Lesson 41, module 10: Other professions Industry and quality: procedures, non-conformities, job sheets and operator training A work instruction, a complaint, a setter leaving. Where do you start? The work instruction from the workstation The non-conformity and its causes Operator training The know-how comes from the operator; ChatGPT puts it in order. [Diagram: From operator to work instruction] 1. The task dictated 2. Formatting 3. Review at the workstation 4. Approval 5. Posting up The know-how comes from the operator; ChatGPT puts it in order, the shop floor approves it. Two minutes' dictation at the workstation become a numbered work instruction. Prompt: You're a methods technician. Here's the dictation of a setter changing a mould. Put it into numbered steps, with for each the key point and its reason. Add no steps. Response: Twelve to fifteen short steps, a key point and its reason for each, safety instructions up front, and the list of unclear passages for the setter to clarify. A non-conformity report is filled in with facts, layer by layer. [Diagram: The non-conformity report] The finding The immediate action Root cause analysis Corrective actions Effectiveness check Each layer is filled in with facts; a hypothesis is written as such. For the causes, get yourself questioned: ChatGPT asks the whys, the shop floor answers. One question at a time Every answer checked on the shop floor No cause concluded without proof Train first where only one operator can run a critical workstation. [Diagram: Where to train first] Vertically, workstation criticality; horizontally, trained operators. To maintain To document In order Priority: Risk of stoppage Cross-check each workstation's criticality with the number of operators who can run it. Customers' drawings and your settings stay in the factory. Non-disclosure agreement first Customers referred to by their sector Operators referred to by a code Exercise: twelve out-of-tolerance rings at an aerospace customer. Your turn: Twelve out-of-tolerance rings The written lesson, the corrected exercise and the quiz are below the video.
Lesson 41 of 54 · module 10, other roles
Industry and quality: procedures, non-conformities, job descriptions and operator training
On the shop floor, ChatGPT turns an experienced operator’s dictation into a clear operating procedure, structures a non-conformity report, helps find root causes by asking questions, sorts scrap in code and prepares job sheets and training materials. It knows neither your machines nor your customers: the shop floor checks, quality signs off.
39 min of reading
1 min 50 of video
8 diagrams
10 demandes to copy
3 exemples pratiques
4 exercices answerss
5 questions
1 ressource
By the end of this lesson, you will know how to
Write a work instruction from an operator’s dictation, reread at the workstation before approval
Fill in a non-conformity report and run a root-cause analysis in which every answer is checked
Prepare a job description, a training questionnaire and a training plan based on critical workstations
What’s covered
Work instructions, from the workstation
Non-conformities
Job descriptions and operator training
3 worked examples, followed from start to finish
Exercise with answers · Twelve rings out of tolerance
3 practice exercises, from guided to demanding cases
The quiz
Key points
The know-how comes from the operator; ChatGPT puts it in order, and the operating procedure goes back to the workstation before approval.
No setting value or safety instruction comes from ChatGPT: they come from the workshop, the manual and the document unique (the mandatory workplace risk assessment).
ChatGPT asks the whys; the cause is proven on the shop floor, by measurement.
A Pareto chart ranks by count: a rare but serious defect gets dealt with whatever its rank.
Customer drawings under NDA, machine settings and named appraisals stay in the factory.
In an industrial SME, quality and methods often come down to two or three people, who write a great deal: work instructions, non-conformity reports, replies to complaints, workstation sheets, training materials. The knowledge, however, is on the shop floor, in the heads of operators who have neither the time nor the inclination to write. ChatGPT bridges the gap: it formats what an operator says, structures an analysis, counts defects in code. It knows neither your machines, nor your tolerances, nor your customers, and it readily settles on a plausible cause. The rule of this lesson: nothing gets posted or sent to a customer without being checked on the shop floor.
Quality and methods tasks, the request to use and the check to make
Task
Lesson request
Usual time
With ChatGPT
Check to carry out
Write a work instruction
The work instruction from the dictation
3 h
1 hour, including review at the workstation
Checked at the workstation by the operator
Simplify a workstation instruction
The instruction in plain French
1 h
15 min
Approved by the safety manager
Fill in a non-conformity report
The sheet from the notes
45 min
15 min
Every fact checked with the team leader
Look for the causes
The five whys as an interview
1-hour meeting
30 min, with the team
Every answer checked on the shop floor
Sort the month’s rejects
The defect Pareto
2 h
20 min
Two counts recalculated in Excel
Prepare on-the-job training
The questionnaire and the grid
half a day
1 h
Checked by the workstation mentor
Work instructions, from the workstation
From the operator to the work instruction
1The dictated procedure
The most experienced operator explains while working
2The formatting
Numbered steps, key points, reasons
3Proofreading at the workstation
By the operator and the workstation supervisor
4Approval
By the quality team, with a revision number and a date
5Display
At the workstation, with photos of the action
The know-how comes from the operator; ChatGPT puts it in order, the workshop approves it.
Dictate a work instruction at the workstation
Somewhere quieter, near the workstation, open the ChatGPT app on the phone.
