadline, link. If none: "Nothing new". Answer: On Monday morning, a notification, then a short table with one link per notice, or just the line "Nothing new this week". What to schedule, what to monitor, what not to schedule. [Diagram: What you hand over to a task] Green: Schedule it Amber: Schedule it, then monitor Red: Don't schedule it You can find, edit and pause a task from your account. Account menu, then Tasks Edit the request or the time Pause rather than delete A well-run week takes three or four tasks. [Diagram: A week with three tasks] Monday 7.30am: Tender watch Wednesday 8am: Product recalls Friday 4pm: Preparing for Monday The 25th: Month-end close Check every run: open the links, verify the dates. One link opened per line kept A deadline that has passed gets crossed out Fix the request after the first run In the exercise, you schedule the three tasks of an executive assistant. The Monday watch The month-end reminder on the 25th The Friday committee Your turn: Isabelle's three tasks The written lesson, the worked exercise and the quiz are below the video.
Lesson 42 of 54 · module 11, automating what comes back
Scheduled tasks: an update every Monday without asking again
A scheduled task is a request ChatGPT runs on its own, on the day and at the time you choose: the tender watch every Monday at 7.30am, the closing checklist on the 25th of the month. It is written in four lines, with a period, sources and a short format, and every run is checked before use.
30 min of reading
1 min 49 of video
7 diagrams
3 demandes to copy
3 exemples pratiques
4 exercices answerss
5 questions
1 ressource
By the end of this lesson, you will know how to
Schedule a recurring task from a conversation, then edit, pause or delete it
Write a request that stands on its own: period, sources, format, what to do when there is nothing
Sort what can be scheduled, what stays a one-off request and what needs another tool
What’s covered
What a task can do, and what it can’t see
Scheduling a task, click by click
Writing a request that works without you
When a scheduled task is not enough
3 worked examples, followed from start to finish
Exercise with answers · Isabelle’s three tasks
3 practice exercises, from guided to demanding cases
The quiz
Key points
A scheduled task runs a request on its own, on the day and at the time you choose, and prepares a briefing for you to read.
The request works without you: a dated period, sources, a short format, and a line for when there is nothing to report.
It cannot see your internal figures and sends nothing: anything that commits the company remains your action.
Each run is checked against the four controls, and the task list is reviewed every quarter.
Laurent is sales manager at a 35-employee building materials merchant in Libourne. Every Monday morning, he spends three quarters of an hour searching for tenders published during the week: the BOAMP, the municipalities’ buyer profiles, the département’s website. He retypes the same keywords, reopens the same pages and copies the deadlines into Excel. A scheduled task does this first pass for him: at 7.30am the table is waiting, and all he has to do is open the links and decide.
A scheduled task is a request ChatGPT runs on its own, at the time and frequency you choose, without you opening the app. The result arrives in a dedicated conversation, and ChatGPT alerts you by notification or e-mail, depending on your settings. The feature depends on your plan, the number of active tasks is limited, and the label may vary slightly between versions: at the time of writing, it is called “Tasks”.
What a scheduled task contains
The four-line request
Role, context, task, format, as for any request.
The period
“Published in the last seven days”, never “recent”.
Sources
Sites to consult, sites to exclude, one link per result.
The “nothing” case
What it writes when it finds nothing: one line, no padding.
The day and time
Every Monday at 7.30am, on the 25th of the month at 9am.
Whatever is missing, ChatGPT guesses, and you are not there to correct it.
What a task can do, and what it can’t see
A scheduled task works with whatever it has to hand when it runs: web search, what you wrote in the request and, depending on your plan, certain files or connected apps. It cannot see your stock, your unpaid invoices or your calendar, unless a connected app gives it access. It sends no e-mails to your customers. It is an assistant that prepares a briefing, not an employee who acts.