Tap the microphone in the input field and let the operator explain what they do, step by step, in their own words and with their reasons.
Take separate photos of the hands and the machine, with no faces or customer drawings visible.
Read through the transcript with the operator, then paste the request below.
The label may vary slightly depending on the version.
The work instruction from a dictation
Role: you are a methods technician at a [sector] SME and you write operating procedures that operators read at their workstation.
Context: here is the dictation from [the operator's job title, for example the most experienced setter], explaining [the operation] on [the machine, identified by its type and internal number]: [paste the transcript]. The workstation safety instructions, taken from the document unique (the employer's mandatory risk assessment) and the machine manual: [paste them].
Task: write the operating procedure. Use only the steps in the dictation, in order; for each one, give the key point and the reason for it where the operator gave one. Put the safety instructions first. Do not add any step, setting value or instruction that does not appear above. Where a passage is unclear, write “to be clarified”.
Format: a header (operation, machine, revision, date, written by, approved by), a table (no., step, key point, reason, photo needed), then the list of “to be clarified” items.
Roughly what you should get
A document of one to two pages, short steps starting with an action verb, a “photo needed” column and a list of questions for the operator. The document goes back to the workstation before sign-off: the operator is the one who spots the missing step.
The instruction in plain French, then translated
Role: you write workstation instructions for operators who have limited reading skills in French.
Context: here are the current instructions for the [workstation name] station: [paste them]. They are considered too long. Some operators on the team mainly speak [languages].
Task: rewrite the instructions in sentences of ten words or fewer, one action per line, in the present tense, verb first. Keep every safety instruction, without removing or softening any of them. Then translate the simplified version into [languages]. Flag technical words with no reliable equivalent.
Format: the simplified version as numbered lines, then each translation, then the flagged words and a suggested pictogram for each safety line.
Roughly what you should get
An instruction of ten to fifteen short lines, its translations and a few words flagged. Each translation is checked by someone who speaks the language, ideally an operator in the team, before it is posted.
Non-conformities
The non-conformity report
The findings
What, where, when, how many, detected by whom (by job title).
The immediate action
Sorting, holding and quarantining suspect parts.
The root cause analysis
Five whys or 5M, each answer checked on the shop floor.
Corrective actions
Who, what, by when.
The effectiveness check
The measurement that will show whether the cause has gone.
Each layer is filled with facts; an assumption is written as an assumption.
The non-conformity report from the notes
Role: you are a quality technician and you are filling in a non-conformance report.
Context: here are the notes from the [job title, for example night-shift team leader]: [paste the notes]. Internal part reference: [code]. Customer: [identified by sector].
Task: fill in the sections findings, immediate measure, cause analysis, corrective actions and effectiveness check. In the findings, use only the facts in the notes (what, where, when, how many, detected by whom). Do not conclude on any cause: in the analysis section, list the possible causes to check and, for each, the check to carry out in the workshop.
Format: a report in five sections, then the list of information missing from the notes.
Roughly what you should get
A readable report, a factual finding, hypotheses presented as such with how to check them, and a list of gaps (exact quantity sorted, batch number, time of detection). The actions and effectiveness sections are to be completed after the analysis.
The five whys, by being questioned
Role: you are leading a root-cause analysis using the five whys method, with a workshop supervisor.
Context: the non-conformity is as follows: [finding from the report]. I answer your questions with the team, standing at the machine.
Task: ask me one “why” question at a time and wait for my answer. After each answer, ask me how the fact was verified; if I answer “I think”, record it as a hypothesis to verify. Stop when we reach a cause we can act on, or after seven questions.
Format: one question at a time. At the end, a table (why, answer, verified or hypothesis, evidence), then two possible actions on the last verified cause.
Roughly what you should get
An exchange that moves at the pace of your answers, then a table in which each answer is marked verified or assumption. This is the method from the lesson “Get ChatGPT to question you before it writes”: it doesn’t draw conclusions, it makes you check.
The month’s defect Pareto
Role: you are quality manager and you are analysing scrap.
Context: the attached file is the export for [period]: date, line or machine, defect code, defect description, quantity scrapped. No operator names.
Task: by running code, calculate for each defect the quantity scrapped, its share of the total and the cumulative share, sorted from largest to smallest, with “other” last. Then the same by machine. Flag any rare but serious defect (safety, food contact, customer) to be dealt with whatever its rank.
Format: two tables, a Pareto chart as an image, three one-sentence findings.
Roughly what you should get
Two sorted tables, a chart and three findings. Recalculate two totals in Excel with a filter, and read the line for rare but serious defects: a Pareto ranks by count, not by severity.
The continuous improvement wheel
1Schedule
The problem measured, the target quantified, the action chosen
2Do
The action, on one workstation or team first
3Check
The measurement after, compared with the measurement before
4Adjust
Roll out, or revisit the analysis
A method commonly used in quality: ChatGPT helps write each step, the measurements come from the shop floor.
Replying to a customer complaint, using 8D
Role: you are quality manager at a subcontractor and you are preparing the 8D response to a customer complaint.
Context: complaint received on [date] from a customer in the [sector] sector: [paste the complaint, without the customer’s name or drawing reference]. Our non-conformity report: [paste it]. Actions already taken: [sorting, quarantine, notification].
Task: complete the eight steps of the 8D method: team, problem description, containment actions, root causes, chosen corrective actions, implementation, prevention of recurrence, closure. Complete only what our documents allow; for the steps we have not yet done, write “in progress, due [date]”. No cause, action or date that is not in our documents.
Format: a table of the eight steps (step, content, owner by function, date), then a six-line covering email.
Roughly what you should get
An 8D with the first steps completed and the next ones marked “in progress” with their deadlines. An honest, partial 8D is better than a complete one whose cause has not been verified: the customer will reread both.
Job descriptions and operator training
An operator’s job description
Role: you write job descriptions for an industrial [sector] SME with [number] employees.
Context: job: [title], working [hours, for example two rotating eight-hour shifts]. What the post holder does, according to the workshop manager: [list of activities]. Machines and tools: [types]. Certifications required: [for example forklift operation, working at height, according to your training plan]. Reports to: [manager's job title].
Task: write the job description: two-line mission statement, main activities, quality and safety responsibilities, skills and certifications, working conditions, indicators tracked at the workstation. Do not invent any certification or requirement that is not listed here.
Format: one page in sections, then the questions to ask the workshop manager to complete it.
Roughly what you should get
A one-page description, activities starting with an action verb, authorisations taken only from your list, and a few questions for the workshop manager.
The questionnaire and the workstation assessment grid
Role: you are an in-house trainer at an industrial SME.
Context: here is the approved standard operating procedure for workstation [name], revision [revision]: [paste it]. A new operator is completing their training period at the workstation with their mentor.
Task: prepare ten multiple-choice questions on the key points and safety, each with the correct answer and the reason, taken from the operating procedure, then a practical assessment grid: the actions to observe, what is expected, and what is an automatic fail. All questions and criteria must come from the operating procedure.
Format: the ten questions, then the grid as a table (action, expected, automatic fail yes or no, mentor’s observation).
Roughly what you should get
Ten scenario-based questions and a one-page checklist the trainer fills in at the workstation. The decision to sign off the operator lies with the trainer and the manager; the checklist prepares it.
Where to train first
forteCriticality of the workstationfaible
Downtime risk
Only one operator knows how: train a second as a priority, with an up-to-date work instruction.
To maintain
Authorisations to renew, regular workstation audits.
To document
A simple work instruction, training when the need arises.
In order
Nothing to do, except updates.
only oneTrained operatorsplusieurs
Cross-reference the criticality of each workstation with the number of operators who can run it.
What leaves the factory, what stays inside
No particular precautions
Your operating procedures and instructions, without customer drawings
A non-conformance described without customer or drawing reference
An export of scrap by machine, with no operator names
With management’s approval
A customer complaint, customer identified by sector
A photo of a part, with no marking or customer reference
The training plan, with operators identified by a code
Never
Drawings and specifications covered by a non-disclosure agreement
The settings and processes that make up your know-how
Operators’ individual assessments and authorisations
A non-disclosure agreement signed with a client takes precedence over any account setting.
Mistakes to avoid
Asking “what is the cause of this defect?” and entering the answer in the report.
ChatGPT sees neither the machine, nor the parts, nor the settings; it suggests the cause most common in its texts, presented as a certainty.
Have it question you with the five whys, check each answer on the shop floor and record as a cause only what is proven.
Having a “complete” safety instruction sheet written from the job title alone.
It produces a generic instruction that misses the risks specific to your machine or invents others; a wrong instruction posted at the workstation commits the company.
Start from the risk assessment document (document unique), the instructions and the safety data sheet, ask for a rewording with nothing added or removed, and have the safety manager approve it.
Attaching the customer’s drawing to analyse a non-conformity.
Drawings are often covered by a non-disclosure agreement, and a drawing sent to an online service can cost you a customer.
Describe only the characteristic concerned, its dimension and tolerance, with the customer identified by sector.
Putting up a formatted operating procedure without reviewing it at the workstation with the operator.
Dictation always misses a step that is obvious to the person doing it, and ChatGPT can fill a gap with a plausible value or action.
Read through the document at the workstation during the next operation, with the operator, then put it through your approval process, revision and date included.
3 SME situations followed from start to finish: the prompts exactly as they were written, the model answer to aim for, and what was checked before sending.
Example 1
Isabelle writes the operating procedure for a mould change
Isabelle is a methods technician at a plastics processor with 120 employees in Châtellerault. A mould change on press no. 7 takes anywhere from 50 minutes to nearly two hours, depending on the setter. The fastest setter retires in six months, and she wants a written operating procedure based on how he does it.
Isabelle’s work instruction
MondayDictation
During an actual mould changeover
MondayThe formatting
Fourteen steps, eleven “to be specified”
WednesdayProofreading at the workstation
A step added, the tightening sequence given
ThursdayApproval
Safety and quality, revision B
FridayDisplay
The one-page sheet and the photos
Request 1
Role: you are a process engineering technician at a plastics processor and you write operating procedures to be read at the workstation.