What can be scheduled, and what can’t
Need
Scheduled task
Why
This week’s tender monitoring
Yes
Public sources, a clear period, a table to read on Monday
Product recalls for your product families
Yes
A public website checked every week, with one link per recall
The month-end closing list, on the 25th
Yes, as a reminder
The list is written into the task; ChatGPT reorders it according to the days remaining
Stock levels every morning
No
The task cannot see your management software: it would make things up
The month’s unpaid invoice reminders
No
They require your client data and commit the company
A summary of the previous day’s e-mails
Depending on the plan
Only possible with a connected mailbox; monitor closely
What you entrust to a task
Schedule
A watch on public sources
A recall with its list written into the task
A press review of your sector
Schedule, then monitor
A summary of files or connected apps, depending on your plan
A calculation: check it every time it runs
Don’t schedule it
A dispatch, a payment, a decision
Personal data reprocessed every week
An internal figure the task cannot see
Red is never scheduled, even when the tool would allow it.
Scheduling a task, click by click
Create a task from a conversation
Open a new conversation (outside any project, unless the task needs to use its files and your plan allows it).
Write the full request, starting with the frequency and time: “Every Monday at 7.30am, …”.
ChatGPT offers to create the task and shows a summary: check the day, time and frequency before confirming.
If the summary is wrong (Tuesday instead of Monday, once instead of every week), correct it in the conversation before approving.
Read the first run as a draft to be marked, then change the request if needed.
Find, edit, pause or delete a task
Open your account menu at the bottom left, then Tasks (the label may vary slightly by version and plan).
The list shows each task, its frequency and its next run.
Open a task to change its request, day or time.
Pause a seasonal task (trade fair monitoring, for example) rather than deleting it.
Set how you are notified (notification, e-mail) in Settings, under notifications.
Writing a request that works without you
In a conversation, you are there to clarify. A task runs at 7.30am while you are on the road. Three rules follow. Everything is written down: the area, the keywords, the sources, what is excluded. The period is dated: “published in the last seven days”, otherwise you get the same results every Monday. The “nothing” case is planned for: a “Nothing new” line, rather than three off-topic results to fill the table.
Monday tender monitoring
Every Monday at 7.30am.
Role: you handle business monitoring for [company: sector, size, town].
Context: we bid for contracts for [lots or services: supply of structural building materials, exterior joinery] in [area: Gironde and Dordogne]. We are not interested in contracts under €[amount] or more than [distance] km from [town].
Task: search the web for public contract notices published in the last 7 days that match, starting with [sources: the BOAMP, the buyer profiles of local authorities in the area]. Leave out those whose deadline has already passed.
Format: a table (buyer, subject in one line, location, response deadline, link to the notice), sorted by deadline. Do not give any notice without its link. If there is nothing, write only: “Nothing new this week.”
Roughly what you should get
Every Monday, a table of zero to around ten lines, sorted by deadline, each line with its link, or just the agreed sentence. No analysis, no advice: a shortlist to open.
Open every link you keep: the official notice is authoritative, not the row in the table. That is the source check.
The month-end close reminder on the 25th of the month
On the 25th of each month at 9am.
Role: you are the assistant to the office manager of [company: sector, size, town].
Context: here is our monthly close checklist, which never changes: 1. chase missing expense claims; 2. reconcile bank statements in [software: Pennylane, Sage]; 3. prepare the variable payroll items for [payroll firm or department] before the [day]; 4. list supplier invoices not yet received; 5. prepare the dashboard for the managing director.
Task: remind me of this list, work out how many working days are left until the end of the month (in France, taking public holidays into account), and suggest a day-by-day order of work.
Format: ten lines at most, readable on a phone. No other advice.
Roughly what you should get
On the 25th, a short message: the list of five steps, the number of working days left, and an order of work across those days. The company’s figures are not included: the task cannot see them.
Check the working-day count against a calendar in the first month: that is your check on the calculations.A week with three tasks
Monday 7.30amTender watch
The week’s tender notices table, read before the sales meeting.
Wednesday 8amProduct recalls
Recalls published for the product families monitored.
Friday 4pmPreparing for Monday
The following week’s checklist, written into the task.
Le 25Month-end close
The closing steps, in order, with the working days remaining.
Three or four well-tuned tasks are worth more than ten that nobody reads.
When a scheduled task is not enough
Scheduled task, or something else
1Does the work come round on a fixed date, every week or every month?
No Keep a template prompt in your prompt library.
2Does it rely on public sources or on what is written in the request?
No It needs your data: a project, or an automation tool connected to your software.
3Can the result wait for your review before it is used?