Context: here is the dictation from the most experienced setter, made during a mould change on injection moulding press no. 7: “Right, first I get everything ready before stopping: the next mould is on the trolley beside it, the clamps, the water hoses, the setting sheet. Then I stop the press at the end of the cycle, I empty the screw by purging, and I lock out, padlock on the isolator, my name on the tag. I disconnect the water, I purge the circuits with air so it doesn’t go everywhere. I attach the hoist, I loosen the clamps on the fixed side and the moving side, I take the mould out. The new one, I centre it with the locating ring, I tighten the clamps, I reconnect the water, I check there are no leaks. I remove the lockout, I load the program, I set the opening strokes. The first five parts I throw away, the sixth I take to quality for first-part approval.” Workstation safety instructions, taken from the risk assessment document (document unique): lockout mandatory before any work in the mould area; gloves and safety glasses; mould handling by hoist only; nobody under the load.
Task: write the operating procedure from the dictation alone, safety instructions first, with for each step the key point and its reason when the setter gives it. Do not add any step or value. Write “to be specified” where a passage is unclear.
Format: a header, a table (no., step, key point, reason, photo needed), then the “to be specified” items.
Model answer
Mould change · injection press no. 7
Revision A · written by: methods technician · approved by: to be completed · date: [date]
Safety, before any work
- Lock out the press before any work in the mould area.
- Wear gloves and safety glasses.
- Handle the mould with the hoist only; nobody under the load.
No. | Step | Key point | Reason | Photo needed
1 | Prepare the next mould, the clamps, the water hoses and the setup sheet | Everything is beside the press before the stop | Avoid looking for equipment while the press is stopped | Prepared trolley
2 | Stop the press at the end of the cycle | End of cycle, not mid-cycle | to be specified | Control panel
3 | Purge the screw | Screw empty | to be specified | —
4 | Lock out the press | Padlock on the isolator, name on the tag | Safety of the person working | Locked-out isolator
5 | Disconnect the water and blow the circuits out with air | Blow out with air before removing the hoses | Avoid spilling water | Couplings
6 | Position the hoist, loosen the clamps on the fixed and moving sides | Hoist in place before loosening | to be specified | Clamps
7 | Remove the mould | With the hoist, nobody under the load | Safety | —
8 | Centre the new mould with the locating ring | Ring engaged | to be specified | Locating ring
9 | Tighten the clamps | to be specified (order and torque) | to be specified | Clamps tightened
10 | Reconnect the water and check for leaks | Visual check of the couplings | to be specified | Couplings
11 | Remove the press lockout | Padlock removed by the person who fitted it | to be specified | —
12 | Load the program and set the opening strokes | Program from the setup sheet | to be specified | Screen
13 | Set aside the first five parts | Parts scrapped | to be specified | —
14 | Take the sixth part to quality | First-part approval | Start-up authorised after approval | —
To be specified with the setter
- Why stop at end of cycle and purge the screw: the reasons to write down for operators.
- Clamp order and torque: value to take from the mould or press manual.
- Who removes the padlock if the work changes hands.
- What quality checks on the first part.
Isabelle reviews the document at the workstation with the setter during the next change. He adds a step he left out of his dictation, cleaning the parting lines, and gives the tightening sequence. The tightening value is taken from the mould’s manual.
Request 2
Now, using this corrected work instruction, write a one-page sheet to post on the press: fourteen lines at most, one action per line, starting with a verb, and a suggested pictogram for each safety line. Keep all the safety instructions.
Model answer
MOULD CHANGE · PRESS 7
Safety
1. Lock out before any work in the mould area. (pictogram: padlock)
2. Wear gloves and safety glasses. (pictogram: gloves, glasses)
3. Handle the mould with the hoist, nobody under the load. (pictogram: suspended load)
Steps
4. Prepare mould, clamps, hoses and sheet before the stop.
5. Stop at end of cycle, purge the screw.
6. Lock out: padlock, name on the tag.
7. Blow the water out with air, disconnect.
8. Loosen the clamps, lift the mould out with the hoist.
9. Clean the parting surfaces.
10. Centre the new mould with the locating ring.
11. Tighten the clamps in the order on the sheet.
12. Reconnect the water, check for leaks, remove lockout.
13. Load the program, set the strokes.
14. Set aside five parts, take the sixth to quality.
The safety manager approves the first three lines and the pictograms. The sheet is put up at revision B with the setter’s photos.
What was checked before sending
The facts: the operating procedure reviewed at the workstation, one step added by the setter.
The values: the flange sequence and tightening taken from the manual, no value from ChatGPT.
Safety: the instructions come from the risk assessment document (document unique) and are approved by the safety manager.
An hour and a half for an approved operating procedure, instead of half a day of writing that nobody found the time for, before the setter left.
Example 2
Sébastien sorts six weeks of rejects
Sébastien is quality manager at a 35-employee biscuit maker in Charente. Rejects have risen since September, and everyone has their own explanation. He exports six weeks of inspections from the production software: 386 coded non-conformities, with no operator names.