No Don’t schedule it: anything that commits the company remains your action.
Yes to allSchedule the task, and review its first run as you would mark a paper.
When the work has to read your mailbox, your management software or a file that changes every day, then act (sort, alert a colleague, create a row), the right tool is an automation tool: Power Automate in Microsoft 365, or services such as Zapier or Make. That is a separate project, often handed to a provider, with access rights to define. A scheduled ChatGPT task, on the other hand, takes five minutes to set up and touches nothing: it prepares a briefing that you read.
Mistakes to avoid
Schedule a request that leaves gaps, such as “monitoring of tenders that might interest us”.
No one is there to answer when it runs: the task asks a question into the void or guesses your area, your lots and your exclusions.
Put everything in the request: area, services, exclusions, sources, format, and the sentence to write when there is nothing.
Asking for “recent tenders” or “the latest news”.
Without a dated period, the task finds the same results every week, including notices whose deadline has passed.
Date the period (“published in the last 7 days”) and add “exclude those whose deadline has passed”.
Believing the task can see stock, unpaid invoices or the diary, and asking it for “the morning update on our orders”.
It only sees the web, what is written in the request and, depending on the plan, certain connected apps. The rest it makes up with confidence.
Limit tasks to public sources and to lists written into the prompt. A status update on your data goes through an export or an automation tool.
Leaving tasks running that nobody reads any more, and ending up ignoring every notification.
The useful notification (a tender closing in ten days) gets lost among the others, and every useless task takes up a slot in the quota.
Review the task list every quarter; pause seasonal tasks and keep their text in the prompt library.
3 SME situations followed from start to finish: the prompts exactly as they were written, the model answer to aim for, and what was checked before sending.
Example 1
Tender monitoring for a building materials merchant
Laurent is sales manager at a 35-employee building materials merchant in Libourne. Every Monday, he spends three quarters of an hour searching for supply tenders published during the week in Gironde and Dordogne. He wants the sorting done by the time he arrives.
Monday monitoring, before and after
Before
45 minutes of searching every Monday
The same keywords typed again
Dates copied into Excel by hand
After
A table ready at 7.30am, with its links
Ten to fifteen minutes to open and decide
The request corrected once, then stable
Request 1
Every Monday at 7.30am, monitor calls for tenders for a building materials merchant.
Model answer
Task created: every Monday at 7:30am.
Tender watch, week of 16 November
Here are some public contracts that may interest a building materials merchant:
- Supply of construction materials for the technical services of a large city in Île-de-France
- Framework agreement for the supply of aggregates for a region in northern France
- Renovation works on a secondary school (structural works lot)
I recommend checking the BOAMP and regional platforms regularly.
Laurent spots three flaws: nothing for his area, a works contract that is not for him, and no link or deadline. The task did what the request allowed: it guessed.
Request 2
Replace this task’s prompt with the following, same day, same time.
Role: you monitor sales opportunities for a 35-employee building materials merchant in Libourne.
Context: we bid for public contracts to supply structural building materials, structural timber and joinery in Gironde and Dordogne. Works contracts (where installation is required) are of no interest to us, except supply-only.
Task: search for notices published in the last 7 days on the BOAMP and on the buyer profiles of local authorities in these two départements. Exclude those whose deadline has passed.
Format: a table (buyer, one-line subject, location, deadline, link), sorted by deadline. No notice without a link. If there is nothing: “Nothing new this week.”
Model answer
Task updated: every Monday at 7:30am.
Watch for Monday 23 November 2026: notices published 16 to 22 November
| Buyer | Subject | Location | Deadline | Link |
| Municipality in the Libourne area (about 9,000 residents) | Supply of materials for the technical services, one-year framework agreement | Gironde | 4 December 2026, 12pm | [notice link] |
| Social housing provider in the Bordeaux metropolitan area | Supply of exterior joinery, lot 2 | Gironde | 11 December 2026, 12pm | [notice link] |
| Inter-municipal roads syndicate | Supply of structural and formwork timber | Dordogne | 18 December 2026, 4pm | [notice link] |
Three notices this week. No works contracts selected.
The table fits on one phone screen. Laurent opens the three links before the 8.30am sales meeting and passes two of them to the assistant so she can download the tender documents.