Sébastien’s scrap
1The export
386 non-conformities, no names
2The Pareto in code
Three defects account for 80%
3The serious defect
Metal detector dealt with first
4The improvement wheel
An action tested on line 2
Request 1
Role: you are quality manager at a biscuit factory and you are analysing scrap.
Context: the attached file is a six-week export: date, line, defect code, description, quantity. 386 non-conformities, no operator names.
Task: by running code, calculate for each defect the number of non-conformities, its share and the cumulative share, sorted from largest to smallest, with “other” last. Do the same by line. Flag any rare but serious defect, to be dealt with whatever its rank.
Format: two tables, a Pareto chart, three findings.
Model answer
By defect
Defect | Non-conformities | Share | Cumulative share
Weight out of tolerance | 142 | 36.8% | 36.8%
Overbaked | 97 | 25.1% | 61.9%
Broken biscuits | 71 | 18.4% | 80.3%
Misapplied label | 44 | 11.4% | 91.7%
Metal detector reject | 9 | 2.3% | 94.0%
Other | 23 | 6.0% | 100.0%
Total | 386 | 100% |
By line
Line 2: 231 (59.8%); line 1: 155 (40.2%).
Rare but serious defect
The 9 metal detector rejects concern consumer safety: analyse them first, whatever their rank.
Findings
1. Three defects account for 80% of non-conformities: weight, baking, breakage.
2. Line 2 accounts for six non-conformities in ten.
3. Metal detector rejects are few but require immediate analysis.
Sébastien filters the export in Excel on “weight” and on line 2: 142 and 231, identical. That same day he opens a non-conformity report on the metal detector rejects, before tackling weight.
Request 2
For the out-of-tolerance weight, help me prepare the first round of the improvement cycle: plan, do, check, act. What we know: 142 non-conformities in six weeks, most of them on line 2; the line 2 filler was serviced in August. Target: halve it in six weeks. For each step, what needs doing, who (by job title), and the measure. No cause concluded.
Model answer
Plan
- Confirm the breakdown of the 142 non-conformities by line and by shift (quality manager, this week).
- Gather hypotheses with the line operators: doser setting after the overhaul, raw materials, dough consistency, check-weighing (production manager).
- Choose one action to test on line 2 only.
Baseline: 142 non-conformities in six weeks, i.e. about 24 a week.
Do
- Apply the action on line 2 for two weeks (production manager, line 2 operators).
Check
- Count weight non-conformities on line 2 each week and compare them with the baseline (quality manager).
Act
- If the number falls clearly, extend the action to line 1 and write it into the operating procedure; if not, revisit the hypotheses (end-of-month quality committee).
Target: no more than 12 non-conformities a week after six weeks.
He checks the starting average: 142 divided by 6, or about 24 a week. He keeps the structure and chooses the action to test with the line operators: more frequent weight checks after each restart of the dosing machine.
What was checked before sending
The calculations: two counts redone with an Excel filter, the weekly average recalculated by hand.
Severity: the rare but serious defect is dealt with first, despite its rank in the Pareto.
The facts: no cause accepted before the test on line 2.
Twenty minutes for a Pareto chart that used to take a morning of pivot tables, and a team discussion that started from the figures instead of everyone’s explanations.
Example 3
Claire prepares a new operator’s training
Claire is workshop manager at a 50-employee industrial joinery near Brive. A new operator starts on Monday on the panel saw, a workstation where two incidents occurred last year. She wants a clear workstation sheet and an end-of-training assessment drawn from the approved operating procedure.
On-the-job training, before and after
Before
Training by “watching someone do it”
No record of what was learnt
An authorisation decided at the printer
After
A clear job description
Ten questions drawn from the work instruction
A grid completed by the tutor at the workstation
Request 1
Role: you write job descriptions for an industrial joinery firm with 50 employees.
Context: panel saw operator, day shift. Activities, as I see them: cut panels according to cutting lists, set the stops, check the dimensions of the first parts, label the parts and stack them on trolleys, maintain the saw at the end of the shift, report any defect. Certification required by our training plan: forklift operation. Reports to: the workshop manager (female).
Task: write the job description. Do not add any certification or requirement that is not listed here.
Format: one page in sections, then the questions to ask me to complete it.
Model answer
Job description · panel saw operator
Purpose
Cut panels to the cutting lists, with the required accuracy and safety, and prepare parts for the next workstations.
Main activities
- Cut panels to the cutting lists.
- Set the saw stops.
- Check the dimensions of the first parts in each batch.
- Label the parts and load them onto a trolley.
- Clean and maintain the saw at the end of the shift.
- Report any material, machine or dimensional defect.
Quality and safety responsibilities
- Follow the operating procedure and the workstation safety instructions.
- Only start a batch once the first parts have been checked.
Skills and authorisations
- Forklift driving, in line with the company training plan.
- Reading a cutting list and a tape measure.
Reports to
Workshop manager.