What was checked before sending
Sources: each notice selected is opened on the official site, which alone is authoritative for the subject and deadline.
Facts: the deadline in the table is compared with the one in the notice; once in two months, it was a day out, and the notice was followed.
The scope: a works contract slipped into the table led to adding “supply only” to the request.
Typical usage: ten to fifteen minutes on Monday, including opening the links, instead of three quarters of an hour.
Example 2
Product recalls for a cannery
Mehdi is quality, health, safety and environment manager at a 60-employee cannery in southern Gironde. He needs to know quickly whether a product recall involves a raw material or packaging similar to his own. He checks the public recalls website when he remembers, which is not often enough.
Recall monitoring, every Wednesday
18am, the task runs
Recalls from the last 7 days for the families monitored.
2Reading the spreadsheet
A source column to sort in ten seconds.
3Official sheet open
Only the form is authoritative.
4Mehdi’s decision
Query a supplier, note it in the register, or do nothing.
Request 1
Every Wednesday at 8am.
Role: you handle quality monitoring for a 60-employee vegetable and ready-meal cannery in Gironde.
Context: we track product recalls published in France on the official RappelConso website. Product families tracked: canned vegetables, sterilised ready meals, pulses, and recalls linked to metal packaging (cans, lids).
Task: list the recalls published in the last 7 days that affect these families.
Format: a table (publication date, product and brand, reason for recall in one line, link to the notice). If there is nothing: “No recalls for your product families this week.” Do not comment on health risks.
Model answer
Quality watch for Wednesday 18 November 2026: recalls published 11 to 17 November
| Published | Product | Reason | Link |
| 12 November | Extra-fine canned green beans, own brand | Faulty seal on some cans | [link to notice] |
| 16 November | Ready-cooked lentils in jars | Possible presence of foreign bodies | [link to notice] |
Two recalls this week in the product families you follow.
Mehdi opens both notices. The first recall concerns a sealing defect: he asks his can supplier, which is not affected, and records the exchange in his register.
Request 2
Add to this task’s request: for each recall, state in an extra column whether the reason concerns a raw material, packaging or the manufacturing process, based on the text of the notice. If the notice doesn’t say, write “not specified”.
Model answer
Task updated.
From the next run, the table will have five columns: publication, product, reason, origin (raw material, packaging, process or not specified), link.
The source column lets him see in ten seconds what concerns him. He keeps the rule: the official sheet is read every time, and the column is only for sorting.
What was checked before sending
Sources: each row links to its official notice, opened before any decision.
Facts: one week, a recall was dated on the day it was updated rather than published; Mehdi goes by the date on the notice.
Tone: the request forbids any health commentary, which is Mehdi’s job, not an automatic summary’s.
A watch done every week instead of whenever he remembers, for five minutes’ reading on Wednesday.
Example 3
Monday preparation at an architecture practice
Claire is executive assistant at a 9-person architecture practice in Bordeaux. On Friday afternoons she prepares the following week with the same checklist, which she rarely finds in the same place. She wants the list to come to her, in the right order.
Claire’s Friday
15 h 30The list arrives
Six lines, most urgent first.
Before 5pmConfirmations go out
Site meetings, rooms, leave.
Monday 9amTeam meeting
Outputs checked, attendance sheet ready.
Request 1
Every Friday at 3.30pm.
Role: you are the assistant to the executive assistant of a 9-person architecture practice in Bordeaux.
Context: my checklist for preparing the following week is always the same: 1. check the week’s submissions (competitions, planning permissions, tender documents) in the practice schedule; 2. confirm site meetings with the site managers; 3. check the rooms booked for client meetings; 4. chase overdue fee invoices; 5. prepare the attendance sheet for the Monday 9am team meeting.
Task: remind me of this list, putting first what must be done before 5pm today.
Format: eight lines at most, one tick box per line.
Model answer
Preparation for the week of 23 November
Before 5pm today:
[ ] Confirm this week’s site meetings with the site managers
[ ] Check the rooms booked for client meetings
Before 9am Monday:
[ ] Check this week’s deliverables in the schedule (competitions, planning permits, tender documents)
[ ] Chase overdue fee invoices
[ ] Prepare the attendance sheet for the team meeting
Claire keeps the suggested order: site confirmations go out before the site managers leave their offices. She adds a line she had forgotten: the reminder of booked leave.
Request 2
Add a sixth line to this task’s list: “check leave booked for the following week and notify the project managers concerned”. Keep everything else exactly as it is.
Model answer
Task updated: every Friday at 3:30pm, the list will have six lines, with the leave check placed before 5pm.
The list now lives in one place, the task, and Claire keeps a copy in the firm’s request library for her stand-in while she is on leave.
What was checked before sending
Facts: the task cannot see the firm’s schedule; it reminds you to check it, it does not give its content.
Tone and audience: a list readable on a phone, with no pleasantries or added advice.
The same list every Friday, without having to look for it, and roughly one fewer oversight a month.
You are Isabelle, executive assistant at a 50-employee civil engineering firm in Saint-Médard-en-Jalles. Three jobs keep coming back: monitoring calls for tender for roads and utility networks on Mondays, the month-end closing checklist on the 25th, and preparing the Friday 2pm management committee meeting (standard agenda, items to collect from heads of department). Write and schedule the three tasks, then prepare the review of their first run. If your plan doesn’t offer scheduled tasks, write the three requests and run them manually on the planned date.
For each job, use the decision chart to check that it can be scheduled.
Write each request in four lines, with the day, the time, the period and the “nothing” case.
Create the tasks, read the suggested summary (day, time, frequency) and correct it if needed.
Find the three tasks in your account’s task list.
Prepare the review checklist for the first run: links, dates, calculations, tone.
See the answers
The three expected tasks
Task
When
What it contains
What stays with Isabelle
Roads and utilities watch
Monday 7.30am
Area, lots, minimum amount, sources, 7-day period, table with links
Open the selected notices and pass them on to the bid officer
Month-end close
On the 25th at 9am
The list of steps written into the task, the count of working days
Check the count, tick off the steps in the real tracker
Friday committee
Wednesday 9am
The standard agenda, the list of items to ask each head of department for
Send the request for agenda items herself, then complete the agenda
The committee task, two days before
Every Wednesday at 9am.
Role: you are the assistant to the executive assistant of a 50-employee civil engineering company in Gironde.
Context: the management committee meets every Friday at 2pm, for one hour. The standard agenda: 1. site safety; 2. order book and current tenders; 3. team and equipment schedule; 4. HR matters (no names); 5. any other business. The department heads are: works, design office, equipment, administration.
Task: draft the message I will send myself to the four department heads to collect their items before Thursday 12pm, then the outline of Friday’s agenda, with this Friday’s date.
Format: first the message, eight lines at most, formal tone; then the agenda in five sections, with [TO BE COMPLETED] under each. Do not add any item I have not given you.
Roughly what you should get
On Wednesday, a short, polite collection message, ready to copy into Outlook, then a dated agenda in five sections, each marked [TO COMPLETE].
Why Wednesday and not Friday: the task prepares the collection, which takes time. Scheduled for Friday at 1pm, it would arrive too late to be useful. Choose a task’s time according to when its result needs to be read, not when the meeting takes place.
A watch with no period: every Monday, the same notices come back, and the task loses its point.
A closing checklist containing the month’s amounts: they change, the task cannot see them, and it would copy them out wrong.
Accepting the task summary without reading it: a “once only” in place of “every week” goes unnoticed until the following Monday.
Practise
Three more exercises, from the most guided to the most demanding. The material is provided in full: copy it into your tool, then check your work against the criteria before opening the answers.
Level 1 · guided10 min
Rewrite a task that is too vague
Here is a scheduled task request written by the manager of a 14-employee landscaping company in Mérignac, along with the details he gave you verbally. Rewrite the request so that it stands on its own, in four lines, with the day, the time, the period, the sources and what to do if there is “nothing”. Follow the order: Role, Context, Task, Format.
The material to work on
Current task request:
“Every week, give me a watch on public contracts for green spaces.”
Details given verbally by the manager:
- We do green-space maintenance, tree pruning and flowerbed planting.
- Area: Bordeaux Métropole and the southern Médoc, no further than 40 km from Mérignac.
- No road works or lighting contracts, even if there is a “planting” lot within them.