Questions to complete this description
1. Which indicators do you track at the workstation (scrap, parts per hour)?
2. What protective equipment is compulsory at the workstation?
3. How long is the training period for the workstation, and who is the mentor?
4. Does the operator change the blades, or is that a job for maintenance?
Claire answers the four questions: ear protection and safety glasses, fifteen days’ training with the mentor, blade changes reserved for maintenance. She adds these answers to the sheet.
Request 2
Using the attached approved operating procedure for the panel saw, revision C, prepare ten multiple-choice questions on the key points and safety, with the correct answer and the reason for it, then the tutor’s practical assessment grid: action, expected result, eliminatory yes or no. Everything comes from the operating procedure.
Model answer
Questions (extract)
1. The blade guard blocks your view of the cutting line. What do you do?
a) You lift it while cutting. b) You leave it in place and adjust the workstation lighting. c) You ask the mentor to remove it.
Correct answer: b. Reason: the operating procedure forbids working with the guard raised (step 3).
2. A first piece measures 1 mm more than the dimension on the cutting list. What do you do?
a) You start the run and correct on the following pieces. b) You adjust the stop, cut a new first piece and check it. c) You set it aside and carry on.
Correct answer: b. Reason: no run starts without a compliant first piece (step 6).
[…eight more questions…]
Practical assessment grid
Task | Expected | Disqualifying
Workstation preparation | Cutting list read, panels checked | No
Guard check | Guard in place, emergency stop tested | Yes
Stop setting | List dimension met on the first piece | No
Position during cutting | Hands outside the marked zone, push stick used | Yes
First-piece check | Measurement taken and recorded before the run | Yes
Tidying and maintenance | Workstation cleaned, faults reported | No
The workstation mentor reviews the questions and the grid, finds each point in the operating procedure, and replaces a question that is too easy with a real case from last year, without names.
What was checked before sending
The facts: each question and each criterion found in operating procedure revision C.
The requirements: no authorisation added to the job description; the added protective equipment comes from Claire.
Tone and audience: the questions reviewed by the mentor, one replaced with a real case.
An hour for the job description, the questionnaire and the grid, instead of half a day, and the same assessment for every new operator.
Vincent is quality manager at an 80-employee machining subcontractor in Mérignac. An aerospace equipment customer reports, on receipt of a batch of 400 rings, 12 parts out of tolerance on the inner diameter (22 mm, tolerance 0 to +0.021 mm), measured between +0.024 and +0.030 mm. Team leader’s notes: batch machined on CNC lathe no. 3, on the night shift, from Tuesday to Wednesday; boring tool insert changed on Tuesday at 11pm; inspection planned with a plug gauge on one part in fifty; the night’s inspection sheets show conforming parts; 1,200 rings of the same part number are in stock, machined the same week; a batch of 400 is due to ship to the same customer on Friday. The customer expects an initial response within 48 hours. Write the prompts that produce the non-conformance report and the start of the 8D response, then list Vincent’s checks.
Describe the characteristic without attaching the drawing or naming the customer.
Have the report filled in, separating facts from hypotheses.
Decide yourself on the immediate action for the stock and Friday’s batch.
Have the 8D prepared, with the steps not yet done marked “in progress”.
Check every figure and every date before sending.
See the answers
The trap in this case is jumping to conclusions. The insert changed at 11pm makes an attractive cause, but nothing proves it yet. The night’s inspection sheets say the parts conformed, yet a plug gauge check on one part in fifty may have missed twelve parts, or the gauge itself may be at fault. The 48-hour reply therefore covers the findings and making things safe, not the cause.
The first request: the product sheet
Role: you are a quality technician at a machining subcontractor and you are filling in a non-conformance report.
Context: aerospace customer. Batch of 400 bushings, internal reference B-22. The customer reports 12 parts out of tolerance on the inside diameter, 22 mm, tolerance 0 to +0.021 mm, measured between +0.024 and +0.030 mm. Batch machined on CNC lathe no. 3, night shift, Tuesday to Wednesday; boring tool insert changed on Tuesday at 11pm; plug gauge check on one part in fifty; night-shift inspection sheets compliant. Stock: 1,200 parts of the same reference, same week. A batch of 400 is due to ship to this customer on Friday.
Task: fill in the findings using only these facts, propose possible immediate measures for the stock and Friday's batch without deciding on them, and list the possible causes with the check to carry out for each. Do not conclude on any cause.
Format: a report in five sections, then the missing information.
Roughly what you should get
A sheet with a quantified finding, three possible immediate measures (quarantine the stock, carry out 100% sorting with the plug gauge and the measuring machine, hold back Friday’s batch) and four or five hypotheses: wear or setting error after the insert change, a worn or badly calibrated plug gauge, inspection frequency too low, thermal drift of the machine.
The second request: the start of the 8D
Role: you are quality manager and you are preparing the first 8D response, which an aerospace customer expects within 48 hours.
Context: [paste the approved report]. Measures decided: quarantine of the 1,200 parts in stock and of Friday’s batch, 100% sorting on the coordinate measuring machine by Thursday evening, check of the plug gauge’s calibration, inspection of machine no. 3. Team: quality manager, workshop supervisor, setter for lathe no. 3, metrology technician.
Task: complete steps 1 to 3 of the 8D with these elements. For steps 4 to 8, write “in progress” with the deadline [date]. No cause or corrective action that is not listed above.
Format: a table of the eight steps, then a six-line email to the customer, with no personal names, signed quality manager.
Roughly what you should get
An 8D with the first three steps completed, the other five dated and marked “in progress”, and a plain e-mail announcing the sorting and the next response.
Vincent’s checks
Inspection
What Vincent checks
The facts and figures
12 parts out of 400, i.e. 3%; deviations of +0.024 to +0.030 mm against an upper tolerance of +0.021 mm
The calculations
One check every fifty parts: 8 checks on the batch of 400, which lets a drift of a few hours slip through
Data
No drawings, customer names or operator names in the requests; the non-disclosure agreement reviewed
Tone and audience
Read as the customer’s quality buyer would: facts, a dated sort, no cause announced without proof
Practise
Three more exercises, from the most guided to the most demanding. The material is provided in full: copy it into your tool, then check your work against the criteria before opening the answers.
Level 1 · guided10 min
A workstation instruction that is too long
Write the four-line prompt that rewrites this instruction sheet in short sentences, without removing any safety instruction.
The material to work on
Current instructions for the degreasing station, posted in a 25-employee surface treatment workshop in Niort:
“Before any work on the degreasing tank, and in particular when topping up the product, which must be done exclusively by trained staff, the prescribed personal protective equipment must be worn, namely long-cuff nitrile gloves, sealed goggles and an apron; it must be checked that the tank extraction is working properly; and concentrated product must never be poured into the tank when it is hot, the temperature having to be below 40 °C, in accordance with the product’s safety data sheet, available in the red binder at the station. In the event of splashing, rinse thoroughly with water for fifteen minutes at the eyewash station to the right of the tank and inform the manager immediately.”
Check your work
The request copies out the instruction in full.
She requires short sentences, one action per line, verb first.
She forbids removing or softening any safety instruction.
She asks for the values (40 °C, fifteen minutes) and the locations (red binder, eyewash station on the right) to be kept.
She provides for sign-off by the safety manager.
See the answers
The request
Role: you write workstation instructions that can be read at a glance.
Context: here are the current instructions for the degreasing station: [paste the instructions in full].
Task: rewrite them in sentences of ten words or fewer, one action per line, verb first. Keep every safety instruction, every value (40°C, fifteen minutes) and every location (red binder, eyewash to the right of the tank). Add nothing, remove nothing.
Format: three parts, “Before”, “During”, “In case of splashes”, then the list of what you had to rephrase heavily, for checking.
Roughly what you should get
An instruction of ten to twelve lines in three parts, for example “Wear long-cuff nitrile gloves, sealed goggles, apron.” and “Never pour in the concentrate if the tank is above 40 °C.”
Compare the old and new instructions line by line: every item of protection, every value and every location must be there. The safety manager approves them before they are posted.
Level 2 · independent20 min
A night shift’s non-conformity report
Write the request that produces the non-conformity report from these notes, with facts and hypotheses kept separate, then the one that starts the five whys in questioning mode.
The material to work on
Notes from the night-shift team leader, laser-cutting workshop at a 45-employee metal fabrication firm in Bergerac:
“Thursday night into Friday. On the order for 300 stainless-steel 2 mm plates, internal ref. P-118, the 4am check found burrs on the internal cuts, 38 plates out of the 120 already made. I stopped the machine at 4:15am and set the 120 plates aside with a red label. I think it’s the nozzle, it looked damaged, but I didn’t change it, no spare nozzle in that size. Gas: the nitrogen cylinder was changed at 1am. The program is the same as last time, in March, when there was no problem. The order has to ship on Monday.”
Check your work
The findings restate the facts in figures: 38 plates out of 120, inspection at 4am, stoppage at 4.15am.
The damaged nozzle and the bottle change are hypotheses, each with its own check.
The immediate action covers quarantining the 120 plates.
The five whys request demands one question at a time and evidence for each answer.
No cause is concluded in the report.
See the answers
The sheet
Role: you are a quality technician at a sheet-metal fabrication shop and you are filling in a non-conformance report.
Context: [paste the team leader's notes in full].
Task: fill in the findings using only the facts in the notes (order, reference, quantities, times). Immediate measure: the one in the notes. Analysis: list the possible causes (nozzle, gas after the cylinder change, others you suggest), with the check to carry out in the workshop for each. Do not conclude on any cause. Flag Monday's deadline.
Format: a report in five sections, then the missing information.
Roughly what you should get
A report whose finding reads “38 plates out of 120 with burrs on the internal cut-outs, inspection at 4am”, three or four hypotheses with how to check them (nozzle inspected, gas purity and pressure, focal length, condition of the lens) and gaps (sheet metal batch number, settings recorded).
The five whys
Role: you are leading a five whys root-cause analysis with a workshop supervisor.
Context: finding: 38 out of 120 2 mm stainless steel plates have burrs on the internal cuts, laser cutting, Thursday night shift into Friday. I answer with the team, standing at the machine.