- I read the watch on Monday morning before 8am, on my phone, in the van.
- I want the deadline and the link, nothing else.
Check your work
The request starts with the day and time (Monday, before 8am).
The area and services are written down, along with the exclusions.
The period is dated (the last 7 days) and expired notices are excluded.
The format fits on a phone: short table, link and deadline.
The “nothing” case is covered by an exact sentence.
See the answers
The rewritten task
Every Monday at 7am.
Role: you handle business monitoring for a 14-employee landscaping company in Mérignac.
Context: we do green space maintenance, tree pruning and planting of flower beds, within Bordeaux Métropole and the southern Médoc, no more than 40 km from Mérignac. We are not interested in road or lighting works contracts, even with a planting lot.
Task: find the public contract notices published in the last 7 days that match. Leave out those whose deadline has passed.
Format: a three-column table (subject in one line, deadline, link), sorted by deadline, readable on a phone. If there is nothing: “Nothing new this week.”
Roughly what you should get
Every Monday at 7am, a short table of a few lines with one link per notice, or just the agreed sentence.
The time is set to 7am, not 8am: the manager reads before 8am, so the result must be waiting for him. The exclusions are written out in full, because a roadworks contract with a planting lot is exactly what a search for “green spaces” brings up.
Level 2 · independent20 min
Sort a list of recurring tasks
Here is the list of recurring jobs noted down by the office manager of a temping agency with 10 permanent staff in Bègles. Classify each one as green (to schedule), amber (to schedule and monitor, depending on the plan) or red (not to schedule), with a one-line reason. Then write the full request for the two green tasks you think are most useful.
The material to work on
The agency’s recurring tasks (office manager’s notes)
1. Every Monday: look for job fairs and recruitment events planned in Gironde over the next two months.
2. Every day: send temporary workers a reminder of the next day’s assignment, with address and hours.
3. On the 20th of each month: send a reminder of the timesheets to collect before payroll (always the same steps).
4. Every Friday: review the assignments ending the following week, using our management software.
5. Every month: list the updates published on the official Ministry of Labour website about temporary work.
6. Every week: summarise client emails left unanswered for 48 hours.
7. Every quarter: send a reminder to review access to tools (ChatGPT, management software, email).
Check your work
The daily reminder to temporary staff is classed red: it sends something, with personal data.
The Friday update is classed red or amber: the task cannot see the management software.
The email summary is classed amber: it depends on a connected mailbox, depending on the plan.
Both written requests state the day, time, period or list, format and the “nothing” case.
No request contains a temp worker’s name, address or phone number.
See the answers
The expected classification
Work
Colour
Reason
1. Trade shows and fairs
Green
Public sources, clear period
2. Assignment reminder to temporary workers
Red
A mailing to people, with their addresses and hours
3. Pre-payroll list for the 20th
Green
The list is fixed and is written into the task
4. Assignments coming to an end
Red
The task cannot see the management software: an export or an automation tool
5. News from the Ministry of Labour
Green
One official website, a one-month period, one link per new item
6. Unanswered e-mails
Orange
Only with a connected inbox, depending on the plan; check carefully
7. Access review
Green
A recall, with the list of tools written into the task
Monitoring trade shows and fairs
Every Monday at 8am.
Role: you handle monitoring for a temping agency with 10 permanent staff in Bègles.
Context: we take part in job fairs, recruitment forums and job dating events in Gironde, mainly in logistics, construction and industry.
Task: list the events of this kind planned in Gironde over the next two months, announced on official or organisers’ websites (local authorities, France Travail, chambers of commerce and trades). Do not include an event that has already taken place.
Format: a table (date, venue, event name, sectors, registration or information link), sorted by date. If there is nothing new since last week, write: “No new events.”
Roughly what you should get
Every Monday, a table of a few dated events with their links, or the agreed sentence.
The pre-payroll reminder on the 20th
On the 20th of each month at 9am.
Role: you are the assistant to the office manager of a temping agency.
Context: before payroll, we always collect, in this order: 1. timesheets signed by clients; 2. bonuses and allowances declared by recruitment consultants; 3. reported absences and sick leave; 4. requested salary advances.
Task: remind me of these four steps and the number of working days until the end of the month.
Format: six lines at most, one checkbox per step. No names.
Roughly what you should get
On the 20th, a six-line message: four steps to tick off and the count of working days.
Level 3 · demanding case30 min
Review a run and fix the task
A 20-employee joinery firm in Léognan has scheduled a watch on calls for tenders. Here are the task’s request and its latest run. Review the run using the four checks: find every row that causes a problem and say why. Then rewrite the task’s request so these problems don’t happen again, and write the review checklist the assistant will apply every Monday.
The material to work on
Task request:
“Every Monday at 7.30am, look for recent joinery tenders in Gironde and give me a table.”
Last run, Monday 16 November 2026:
Joinery watch, Gironde
| Buyer | Subject | Deadline | Link |
| Right-bank municipality | Replacement of the primary school’s external joinery | 6 November 2026 | [link] |
| Social housing provider | Internal timber joinery, 40-home residence | 4 December 2026 | [link] |
| Bassin community of municipalities | Supply and installation of aluminium joinery, media library | 11 December 2026 | no link |
| Right-bank municipality | Replacement of the primary school’s external joinery | 6 November 2026 | [link] |
| Neighbouring département (Landes) | Joinery for a secondary school | 15 December 2026 | [link] |
These contracts represent great opportunities for your business. I recommend responding quickly to the media library one, which is often less competitive.
Check your work
The row with a passed deadline (6 November) is flagged, as is its duplicate.
The row with no link is set aside until the notice is found.
The out-of-area row (Landes) is flagged.
The final advice (“often less competitive”) is flagged as an unsourced claim.
The rewritten request dates the period, requires a link, rules out past dates and forbids advice.
The review checklist has four or five points, one per check.
See the answers
Problems with the run
Line
Problem
Inspection
Primary school (twice)
Deadline already passed at run time, and a duplicate
The facts
Media library
No link: the review cannot be verified
Sources
Secondary school (Landes)
Outside the requested area
The facts
Final tip
“Often less competitive”: an unsourced claim, and not the job of this task
Tone and audience
The fixed request
Every Monday at 7.30am.
Role: you handle business monitoring for a 20-employee joinery company in Léognan.
Context: we bid for contracts to supply and install interior and exterior joinery (timber, aluminium, PVC), in Gironde only.
Task: find the notices published in the last 7 days. Leave out any notice whose deadline is before today, any notice outside Gironde, and any notice you cannot give the link for. Do not list the same notice twice.
Format: a table (buyer, subject in one line, town, deadline, link), sorted by deadline. No comments or advice. If there is nothing: “Nothing new this week.”
Roughly what you should get
A table with no duplicates, no expired notices, no row without a link, or the one sentence planned for that case.
Facts: every deadline is later than today, every municipality is in Gironde.
Sources: each row selected has a link, opened before passing it on.
Calculations: none here; if an amount appears, it is read from the notice.
Tone: no advice or judgement added; if any appears, the request is corrected.
The final advice is the subtlest symptom. It is not wrong in itself; it is unverifiable, and it steers a commercial decision. A scheduled task sorts; it does not recommend.
A two-page policy for your company, to complete in Word: authorised tools, prohibited data, review, disclosure of use, named contact, training and Article 4 of the AI Act.
Every request to copy from the course, including answers, practical examples and practice exercises, arranged by module and lesson, with filters to find the right one.
For each lesson, the main exercise and the three graded practice exercises with their materials, to do on paper or alongside ChatGPT; all the answers are grouped together at the end.
The course’s practical examples, job by job: the situation, the requests as they were written, the standard replies obtained and what was checked before using them.
The use cases from the twelve job-specific lessons in a filterable table: the lesson, the standard request and the data risk level (green, amber, red) with the precaution to take.
All the lessons in a single PDF: objectives, written course with its diagrams, tables and requests, common mistakes, exercise and key takeaways. The practice exercises and answers are in the workbook, the examples in the collection.
Your notes stay on this device; they are not sent anywhere.
A question for the tutor
A result that doesn’t match the model answer, a prompt that gets you nowhere, a case specific to your business: write to us with your prompt and the response you got. A Bonbay Académie trainer replies within 24 working hours, on your case.