Task: ask one “why” question at a time and wait for my answer. Each time, ask how the fact was verified; an unverified answer becomes a hypothesis. Stop at a cause we can act on, or after seven questions.
Format: one question at a time, then a final table (why, answer, verified or hypothesis, evidence).
Roughly what you should get
A first question, such as “Why do burrs appear on the internal cut-outs and not on the outer contour?”, then an exchange at the team’s pace.
Level 3 · demanding case40 min
A setter who is leaving and a workshop that depends on him
You are Romain, industrial director of a 70-employee packaging manufacturer near Angoulême. Setter R1 retires in four months. With ChatGPT, and with operators referred to by their code: place the workstations in the “where to train first” matrix, propose a four-month training plan, list the operating procedures to write first and draft a one-page note to the managing director.
The material to work on
Workstations and trained operators (codes):
- Flexo printer, high criticality (70% of turnover goes through it): setting and plate changes, R1 only; running, O3, O4, O7
- Flatbed die-cutter, high criticality: setting, R1 and R2; running, O2, O5
- Folder-gluer, medium criticality: setting, R2; running, O1, O6, O8
- Palletising, low criticality: O1 to O8
- In-line quality control, high criticality: Q1 and Q2
Existing operating procedures:
- Flexo printer: running, revision B; setting and plate changes: none
- Die-cutter: setting and running, revision A, from 2019
- Folder-gluer: none
Constraints:
- R1 leaves on 31 March; he can give four half-days a week to training from December.
- O4 has shown interest in setting the printer; R2 is already fully loaded.
- The printer manufacturer offers a three-day setting course, on quote.
- This year’s training budget: to be confirmed by the managing director.
Check your work
Operators are referred to by their code in every request.
The flexo printer set-up comes out in the “stoppage risk” box, as the top priority.
The plan provides for writing the press set-up work instruction with R1, from dictations at the station, before he leaves.
The plan fits into R1’s four weekly half-days and names O4 as a candidate, without deciding.
Updating the 2019 work instruction for the cutting machine and writing one for the folding machine are ranked.
The note to the managing director sets out options costed in days and leaves budget and staffing decisions to the managing director.
See the answers
The heart of the case fits in one line: setting up the flexo press, a critical station, depends on R1 alone, and nothing is written down. Everything else comes second. The matrix shows it in a single cell, and the plan must devote most of R1’s half-days to two things: dictating his know-how at the station to write the work instruction, and training a successor.
The matrix and the training plan
Role: you are training manager at a packaging manufacturer with 70 employees and you are preparing a plan, without deciding anything.
Context: [paste the full document, operators coded].
Task: 1. place each activity (setting up or running each workstation, inspection) in a four-box matrix: high or low criticality, one or several operators trained; 2. propose a training plan from December to March, week by week, within a limit of four half-days per week for R1, including the dictations at the workstation to write the operating procedure for setting up the printing press; 3. rank the operating procedures to write or update in order of priority; 4. present two options for training R1’s successor in setting up the printing press (in-house training only, or in-house plus manufacturer training), with the number of days for each.
Format: the matrix as a table, the plan as a table (week, activity, who, duration), the list of operating procedures, then the two options.
Roughly what you should get
A matrix that places only the printer setting in “risk of stoppage”, a sixteen-week plan centred on R1 and O4, a list of three operating procedures (printer setting, update for the cutter, new one for the folder) and two options compared in days.
The note to the managing director
Role: you are the operations director writing to the managing director.
Context: [paste the approved matrix, plan and two options].
Task: write a one-page memo: the risk in one sentence (setting up the printing press, which accounts for 70% of turnover, depends on a single person who leaves on 31 March), the proposed plan, the two options with their number of days, and the three decisions required: the choice of option, the budget and the appointment of a successor. Do not make any decision on their behalf.
Format: one page, the decision required at the top, then the detail.
Roughly what you should get
A memo that opens with “Three decisions before 1 December”, quantifies the risk, sets out the plan and the options, and leaves the choice of successor to the managing director.
A two-page policy for your company, to complete in Word: authorised tools, prohibited data, review, disclosure of use, named contact, training and Article 4 of the AI Act.
Every request to copy from the course, including answers, practical examples and practice exercises, arranged by module and lesson, with filters to find the right one.
For each lesson, the main exercise and the three graded practice exercises with their materials, to do on paper or alongside ChatGPT; all the answers are grouped together at the end.
The course’s practical examples, job by job: the situation, the requests as they were written, the standard replies obtained and what was checked before using them.
The use cases from the twelve job-specific lessons in a filterable table: the lesson, the standard request and the data risk level (green, amber, red) with the precaution to take.
All the lessons in a single PDF: objectives, written course with its diagrams, tables and requests, common mistakes, exercise and key takeaways. The practice exercises and answers are in the workbook, the examples in the collection.
Your notes stay on this device; they are not sent anywhere.
A question for the tutor
A result that doesn’t match the model answer, a prompt that gets you nowhere, a case specific to your business: write to us with your prompt and the response you got. A Bonbay Académie trainer replies within 24 working hours, on your case.